Council planning record

The phased extraction of approximately 600,000 tonnes of sand and gravel as a southern extension (part in Staffordshire) to Willington Quarry (in Derbyshire) with restoration to conservation wetland, lowland meadow, biodiversity enhancements and flood attenuation measures; retention of existing aggregate processing plant, silt lagoon, ready-mix concrete plant, access / haul roads and soil bunds, construction of a temporary vehicular bridge over the River Dove and the permanent diversion of Public Right of Way (PRoW) - Burton CP10

Willington Quarry, Castleway Lane, Eggington, Derbyshire, DE65 6BW

This case has been determined and the decision was issued on 06 Mar 2025.Reference: SCC/22/0107/FULL-ESStaffordshire County Council

Last published check: 30 Sept 2026, 12:13. Check the council record for more recent changes.

Application location

Willington Quarry, Castleway Lane, Eggington, Derbyshire, DE65 6BW

This record has no verified map location.

Application summary

Status
This case has been determined and the decision was issued on 06 Mar 2025.
Application type
Application for Full Planning Permission for a 'major development' (accompanied by an Environmental Statement)
Received
22 Aug 2022
Validated
Not published
Determination deadline
1 Apr 2023
Local authority
Staffordshire County Council

Application overview

The phased extraction of approximately 600,000 tonnes of sand and gravel as a southern extension (part in Staffordshire) to Willington Quarry (in Derbyshire) with restoration to conservation wetland, lowland meadow, biodiversity enhancements and flood attenuation measures; retention of existing aggregate processing plant, silt lagoon, ready-mix concrete plant, access / haul roads and soil bunds, construction of a temporary vehicular bridge over the River Dove and the permanent diversion of Public Right of Way (PRoW) - Burton CP10

Proposal details

Reference
SCC/22/0107/FULL-ES
Ward
Burton Town ED
Parish
Burton
UPRN
MAN000000000003764

