Outline application for residential development of up to 400 dwellings (access applied for)

Land Off Croston Road and Moss Lane Flensburg Way Farington Moss Lancashire

UnknownReference: 07/2021/00007/DISSouth Ribble Borough Council

Last published check: 11 Oct 2026, 03:06. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Unknown
Application type
Discharge of conditions
Received
7 Jan 2021
Validated
7 Jan 2021
Determination deadline
4 Mar 2021
Local authority
South Ribble Borough Council

Application overview

Outline application for residential development of up to 400 dwellings (access applied for)

Proposal details

Reference
07/2021/00007/DIS
Alternative references
PP-09354425
Ward
Farington West
Parish
Farington Parish Council
Agent
Turley

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land Off Croston Road and Moss Lane Flensburg Way Farington Moss Lancashire

This record has no verified map location.

View council map

Documents 159 of 159

DocumentPublishedAction
PLAN APP - DISCHARGE OF CONDITIONS LETTERPlanning Application (inc initial correspondence)12 Mar 2021View
CONSULTEE RESPONSE - LANCASHIRE COUNTY DRAINAGEConsultee Response · PDF10 Mar 2021View
CONSULTEE RESPONSE - UU DRAINAGEConsultee Response · PDF25 Feb 2021View
PLAN APP - RISK ASSESSMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - LIGHTINGPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - ECOLOGY STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - WATER VOLE SURVEY REPORTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUSTAINABILITY REPORTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - LIGHTINGPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED SITE LAYOUTSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED SITE LAYOUTSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED SITE LAYOUTSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED SITE LAYOUTSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED SITE LAYOUTSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - PROPOSED PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - FOOTPATH DETAILSPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - FOOTPATH DETAILSPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUSTAINABILITY REPORTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - EXISTING SITE PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION DRAWINGSPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION DRAWINGSPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - PROPOSED PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SIGNING AND ROAD MARKINGSPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - MATERIALSPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - ACCESS DETAILSPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - HABITAT SURVEY REPORTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - ECOLOGY ASSESSMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - ECOLOGY ASSESSMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - ECOLOGY ASSESSMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - BAT ACTIVITY SURVEY REPORTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - BAT ACTIVITY SURVEY REPORTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - WATER VOLE SURVEY REPORTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - LANDSCAPING PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - MASTERPLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - HABITAT SURVEY REPORTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - PROPOSED AND EXISTING PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED AND EXISTING PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED AND EXISTING PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED AND EXISTING PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED AND EXISTING PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - PROPOSED AND EXISTING PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - DRAINAGEPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - TRANSPORT STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - ACCESS DETAILSPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - LIGHTINGPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - LIGHTINGPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - LOCATION PLANSite Location Plan · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUSTAINABILITY REPORTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - SECTIONAL PLANSSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSite Elevations, Building Plans etc. · PDF8 Jan 2021View
PLAN APP - FOOTPATH DETAILSPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - FOOTPATH DETAILSPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - RISK ASSESSMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - MATERIALSPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SIGNING AND ROAD MARKINGSPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View
PLAN APP - SUPPORTING STATEMENTPlanning Application (inc initial correspondence) · PDF8 Jan 2021View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Part Discharged

Appeal status: Unknown

Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.