Council planning record

Erection of replacement general industrial/storage building (Use Class B2/B8) following demolition of existing building.

Wood Bank Works Hesketh Street Heaton Norris Stockport SK4 1TF

RegisteredReference: DC/099148Stockport Metropolitan Borough Council

Last published check: 22 Sept 2026, 08:27. Check the council record for more recent changes.

Application location

Wood Bank Works Hesketh Street Heaton Norris Stockport SK4 1TF

This record has no verified map location.

View council map

Application summary

Status
Registered
Application type
Full Application
Received
21 May 2026
Validated
19 Jun 2026
Determination deadline
14 Aug 2026
Local authority
Stockport Metropolitan Borough Council

Application overview

Erection of replacement general industrial/storage building (Use Class B2/B8) following demolition of existing building.

Proposal details

Reference
DC/099148
Alternative references
PP-14918177
Ward
Reddish South (Here)
Agent
Seymour Planning Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
BIODIVERSITY NET GAINReport · PDF19 Jun 2026View
Energy StatementEnergy Statement · PDF19 Jun 2026View
APPLICATIONFORMREDACTEDApplicationNoPersonalData · PDF21 May 2026View
SITE LOCATION PLAN1250 Plan · PDF21 May 2026View
EXISTING SITE ROOF PLANPlan · PDF21 May 2026View
EXISTING SITE FLOOR PLANPlan · PDF21 May 2026View
EXISTING ELEVATIONSPlan · PDF21 May 2026View
EXISTING ELEVATIONSPlan · PDF21 May 2026View
PROPOSED SITE ROOF PLANPlan · PDF21 May 2026View
PROPOSED SITE PLANPlan · PDF21 May 2026View
PROPOSED PLANPlan · PDF21 May 2026View
PROPOSED ELEVATIONSPlan · PDF21 May 2026View
PROPOSED ELEVATIONSPlan · PDF21 May 2026View
NELSTROPS PBRA REP 22 4 26Report · PDF21 May 2026View
SP ALBION MILL WOODBANK PSReport · PDF21 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.