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 101 of 101

DocumentPublishedAction
Applicant submission letter dated 19 August 2022 (Redacted)2 Approved document16 Dec 2022View
Application Form (Staffordshire County Council) dated 14 November 2022 (Redacted)2 Approved document16 Dec 2022View
Certificate B (Staffordshire County Council) dated 14 November 2022 (Redacted)2 Approved document16 Dec 2022View
Application Form (Derbyshire County Council) dated 14 November 2022 (Redacted)2 Approved document16 Dec 2022View
Mineral Development Statement2 Approved document16 Dec 2022View
Planning Statement (PS) dated November 2022 (Redacted)2 Approved document16 Dec 2022View
PS Appendix 1 (Pre-Application Advice Derbyshire County Council)2 Approved document16 Dec 2022View
PS Appendix 2 (Pre-Application Advice Derbyshire County Council)2 Approved document16 Dec 2022View
PS Appendix 3 (Sustainability Overview)2 Approved document16 Dec 2022View
PS Appendix 4 (Cemex Position on Climate Change)2 Approved document16 Dec 2022View
PS Appendix 5 (Arboricultural Impact Assessment dated July 2022)2 Approved document16 Dec 2022View
PS Appendix 5 (Tree Survey, Constraints and Protection Plans)3 Approved plan16 Dec 2022View
PS Appendix 6-1 (Annual Aftercare Table)2 Approved document16 Dec 2022View
PS Appendix 6-2 (Annual Programme)2 Approved document16 Dec 2022View
PS Appendix 6-3 (Field Gate Drawing No L FE 25)3 Approved plan16 Dec 2022View
PS Appendix 6-4 (Rabbit Proof Fencing Drawing No L FE 05)3 Approved plan16 Dec 2022View
PS Appendix 6-5 (Timber Post and Stockproof Wire Fence Drawing No L FE 01)3 Approved plan16 Dec 2022View
Statement of Community Involvement dated July 2022 (Redacted)2 Approved document16 Dec 2022View
Environmental Statement (ES) Non-Technical Summary dated November 2022 (Redacted)2 Approved document16 Dec 2022View
Environmental Statement (ES) (Introduction and Chapters 1 to 7) (Redacted)2 Approved document16 Dec 2022View
ES Chapter 8 (Landscape and Visual Impact)2 Approved document16 Dec 2022View
ES Chapter 9 (Ecology and Conservation)2 Approved document16 Dec 2022View
ES Chapter 10 (Noise)2 Approved document16 Dec 2022View
ES Chapter 11 (Traffic and Transportation)2 Approved document16 Dec 2022View
ES Chapter 12 (The Water Environment)2 Approved document16 Dec 2022View
ES Chapter 13 (Air Quality and Dust)2 Approved document16 Dec 2022View
ES Chapter 14 (Heritage Assets Plans and Figures)2 Approved document16 Dec 2022View
SUPERSEDED ES Chapter 15 (Agricultural Land and Soil Handling)2 Approved document16 Dec 2022View
ES Chapter 17 (Conclusion)2 Approved document16 Dec 2022View
ES Appendix 1 Landscape and Visual Impact Assessment dated May 20222 Approved document16 Dec 2022View
ES Appendix 2-1 Preliminary Ecological Report dated 25 March 20222 Approved document16 Dec 2022View
ES Appendix 2-2 Great Crested Newt Survey Report dated 6 June 20222 Approved document16 Dec 2022View
ES Appendix 2-3 Reptile Presence Survey Report dated 4 July 20222 Approved document16 Dec 2022View
ES Appendix 2-4 Wintering Bird Survey Report dated 3 May 20222 Approved document16 Dec 2022View
ES Appendix 2-7 Breeding Bird Survey Report dated 8 December 20222 Approved document16 Dec 2022View
ES Appendix 2-8 Biodiversity Net Gain Report - Appendix E2 Biodiversity Metric (Version 3-1)2 Approved document16 Dec 2022View
ES Appendix 2-5 Bat Activity Survey Report dated 8 December 20222 Approved document16 Dec 2022View
ES Appendix 2-6 Otter and Water Vole Survey Report dated 8 December 20222 Approved document16 Dec 2022View
ES Appendix 2-8 Biodiversity Net Gain Report dated 8 December 20222 Approved document16 Dec 2022View
ES Appendix 3 Noise Impact Assessment dated 15 June 20222 Approved document16 Dec 2022View
ES Appendix 4 Transport Statement dated June 20222 Approved document16 Dec 2022View
SUPERSEDED ES Appendix 5 Flood Risk Assessment dated June 20222 Approved document16 Dec 2022View
ES Appendix 6 Hydrogeological Impact Assessment - July 20222 Approved document16 Dec 2022View
ES Appendix 7 Air Quality Dust Assessment2 Approved document16 Dec 2022View
ES Appendix 7 Air Quality Dust Assessment Appendices2 Approved document16 Dec 2022View
ES Appendix 8-1 Heritage Assessment dated July 20222 Approved document16 Dec 2022View
ES Appendix 8-1 Heritage Assessment Appendix A Part 12 Approved document16 Dec 2022View
ES Appendix 8-1 Heritage Assessment Appendix A Part 22 Approved document16 Dec 2022View
ES Appendix 8-1 Heritage Assessment Appendix B (Photo Images)4 Application document16 Dec 2022View
ES Appendix 8-2 Geophysical Survey dated June 20224 Application document16 Dec 2022View
ES Appendix 9-5 Description of Individual Soil Auger Borings2 Approved document16 Dec 2022View
ES Appendix 9-5 Key to Soil Auger Boring Abbreviations2 Approved document16 Dec 2022View
ES Appendix 9-6 Soil Profile Pit Description2 Approved document16 Dec 2022View
ES Appendix 9-7 Topsoil Soil Analysis Results2 Approved document16 Dec 2022View
ES Appendix 9-8 Provisional Agricultural Land Classification Plan3 Approved plan16 Dec 2022View
ES Appendix 9-9 Post 1988 Agricultural Land Classification Surveys Plan3 Approved plan16 Dec 2022View
