Proposed sand and gravel extraction, the erection of plant and infrastructure and creation of new access, in order to supply the HS2 project with ready mix concrete, with export of surplus sand and gravel

Land South of the A513, Orgreave, Alrewas, Staffordshire (to be known as Pyford Brook Quarry)

This case has been determined and the decision was issued on 16 Mar 2022.Reference: L.20/03/867 MStaffordshire County Council

Last published check: 28 Sept 2026, 14:27. Check the council record for more recent changes.

Application location

Land South of the A513, Orgreave, Alrewas, Staffordshire (to be known as Pyford Brook Quarry)

This record has no verified map location.

Application summary

Status
This case has been determined and the decision was issued on 16 Mar 2022.
Application type
Application for Full Planning Permission for a 'major development' (accompanied by an Environmental Statement)
Received
11 May 2020
Validated
11 May 2021
Determination deadline
31 Aug 2020
Local authority
Staffordshire County Council

Application overview

Proposed sand and gravel extraction, the erection of plant and infrastructure and creation of new access, in order to supply the HS2 project with ready mix concrete, with export of surplus sand and gravel

Proposal details

Reference
L.20/03/867 M
Ward
Lichfield Rural North ED
Parish
Fradley and Steethay, Alrewas
UPRN
MAN014468

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 139 of 139

DocumentPublishedAction
1710 Appendix 4 3 to ES - Palaeolithic Potential Statement - L 20 03 867 M.PDF4 Application document16 Oct 2020View
3402 Volume 2 - Environmental Statement (ES) - Chapter 16 - Glossary - L 20 03 867 M.PDF4 Application document10 Mar 2020View
3710 Appendix 7 to ES - Plan 1 Soil Survey Locations - L 20 03 867 M.PDF4 Application document25 Feb 2020View
1130 Response to Parish Councils and others - L 20 03 867 M.PDF4 Application document16 Oct 2020View
1898 Revised Volume 3 - Non-Technical Summary Rev A October 2020 - L 20 03 867 M.PDF4 Application document16 Nov 2020View
Large Vehicle Parking swept path assessment-bays 5-8 (Dwg no J000122/ATR107)3 Approved plan11 Jan 2021View
3895 Plan showing HS2 Construction Area N2 - L 20 03 867 M.PDF5 Application plan10 Jan 2020View
Proposed Site Access Arrangement - (Dwg no J000122/SK101 Rev A)3 Approved plan28 Jan 2021View
0450 Need Argument addendum March 21 - L 20 03 867 M.PDF4 Application document19 Mar 2021View
0370 ALR-002G - Photomontages Viewpoints 2 6 and 7 - L 20 03 867 M.PDF4 Application document9 Mar 2021View
3690 Appendix 6 1 to ES - Transport Assessment Part 5 - L 20 03 867 M.PDF4 Application document10 Mar 2020View
Revised Appendix 3.6 to ES - Otter, Water Vole and Crayfish Report Rev A October 20202 Approved document16 Oct 2020View
3660 Appendix 6 1 to ES - Transport Assessment Part 2 - L 20 03 867 M.PDF4 Application document10 Mar 2020View
Revised Appendix 5.6 to ES - Dewatering Assessment Rev A October 20202 Approved document16 Oct 2020View
Tree plans (survey) (Dwg no 1909-L2-ALWAS-1-2-3 TPP TCP Rev L)3 Approved plan2 Mar 2021View
0305 Manual turning count - Alrewas J3 - L 20 03 867 M.XLSM4 Application document18 Sept 2019View
3510 Appendix 3 9 to ES - Policy Details - L 20 03 867 M.PDF4 Application document5 Mar 2020View
3560 Appendix 5 1 to ES - Alrewas Walkover Album - L 20 03 867 M.PDF4 Application document19 Feb 2020View
