Council planning record

Extraction of sand and gravel from King George VI reservoir and transportation by conveyor to Hithermoor Quarry for processing; retention and use of existing processing plant; continuation of wet and dry recycling of construction demolition and excavation waste including windfall aggregate, retention and use of the Hydraulically Bound Material plant and creation of temporary bunds together with retention and use of offices, welfare facilities, HGV parking with retention and use of the existing haul road and access from Leylands Lane; with restoration of Lower Mill Farm voids to nature conservation; and of Hithermoor Quarry to nature conservation, public access and agricultural use.

King George VI Reservoir Stanwell Moor Road Stanwell

UnknownReference: 21/01831/SCCSpelthorne Borough Council

Application location

King George VI Reservoir Stanwell Moor Road Stanwell

This record has no verified map location.

View council map

Application summary

Status
Unknown
Application type
Surrey County Council Application
Received
12 Nov 2021
Validated
12 Nov 2021
Determination deadline
7 Jan 2022
Local authority
Spelthorne Borough Council

Application overview

Extraction of sand and gravel from King George VI reservoir and transportation by conveyor to Hithermoor Quarry for processing; retention and use of existing processing plant; continuation of wet and dry recycling of construction demolition and excavation waste including windfall aggregate, retention and use of the Hydraulically Bound Material plant and creation of temporary bunds together with retention and use of offices, welfare facilities, HGV parking with retention and use of the existing haul road and access from Leylands Lane; with restoration of Lower Mill Farm voids to nature conservation; and of Hithermoor Quarry to nature conservation, public access and agricultural use.

