Listed Building consent for: STAFF ROOM: - Convert existing store room at first floor into new staff room and female change and toilet facilities. Reconfigured by introducing stud partitions. - New sanitary ware, furniture and staff room items introduced. - New lighting introduced - new spotlights and BL LED - All staff areas to receive new plastered wall finishes with white emulsion paint, new and existing doors to be decorated, new and existing skirting boards to be decorated, floor finishes to be replaced with Altro wood safety flooring. - New suspended grid ceiling to be installed. - Existing floor to be levelled on pedestal system � preserving the floor boards beneath. - New HVAC and condenser as located on plans STORE TO BASEMENT : - New racking to basement store to be installed STAFF FACILITIES TO EXISTING STAFF ROOM - Existing staff facilities to be amended to new male toilet and change. - New sanitary ware, furniture and staff room items introduced. - New lighting introduced - new spotlights and BL LED. - All staff areas to receive new plastered wall finishes with white emulsion paint, new and existing doors to be decorated, new and existing skirting boards to be decorated, floor finishes to be replaced with Altro wood safety flooring. - New suspended grid ceiling to be installed.
2 THE GREEN DRAGON , ST EDWARD STREET , LEEK , STAFFORDSHIRE , ST13 5DS
Listed Building consent for: STAFF ROOM: - Convert existing store room at first floor into new staff room and female change and toilet facilities. Reconfigured by introducing stud partitions. - New sanitary ware, furniture and staff room items introduced. - New lighting introduced - new spotlights and BL LED - All staff areas to receive new plastered wall finishes with white emulsion paint, new and existing doors to be decorated, new and existing skirting boards to be decorated, floor finishes to be replaced with Altro wood safety flooring. - New suspended grid ceiling to be installed. - Existing floor to be levelled on pedestal system � preserving the floor boards beneath. - New HVAC and condenser as located on plans STORE TO BASEMENT : - New racking to basement store to be installed STAFF FACILITIES TO EXISTING STAFF ROOM - Existing staff facilities to be amended to new male toilet and change. - New sanitary ware, furniture and staff room items introduced. - New lighting introduced - new spotlights and BL LED. - All staff areas to receive new plastered wall finishes with white emulsion paint, new and existing doors to be decorated, new and existing skirting boards to be decorated, floor finishes to be replaced with Altro wood safety flooring. - New suspended grid ceiling to be installed.
Reference
SMD/2026/0360
Agent
Mrs Maryam AljameelDVA Ventures Limited
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.