WithdrawnCouncil status: WDN

Removal of the 2 x existing signs and installing 3 x new signs (2 of these signs will go where the existing signs currently are). The new sign is to be located on the building down Strangman Street. The only differences they are looking to make is 1. to increase the height and width of the front sign to match the 'ribbon' around the building, on the front sign and new side sign. 2. To add internal illumination to all signs, this will be only to internally illuminate the text on the signs. The colours and words remain the same as existing. Please note, the internal illumination is for the text only and this will only be turned on during the daytime/working hours. Please see drawings attached for reference

Leek United Building Society , 50 St Edward Street , Leek , Staffordshire , ST13 5DL

Staffordshire Moorlands District CouncilReference SMD/2021/0591Advertisement Consent

Last published check: 22 Sept 2026, 05:33. Check the council record for more recent changes.

Status and dates

Last published check: 22 Sept 2026, 05:33 (UK)

  1. DoneReceived8 Sept 2021
  2. DoneValidated11 Oct 2021
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. ClosedWithdrawnWDN

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (3)
  1. received

    Published milestoneCouncil source
  2. validated

    Published milestoneCouncil source
  3. decision_made

    Published milestoneCouncil source
Application type
Advertisement Consent
Documents
13 published

Proposal

Removal of the 2 x existing signs and installing 3 x new signs (2 of these signs will go where the existing signs currently are). The new sign is to be located on the building down Strangman Street. The only differences they are looking to make is 1. to increase the height and width of the front sign to match the 'ribbon' around the building, on the front sign and new side sign. 2. To add internal illumination to all signs, this will be only to internally illuminate the text on the signs. The colours and words remain the same as existing. Please note, the internal illumination is for the text only and this will only be turned on during the daytime/working hours. Please see drawings attached for reference

Reference
SMD/2021/0591
Agent
Mis Abbey BoobyerResolution Interiors

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • 5980-LBS_ST_EDWARDS-RIL-00-XX-DR-I-0001-EX_ELEV-P3.Attachment12 Oct 2021View
  • 5980-LBS_ST_EDWARDS-RIL-00-XX-DR-I-0002-ELEV-P3-R1 SUPERSEDEDAttachment12 Oct 2021View
  • Application FormAttachment12 Oct 2021View
  • Leek sign detail Proposal 007 - SCALE. SUPERSEDEDAttachment12 Oct 2021View
  • Heritage & Lighting Statement - Leek United.Attachment12 Oct 2021View
  • REV 1 - ExistingAttachment12 Oct 2021View
  • REV 2 - ExistingAttachment12 Oct 2021View
  • REV 3 - Existing WalAttachment12 Oct 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Application Withdrawn
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.