Council planning record

The construction of 4No finger pontoons with a linking pontoon and access ramp in the North Lake of Shepperton Marina to provide 8No accessible moorings with sheet pile wall and concrete bank seat including the extension of the existing tarmac hardstanding adjacent to the accessible moorings to provide 10No fully compliant accessible parking spaces.

Shepperton Marina Felix Lane Shepperton TW17 8NS

Decided (Approved)Reference: 24/01134/FULSpelthorne Borough Council

Last published check: 27 Sept 2026, 22:46. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  5. Standard Consultation Date

    Published milestoneCouncil source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision Issued Date

    Published milestoneCouncil source
  11. Decision Made Date

    Published milestoneCouncil source
  12. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  13. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided (Approved)
Application type
Full Application
Received
19 Sept 2024
Validated
19 Sept 2024
Determination deadline
14 Nov 2024
Local authority
Spelthorne Borough Council

Application overview

The construction of 4No finger pontoons with a linking pontoon and access ramp in the North Lake of Shepperton Marina to provide 8No accessible moorings with sheet pile wall and concrete bank seat including the extension of the existing tarmac hardstanding adjacent to the accessible moorings to provide 10No fully compliant accessible parking spaces.

Proposal details

Reference
24/01134/FUL
Alternative references
PP-12236988
Ward
Shepperton Town
Parish
Laleham And Shepperton ED
Agent
PWA Designs Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Shepperton Marina Felix Lane Shepperton TW17 8NS

This record has no verified map location.

View council map

Documents 33 of 33

DocumentPublishedAction
GCFULZ GRANT CONDITIONAL FULLDecision Notice · PDF14 Aug 2025View
DELEGATED REPORT UPDATED 24.6.20Officers Report · PDF14 Aug 2025View
SWTStatutory Consultee Response · PDF18 Jul 2025View
SWTStatutory Consultee Response · PDF24 Jun 2025View
EAStatutory Consultee Response · PDF10 Apr 2025View
SITE LAYOUT WITH RED LINE FOR ECOLOGICAL ENHANCEMENTSPlans - Site Layout · PDF13 Mar 2025View
Flood Risk AssessmentFlood Risk Assessment · PDF27 Jan 2025View
EAStatutory Consultee Response · PDF17 Dec 2024View
SWTStatutory Consultee Response · PDF6 Dec 2024View
BNG METRICBiodiversity Statement14 Nov 2024View
STANDARD CONSULTATION LETTERConsultation · PDF24 Oct 2024View
STANDARD CONSULTATION LETTERConsultation · PDF24 Oct 2024View
EXISTINGPlans - Site Layout · PDF24 Oct 2024View
STANDARD CONSULTATION LETTERConsultation · PDF18 Oct 2024View
STANDARD CONSULTATION LETTERConsultation · PDF18 Oct 2024View
RE-CONSULTATION LETTERConsultation · PDF18 Oct 2024View
ACKFUL ACK LETTER FOR FULLCorrespondence · PDF14 Oct 2024View
STANDARD CONSULTATION LETTERConsultation · PDF14 Oct 2024View
STANDARD CONSULTATION LETTERConsultation · PDF14 Oct 2024View
APPLICATIONFORMREDACTEDApplication Form · PDF19 Sept 2024View
FEECALCULATIONFee · PDF19 Sept 2024View
ATTACHMENTSUMMARYOther Documents · PDF19 Sept 2024View
LOCATION PLANPlans - Location Plan · PDF19 Sept 2024View
SITE LAYOUT WITH ECOLOGICAL ENHANCEMENTSPlans Combined - SUPERSEDED · PDF19 Sept 2024View
NORTH LAKE CAR PARK MOORING AREA (1:250)Plans - Site Layout · PDF19 Sept 2024View
STEEL FINGER SIDE ELEVATIONPlans - Other · PDF19 Sept 2024View
STEEL FINGER END PILE GUIDEPlans - Other · PDF19 Sept 2024View
NORTH LAKE MOORING CAR PARK 3DPlans - Other · PDF19 Sept 2024View
SITE LAYOUT WITH ECOLOGICAL ENHANCEMENTSPlans Combined - SUPERSEDED · PDF19 Sept 2024View
Design and Access StatementDesign and Access Statement · PDF19 Sept 2024View
FRAFlood Risk Assessment · PDF19 Sept 2024View
Environmental StatementEnvironmental Statement · PDF19 Sept 2024View
BNG METRICBiodiversity Statement · PDF19 Sept 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Grant Conditional
GCFULZ GRANT CONDITIONAL FULL
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.