Restoration Plan: Marginal Details for Habitat Enhancement (Dwg No 20-09 ALREW P1 1222 REST DETAIL)3 Approved plan16 Oct 2020View
1515 Applicant - Response to comments on noise assessment dated 17 August 2020 - L 20 03 867 M.PDF4 Application document20 Aug 2020View
Figure 2 in Appendix 5a to Volume 1 - Field Gate2 Approved document20 Jan 2020View
1340 Revised Volume 2 - Environmental Statement (ES) - Chapter 9 - Landscape Figure 9 1 Rev A September 2020 - L 20 03 867 M.PDF4 Application document16 Oct 2020View
Revised Appendix 2.3 to ES - Landscape and Visual Sections Rev A September 20202 Approved document16 Oct 2020View
0301 Traffic count data - ATC 1 North site - L 20 03 867 M.XLSX4 Application document20 Sept 2019View
0302 Traffic count data - ATC 2 East site - L 20 03 867 M.XLSX4 Application document20 Sept 2019View
1390 Revised Volume 2 - Environmental Statement (ES) - Chapter 11 - Fig 11 1 HER data - L 20 03 867 M.PDF4 Application document16 Oct 2020View
Haul Road swept path assessment (Dwg no J000122/ATR102A)3 Approved plan16 Dec 2020View
3720 Appendix 7 to ES - Plan 2 Agricultural Land Classification - Grades - L 20 03 867 M.PDF4 Application document25 Feb 2020View
Application form dated 13 March 20202 Approved document27 May 2020View
0516 Rainbow map 12 for HS2 construction supply routes - L 20 03 867 M.PDF4 Application document28 Jun 2016View
Revised Appendix 3.12 to ES - Biodiversity Net Gain calculation Rev A March 20212 Approved document19 Mar 2021View
Appendix 4 to Volume 1 - Geological Summary Report2 Approved document5 Mar 2020View
Revised Appendix 3.1 to ES - Preliminary Ecological Appraisal Rev A October 20202 Approved document16 Oct 2020View
1160 Letter dated 22 May 2020 from Balfour Beatty VINCI (BBV) - L 20 03 867 M(2)_Redacted.PDF4 Application document11 Nov 2020View
3590 Appendix 5 4 to ES - Surface Water Quality data - L 20 03 867 M.PDF4 Application document19 Feb 2020View
Volume 2 - Environmental Statement (ES) - Chapter 14 - Soils2 Approved document25 Feb 2020View
Revised Volume 2 - Environmental Statement (ES) - Chapter 9 - Landscape Rev B September 20202 Approved document16 Oct 2020View
0430 Ecology Response to Comments Mar 21 - L 20 03 867 M.PDF4 Application document22 Mar 2021View
3297 Appendix 8 to Volume 1- Development Considerations in the Area of Search - L 20 03 867 M.PDF4 Application document5 May 2020View
Revised Appendix 3.7 to ES - Breeding Bird Survey Rev A October 20202 Approved document16 Oct 2020View
0303 Manual turning count - Alrewas J1 - L 20 03 867 M.XLSM4 Application document18 Sept 2019View
1120 List of Further Revised information submitted October 2020 - L 20 03 867 M.PDF4 Application document16 Oct 2020View
Revised Appendix 3.5 to ES - Bat Activity Survey Report Rev A October 20202 Approved document16 Oct 2020View
0440 Construction Phase Access Plan - (Dwg no TD 21012 Rev B) - L 20 03 867 M.PDF5 Application plan23 Mar 2021View
0510 Batching Plant Locations - L 20 03 867 M.PDF4 Application document12 Sept 2018View
3800 Location Context Plan - (Dwg No 19 09 P2 ALWAS 1) - L 20 03 867 M.PDF5 Application plan28 Jan 2020View
Appendix 3 to Volume 1 - Arboricultural Impact Assessment2 Approved document27 Feb 2020View
Revised Volume 2 - Environmental Statement (ES) - Chapter 8 - Air Quality Rev A September 20202 Approved document16 Oct 2020View
1690 Revised Appendix 4 1 to ES - Archaeology Desk-Based Assessment Rev A October 2020 - L 20 03 867 M.PDF4 Application document16 Oct 2020View