ES Appendix 9-10 Flood Map for Planning dated 29 March 20223 Approved plan16 Dec 2022View
Site Location Plan (Drawing No 21 10 P4 WILL 1)3 Approved plan16 Dec 2022View
Site Context Plan (Drawing No 22 07 P4 WILL 2)3 Approved plan16 Dec 2022View
Phasing Plans (Drawing No 22-5-2210)3 Approved plan16 Dec 2022View
Restoration Masterplan (Drawing No 22 03 WILL 210 MASTERPLAN)3 Approved plan16 Dec 2022View
Topographic Survey (Drawing No wil sur0920t pw 1250 a0m)3 Approved plan16 Dec 2022View
Plant Site Area (Drawing No 15 CO22 WILL 102 B)3 Approved plan16 Dec 2022View
Bridge Layout Plan (Drawing No 8652 MAB XX XX DRY 0001)3 Approved plan16 Dec 2022View
Site Notice - 11 January 20237 Publicity9 Jan 2023View
Railway Land Notice - Article 167 Publicity9 Jan 2023View
Neighbour Notification Letter - 3 January 20237 Publicity9 Jan 2023View
Crestwood Environmental letter dated 3 March 2023 - response to Environmental Advice Team Ecology comments (1)2 Approved document6 Mar 2023View
WBM Acoustic Consultants note 23 February 2023 - response to South Derbyshire District Council EHO and Rep comments2 Approved document6 Mar 2023View
JBA Consulting covering letter dated 3 March 2023 - updated Flood Risk Assessment2 Approved document6 Mar 2023View
ES Appendix 5 Flood Risk Assessment - March 20232 Approved document6 Mar 2023View
JBA Consulting response to comments on the historic environment - 8 March 2023 (Redacted)2 Approved document8 Mar 2023View
Restoration Plan (Drawing No 22 03 WILL CHALL REST - Rev A) - pillbox retention added3 Approved plan8 Mar 2023View
Proposed Temporary Footpath Diversion Plan (Drawing No 23-03-P4-WILL-5)3 Approved plan21 Mar 2023View
Cemex letter - 4 May 2023 - response to comments on the footpath diversion2 Approved document4 May 2023View
ES Appendix 9-1 Soil Sample Location Plan (Drawing No Willington App1-3 17 05 23 dwg App1)3 Approved plan25 May 2023View
ES Appendix 9-2 Soil Type Distribution Plan (Drawing No Willington App1-3 17 05 23 dwg App3)3 Approved plan25 May 2023View
ES Appendix 9-3 Distribution of Agricultural Land Classification Grades (Drawing no Willington_App1-3_17 05 23 dwg App3a)2 Approved document25 May 2023View
ES Appendix 9-11 Phasing Plans 1A to 3C (Drawing no 23-05-2042)3 Approved plan25 May 2023View
ES Appendix 9-12 Restoration Soil Details (Drawing no 23-05-WILL-CHALL-210-SOILS)3 Approved plan25 May 2023View
Bridge Location Plan (Drawing No TD 22057 Rev C)3 Approved plan23 Jun 2023View
CE letter dated 21 June 2023 - response to Environmental Advice Ecology comments (2)2 Approved document23 Jun 2023View
Bridge Construction Management Plan - June 20232 Approved document17 Jul 2023View
Crestwood Environmental letter dated 29 March 2023 - response to Derbyshire Wildlife Trust2 Approved document5 Dec 2023View
SCC email - 19 October 2023 - EIA Regulation 25 request to confirm further informationAgent / Applicant5 Dec 2023View
CEMEX - 16 November 2023 - response to Reg 25 requestAgent / Applicant5 Dec 2023View
Crestwood Environmental letter dated 17 May 2023 – further response to DWTs comments sent to DCC2 Approved document5 Dec 2023View
PS Appendix 6-6 (Topsoil Use) (Background Notes)2 Approved document5 Dec 2023View
ES Chapter 15 (Agricultural Land and Soil Handling) (Revision 3)2 Approved document9 Feb 2024View
Phasing Plans (WITH VOLUMES) (Drawing No 23-5-2042)3 Approved plan9 Feb 2024View
PS Appendix 6 (Landscape Restoration and Aftercare Details - Rev C dated 14 February 2024)2 Approved document23 Feb 2024View
List of Further Information to update the Environmental Statement - UPDATEDBackground document23 Feb 2024View
ES Chapter 16 (Cumulatives)2 Approved document6 Jun 2024View
Link to Planning Committee Agenda - Report and Minutes - Willington Quarry -1 August 20240 Decision - Letter / Notice / Report25 Jul 2024View
Cadent Gas Plans6 Consultation13 Dec 2024View
Cadent Gas response dated 23 August 20226 Consultation13 Dec 2024View
Western Power Distribution response dated 23 August 20226 Consultation13 Dec 2024View
Western Power Distribution Plans6 Consultation13 Dec 2024View
Section 106 agreement dated 5 March 20251 S106 / MoU6 Mar 2025View
Decision Notice dated 6 March 20250 Decision - Letter / Notice / Report11 Apr 2025View
Planning Committee Report dated 1 August 20240 Decision - Letter / Notice / Report11 Apr 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Application date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Site notice date

    Published milestoneCouncil source
  5. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Press notice start date

    Published milestoneCouncil source
  8. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision date

    Published milestoneCouncil source
  10. Dispatch date

    Published milestoneCouncil source
  11. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

GRANTED - WITH CONDITIONS
Link to Planning Committee Agenda - Report and Minutes - Willington Quarry -1 August 2024 Decision Notice dated 6 March 2025 Planning Committee Report dated 1 August 2024
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.