ApprovedCouncil status: Decision Made

Redecoration of shop front. Redecoration of walls and ceiling (between beams). Retention of existing lighting systems. Installation of new cash desk/till point. Installation of small domestic style kitchen, plus plumbing. Construction of one half height plasterboard wall between lower and upper sections. Retention of existing floor coverings. Installation of additional electric sockets. Replacement of existing AC cassettes, to replicate current internal and external locations and fixings, and use of existing pipe work. Decoration to rear non listed part of retail area. Retention of existing fire alarm system. Retention of existing staff room and toilets in rear/new part of building.

4-5 Upper High Street, Thame, OX9 3ES

South Oxfordshire District CouncilReference P26/S0100/LB

Last published check: 7 Nov 2026, 01:43. Check the council record for more recent changes.

Status and dates

Last published check: 7 Nov 2026, 01:43 (UK)

  1. DoneReceived21 Jan 2026
  2. Not publishedValidatedNo date on council record
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedListed Building Consent is GrantedNot published

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (2)
  1. Application Received Date

    Published milestoneCouncil source
  2. Issue Date

    Published milestoneCouncil source
Documents
33 published

Proposal

Redecoration of shop front. Redecoration of walls and ceiling (between beams). Retention of existing lighting systems. Installation of new cash desk/till point. Installation of small domestic style kitchen, plus plumbing. Construction of one half height plasterboard wall between lower and upper sections. Retention of existing floor coverings. Installation of additional electric sockets. Replacement of existing AC cassettes, to replicate current internal and external locations and fixings, and use of existing pipe work. Decoration to rear non listed part of retail area. Retention of existing fire alarm system. Retention of existing staff room and toilets in rear/new part of building.

Reference
P26/S0100/LB
Agent
Ms Carly Soff

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application FormApplication FormNot publishedView
  • Proposed Power & Data Plan drwgno Thame 2025 Rev5 10General PlanNot publishedView
  • Location Plan drwgno LOC-001General PlanNot publishedView
  • Lighting Proposed Plan drwgno Thame 2025 Rev5 9General PlanNot publishedView
  • Floor Plan Proposed Front Ground drwgno Thame 2025 Rev4 4General PlanNot publishedView
  • Elevation Proposed drwgno Thame 2025 Rev5 DWG Rev 5General PlanNot publishedView
  • HVAC Plan Proposed drwgno Thame 2025 Rev5 8General PlanNot publishedView
  • Floor Plan Existing Rear Ground drwgno Thame 2025 Rev4 3General PlanNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Listed Building Consent is Granted
Delegated Report Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.