Revised Volume 2 - Environmental Statement (ES) - Chapter 15 - Conclusion Rev A October 20202 Approved document16 Oct 2020View
Appendix 5.8 to ES - Site Survey Hydro Details and Boreholes (Dwg No ALS Site OGL BH Hydro & Servcs 0919)3 Approved plan30 Sept 2019View
3890 Site Plan with ducting services (Dwg No 1909 P2 ALWAS _Duct Servs) - L 20 03 867 M.PDF5 Application plan30 Apr 2020View
Proposed Site Access Arrangement Visibility splays (Dwg no J000122/ SK102 Rev B)3 Approved plan28 Jan 2021View
3295 Appendix 7 to Volume 1 - Statement of Community Involvement - L 20 03 867 M.PDF4 Application document13 Mar 2020View
0480 Cappers Lane Compound Plan - L 20 03 867 M.PDF4 Application document4 Oct 2019View
0470 Carbon savings - L 20 03 867 M.PDF4 Application document1 Mar 2021View
Restoration Planting Details (Dwg no 21-01-ALREW-P2-1222-RES Pl DETL Rev A)3 Approved plan19 Mar 2021View
0500 Asset Volumes - Plants B and C - L 20 03 867 M.PDF4 Application document19 Mar 2021View
1350 Revised Volume 2 - Environmental Statement (ES) - Chapter 9 - Landscape Figure 9 2 Rev A September 2020 - L 20 03 867 M.PDF4 Application document16 Oct 2020View
Volume 2 - Environmental Statement (ES) - Chapter 13 - Transport2 Approved document28 Feb 2020View
Aggregate Plant Elevation (Dwg No .TD 22021 Rev E Sheet 4 of 4)3 Approved plan16 Oct 2020View
Revised Appendix 3.12 to ES - Appendix E1 - Biodiversity Metric Rev B March 20212 Approved document9 Apr 2018View
Large Vehicle Parking swept path assessment-bays1-4 (dwg no J000122/ATR106)3 Approved plan11 Jan 2021View
Volume 2 - Environmental Statement (ES) - Chapter 12 - Hydrogeology - Figures 12.1 - 12.192 Approved document14 Jul 2020View
Neighbour notification - L 20 03 867 M.PDF7 Publicity23 Jun 2020View
0340 Response to flooding petition - L 20 03 867 M.PDF4 Application document8 Mar 2021View
Large Vehicle Parking swept path assessment-bays 9-12 (Dwg no J000122/ATR108)3 Approved plan11 Jan 2021View
Revised Appendix 3.3 to ES - Great Crested Newt Method Statement Rev A October 20202 Approved document16 Oct 2020View
0512 Rainbow map 10 for HS2 construction supply routes - Watling Street.PDF4 Application document1 Jul 2016View
Revised Appendix 1 to ES - Noise Rev A September 20202 Approved document16 Oct 2020View
Revised - Access swept path assessment - left in-right out - (Dwg no ATR103A)3 Approved plan28 Jan 2021View
Phasing Plans (Dwg no 20-01/P2/ALWAS/6F Rev F Stages 1 – 9)3 Approved plan22 Mar 2021View
0490 A515 Compound Plan - L 20 03 867 M.PDF4 Application document16 Mar 2021View
Post Restoration Access (Dwg no J000122/SK201 Rev A)3 Approved plan22 Jul 2020View
Revised Volume 2 - Environmental Statement (ES) - Chapter 12 - Hydrogeology and Flood Risk Rev A October 20202 Approved document16 Oct 2020View
3410 Appendix 2 1 to ES - Landscape and Visual Assessment Methodology - L 20 03 867 M.PDF4 Application document26 Feb 2020View
Appendix 5.7 to ES - Alrewas Orgreave Quarry: Drainage Strategy February 20212 Approved document11 Feb 2021View
0514 Rainbow map 11 for HS2 construction supply routes - A38 - L 20 03 867 M.PDF4 Application document2 Oct 2020View
Haul Road swept path assessment - articulated vehicle (Dwg no J000122/ATR105)3 Approved plan11 Jan 2021View
Plant Layout and Traffic Management (Dwg no TD 22021 Sheet 2of 4 Rev E2)3 Approved plan22 Mar 2021View
