Council planning record

Prior approval notification for a single storey rear extension measuring 5.958 metres in depth beyond the rear wall of the original dwelling house measuring a maximum height of 3.451 metres and a height to the eaves of 3 metres (following demolition of an existing single storey rear extension).

204 Feltham Road Ashford TW15 1AS

Decided (Prior Approval not required)Reference: 19/00793/PDHSpelthorne Borough Council

Last published check: 9 Oct 2026, 21:39. Check the council record for more recent changes.

Application location

204 Feltham Road Ashford TW15 1AS

This record has no verified map location.

View council map

Application summary

Status
Decided (Prior Approval not required)
Application type
PD Householder Prior Approval
Received
4 Jun 2019
Validated
4 Jun 2019
Determination deadline
16 Jul 2019
Local authority
Spelthorne Borough Council

Application overview

Prior approval notification for a single storey rear extension measuring 5.958 metres in depth beyond the rear wall of the original dwelling house measuring a maximum height of 3.451 metres and a height to the eaves of 3 metres (following demolition of an existing single storey rear extension).

Proposal details

Reference
19/00793/PDH
Ward
Ashford East
Agent
Fluent ADS Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
Officers ReportOfficers Report18 Jul 2019View
Decision NoticeDecision Notice15 Jul 2019View
Plans - ElevationsPlans - Elevations · PDF4 Jun 2019View
Plans - ElevationsPlans - Elevations · PDF4 Jun 2019View
Plans - Floor PlansPlans - Floor Plans · PDF4 Jun 2019View
Plans - Floor PlansPlans - Floor Plans · PDF4 Jun 2019View
Plans - Location PlanPlans - Location Plan · PDF4 Jun 2019View
Plans - Location PlanPlans - Location Plan · PDF4 Jun 2019View
CIL - FormCIL - Form · PDF4 Jun 2019View
Application FormApplication Form · PDF4 Jun 2019View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
  9. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Prior Approval Not Required
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.