Proposal details

Reference
21/01831/SCC
Ward
Stanwell North

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 59 of 59

DocumentPublishedAction
21/04/26 BIOSCAN TECHNICAL NOTE TITLED RESPONSE TO NATURAL ENGLANDTechnical Note · PDF21 Apr 2026View
11/04/26 SLR CONSULTING LETTER TITLED RESPONSE TO COUNTY GEOLOGISTConsultation · PDF21 Apr 2026View
(+5 ATTACHMENTS, TWO OF WHICH HAVE ALREADY BEEN SUBMITTED)Correspondence · PDF1 Oct 2025View
BIOSCAN STAINES MOOR SITE OF SCIENTIFIC INTEREST (SSSI)Correspondence · PDF1 Oct 2025View
BIOSCAN INFORMATION FOR HABITATS REGULATIONS ASSESSMENT (HRA)Report · PDF1 Oct 2025View
SUMMARY TABLE OF PLANNING OBJECTIONS & AGENT RESPONSESConsultation1 Oct 2025View
DATED 7 APRIL 2025 RE SOILS STORAGE REDACTEDCorrespondence · PDF1 Oct 2025View
SCC Third Party lettersSCC Third Party letters · PDF7 Mar 2025View
20/02/25 2. SLR KING GEORGE VI RESERVOIR REGULATION 25 RESPONSEPlanning Statement · PDF5 Mar 2025View
11/11/24 3. APPENDIX A PRELIMINARY LAND QUALITY RISK ASSESSMENT (PLQRA) REV FINAPlanning Statement · PDF5 Mar 2025View
11/11/24 5. APPENDIX B2 EMT TEST REPORT 24/10540 BATCH 1Planning Statement · PDF5 Mar 2025View
11/11/24 6. APPENDIX B3 EMT TEST REPORT 24/10540 BATCH 1Planning Statement · PDF5 Mar 2025View
11/11/24 7. APPENDIX C - LAB RESULTS REDACTEDPlanning Statement · PDF5 Mar 2025View
11/11/24 BRETT GROUP LETTER DATED 8 NOVEMBER 2024 TO SCCPlanning Statement · PDF5 Mar 2025View
05/12/24 BIOSCAN FURTHER ECOLOGICAL INFORMATION TECHNICAL NOTE ? BIODIVERSITY NEPlanning Statement · PDF5 Mar 2025View
11/11/24 1. SLR KING GEORGE VI RESERVOIR REGULATION 25 2ND RESPONSEPlanning Statement · PDF5 Mar 2025View
CL-18-002-024 NEW BAILEY BRIDGE OVER RIVER COLNE DATED 8 NOVEMBER 2019Plans - Other · PDF5 Mar 2025View
SCC LETTERS OF REPOther Documents · PDF8 Nov 2023View
SCC LETTER OF REPOther Documents · PDF13 Oct 2023View
SCC LETTER OF REPOther Documents · PDF13 Oct 2023View
SCC Third Party lettersSCC Third Party letters · PDF22 Sept 2023View
05/04/23 RESPONSE TO COMMENTS RELATING TO STABILITY AND RESERVOIR SAFETY ? REDACPlanning Statement · PDF4 Sept 2023View
05/04/23 COVER LETTER FROM SLR DATED 28 MARCH 2023 - REDACTED (PART 1 OF 2)Correspondence · PDF4 Sept 2023View
05/04/23 COVER LETTER FROM SLR DATED 28 MARCH 2023 - REDACTED (PART 2 OF 2)Correspondence · PDF4 Sept 2023View
05/04/23 COVER LETTER TO SCC FROM BRETT AGGREGATES LIMITED ? REDACTEDCorrespondence · PDF4 Sept 2023View
05/04/23 LETTER FROM BIOSCAN DATED 7 NOVEMBER 2022 ? REDACTEDCorrespondence · PDF4 Sept 2023View
05/04/23 TREE SURVEY ? REDACTEDTree Survey · PDF4 Sept 2023View
12/07/23 LETTER FROM APPLICANT AMENDING INFORMATION ? REDACTEDCorrespondence · PDF4 Sept 2023View
12/07/23 DUST MANAGEMENT PLAN VERSION 3 ? REDACTEDPlanning Statement · PDF4 Sept 2023View
12/07/23 AIR QUALITY ASSESSMENT VERSION 4 ? REDACTEDPlanning Statement · PDF4 Sept 2023View
05/04/2023 (REV: B) INDICATIVE CONVEYOR CROSS-SECTIONS AND OVERBRIDGE DATED 06 OPlans - Other · PDF4 Sept 2023View
03/04/2023 (REV: A) TREE PROTECTION FENCING DATED 21 FEBRUARY 2023Plans - Other · PDF4 Sept 2023View
21/08/2023 (REV: B) PROPOSED CONVEYOR ROUTE DATED 13Plans - Other · PDF4 Sept 2023View
Plans - OtherPlans - Other · PDF4 Sept 2023View
BRETT COVERING LETTER REDACTED 5.4.2023Other Documents · PDF29 Aug 2023View
NOSCCZ SCC NO OBJECTION DECN NOTICEDecision Notice · PDF2 Mar 2022View
DELEGATED REPORTOfficers Report · PDF2 Mar 2022View
ACKMIS ACK LETTER FOR MISC CONSULTCorrespondence · PDF30 Nov 2021View
STANDARD CONSULTATION LETTERConsultation · PDF30 Nov 2021View
STANDARD CONSULTATION LETTERConsultation · PDF30 Nov 2021View
SOIL PLACEMENTOther Documents · PDF25 Nov 2021View
SOIL STRIPPING AND OVERBURDEN REMOVALOther Documents · PDF25 Nov 2021View
ECOLOGICAL IMPACT ASSESSMENTEnvironmental Statement · PDF25 Nov 2021View
DISTRICT MEMOConsultation25 Nov 2021View
ENVIRONMENTAL NOISE IMPACT ASSESSMENTEnvironmental Statement · PDF25 Nov 2021View
PROJECT DESIGNDesign and Access Statement · PDF25 Nov 2021View
DESCRIPTION OF DEVELOPMENTConsultation · PDF25 Nov 2021View
Application FormApplication Form · PDF25 Nov 2021View
SIGNED CERTIFICATEApplication Form · PDF25 Nov 2021View
Environmental StatementEnvironmental Statement · PDF25 Nov 2021View
TRANSPORT STATEMENTEnvironmental Statement · PDF25 Nov 2021View
Archaeological AssessmentArchaeological Assessment · PDF25 Nov 2021View
Heritage StatementHeritage Statement · PDF25 Nov 2021View
PROJECT DESIGNOther Documents · PDF25 Nov 2021View
PROJECT DESIGNOther Documents · PDF25 Nov 2021View
AIR QUALITY ASSESSMENTOther Documents · PDF25 Nov 2021View
DUST MANAGEMENT PLANOther Documents · PDF25 Nov 2021View
TREE SURVEYOther Documents · PDF25 Nov 2021View
LANDSCAPE AND VISUAL IMPAT ASSESSMENTOther Documents · PDF25 Nov 2021View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Decision Made Date

    Published milestoneCouncil source

Decision & conditions

No Objections
NOSCCZ SCC NO OBJECTION DECN NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.