Concept Restoration Masterplan (Dwg no 20-02-ALREW-P2-1222-RES Rev D)3 Approved plan18 Mar 2021View
3580 Appendix 5 3 to ES - Geophysics Survey by SOMO - L 20 03 867 M.PDF4 Application document17 Mar 2020View
Revised Volume 2 - Environmental Statement (ES) - Chapter 10 - Ecology Rev A October 20202 Approved document16 Oct 2020View
Revised Volume 2 - Environmental Statement (ES) - Chapters 1 to 6 Rev B October 20202 Approved document16 Oct 2020View
Revised Appendix 5a to Volume 1 - Outline Restoration and Aftercare Scheme Rev C March 20212 Approved document22 Mar 2021View
Revised Volume 1 Planning, Mineral and Economic Development Statement Rev B October 20202 Approved document23 Oct 2020View
3570 Appendix 5 2 to ES - Ground Investigations by Geotechnics - L 20 03 867 M.PDF4 Application document17 Mar 2020View
0380 Response to Landscape Comments - L 20 03 867 M.PDF4 Application document11 Mar 2021View
Revised Appendix 3.2 to ES - Great Crested Newt Survey Rev A October 20202 Approved document16 Oct 2020View
1730 Appendix 5 9 to ES - Addendum to Chapter 12 - Trees and Archaeology - L 20 03 867 M.PDF4 Application document16 Oct 2020View
Revised Appendix 2.2 to ES - Landscape Sensitivity Assessment Rev A September 20202 Approved document16 Oct 2020View
Written Scheme of Investigation - Version 1 March 20212 Approved document3 Mar 2021View
0202 List of Further Revised information - March 21 - L 20 03 867 M.PDF4 Application document25 Mar 2021View
3650 Appendix 6 1 to ES - Transport Assessment Part 1 - L 20 03 867 M.PDF4 Application document10 Mar 2020View
3700 Appendix 7 to ES - Agricultural Land Assessment and Soil Resource Report - L 20 03 867 M.PDF4 Application document25 Feb 2020View
3600 Appendix 5 5 to ES - Groundwater quality - L 20 03 867 M.PDF4 Application document19 Feb 2020View
3670 Appendix 6 1 to ES - Transport Assessment Part 3 - L 20 03 867 M.PDF4 Application document10 Mar 2020View
1680 Appendix 3 14 to ES - Sensitive Lighting Plan - L 20 03 867 M.PDF4 Application document16 Oct 2020View
Revised Appendix 5c to Volume 1- Annual Aftercare Management Report September 20202 Approved document16 Oct 2020View
Proposed Site Plan (Dwg no TD 22021 Sheet 1 of 4 Rev E2)3 Approved plan22 Feb 2021View
Existing Site Plan (Dwg No 19/09/P2/ALWAS/2C)3 Approved plan28 Jan 2020View
1400 Revised Volume 2 - Environmental Statement (ES) - Chapter 11 - Fig 11 2 Geophysics survey results - L 20 03 867 M.PDF4 Application document16 Oct 2020View
Revised Appendix 5.10 to ES - Water Management Plan Rev A March 20212 Approved document22 Mar 2021View
Infrastructure details - Plans and Elevations (Dwg No 20-01/P2-ALWAS 5 Rev C)3 Approved plan16 Oct 2020View
3680 Appendix 6 1 to ES - Transport Assessment Part 4 - L 20 03 867 M.PDF4 Application document10 Mar 2020View
Appendix 1.7 to ES - Noise Management and Monitoring Plan2 Approved document16 Oct 2020View
Figure 1 in Appendix 5a to Volume 1 - Timber Post & Stockproof Wire Fence2 Approved document20 Jan 2020View
Appendix 5b to Volume 1 - Annual Schedule of Landscape Operations2 Approved document26 Feb 2020View
Revised Appendix 3.8 to ES - Terrestrial Invertebrate Scoping Survey Rev A October 20202 Approved document16 Oct 2020View
3730 Appendix 7 to ES - Plan 3 Soil Types - L 20 03 867 M.PDF4 Application document25 Feb 2020View
Haul Road swept path assessment - rigid vehicle (Dwg no J000122/ATR104)3 Approved plan11 Jan 2021View
Archaeological Evaluation Report (v2) (January 2021)2 Approved document14 Jan 2021View
Revised - Access swept path assessment - (Dwg no ATR101A)3 Approved plan28 Jan 2021View
Appendix 8.1 to ES - Dust Management Plan2 Approved document16 Oct 2020View
Revised Volume 2 - Environmental Statement (ES) -Chapter 11 - Archaeology Rev C March 20212 Approved document15 Mar 2021View
Revised Volume 2 - Environmental Statement (ES) - Chapter 7 Noise Rev A September 20202 Approved document16 Oct 2020View
0190 New - Addendum to Environmental Statement - Cumulative Impact with HS2 Phase 2a - L 20 03 867 M.PDF4 Application document3 Jun 2021View
Appendix 6 to Volume 1 - Geotechnical Assessment2 Approved document28 Apr 2020View
1360 Revised Volume 2 - Environmental Statement (ES) - Chapter 9 - Landscape Photosheets Rev A September 2020 - L 20 03 867 M.PDF4 Application document16 Oct 2020View
3880 Method of Working Overview and Pipelines (Dwg No 1911-R233 ALREWAS EXTRACTION VOIDS ONLY) - L 20 03 867 M.PDF5 Application plan5 Mar 2020View
0304 Manual turning count - Alrewas J2 - L 20 03 867 M.XLSM4 Application document18 Sept 2019View
0460 HS2 N1 and N2 supply strategy - L 20 03 867 M.PDF4 Application document1 Mar 2021View
Appendix 3.13 to ES - Bat Box Location Plan2 Approved document16 Oct 2020View
Letter dated 12-11-20 from Staffordshire Fire and Rescue Service6 Consultation20 Dec 2021View
40086_Site_Notice_-_further_information_(3)_-_L_20_03_867_M.PDF7 Publicity16 Mar 2022View
40090_Press_Notice_-_further_information_(3)_-_L_20_03_867_M.pdf7 Publicity16 Mar 2022View
40092_Neighbour_notification_letter_-_further_information_(3)_-_L_20_03_867_M.PDF7 Publicity16 Mar 2022View
40101_Press_Notice_-_further_information_(2)_-_L_20_03_867_M.PDF7 Publicity16 Mar 2022View
40102_Neighbour_notification_-_Further_information_(2)_-_L_20_03_867_M.PDF7 Publicity16 Mar 2022View
40110_Site_Notice_-_further_information_-_L_20_03_867_M.PDF7 Publicity16 Mar 2022View
40120_Press_Notice_-_further_information_-_L_20_03_867_M.PDF7 Publicity16 Mar 2022View
40125_Notification_letter_-_Further_information_-_L_20_03_867_M.PDF7 Publicity16 Mar 2022View
40130_Site_Notice_-_L_20_03_867_M.PDF7 Publicity16 Mar 2022View
40140_Press_Notice_-_L_20_03_867_M.PDF7 Publicity16 Mar 2022View
40100_Site_Notice_-_further_information_(2)_-_L_20_03_867_M.PDF7 Publicity16 Mar 2022View
Decision notice dated 16 March 20220 Decision - Letter / Notice / Report16 Mar 2022View
Section 106 Legal Agreement 11 March 2022 (Redacted)1 S106 / MoU16 Mar 2022View
Link_to_Planning_Committee_Report_dated_15_July_2021_-_L-20-03-867-M.pdfBackground document16 Mar 2022View
0112_Certificate_B_-_L_20_03_867_M_v1_Redacted.pdf4 Application document16 Jan 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Site notice date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Valid date

    Published milestoneCouncil source
  12. Committee date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  15. Dispatch date

    Published milestoneCouncil source
  16. Decision expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

GRANTED - WITH CONDITIONS
Decision notice dated 16 March 2022
Planning conditions
  1. Proposed sand and gravel extraction, the erection of plant and infrastructure and creation of new access, in order to supply the HS2 project with ready mix concrete, with export of surplus sand and gravel
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.