Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Strings Cottage, Green Lane, Woodcote, RG8 0RT
Last published check: 8 Oct 2026, 17:04. Check the council record for more recent changes.
Strings Cottage, Green Lane, Woodcote, RG8 0RT
This record has no verified map location.
T1 Oak - Fell and treat stump with eco-plugs T2 Ash - Fell and treat stump with eco-plugs TPO Ref: TPO 40/2004 Woodcote Area (G1) 1. The above tree works are proposed as a remedy to the differential foundation movement at the insured property and to ensure the long-term stability of the building. 2. The above tree works are proposed to limit the extent and need for expensive and disruptive engineering repair works at the insured property. In this instance the estimated repair costs are likely to vary between ÿ£20,000 and ÿ£150,000, depending upon whether the tree/s can be removed or must remain. 3. The above tree works are proposed to limit the extent and need for costly CO2e emissions relating to alternative engineering repair works at the insured property. A typical underpinning scheme can include a carbon cost of more than 6000 kg CO2e and soil stabilisation or root barriers more than 4000 kg CO2e. A typical tree might capture between 15-40kg CO2e per annum and would therefore take centuries to mitigate the cost in CO2e on any alternative. We also confirm that the applicant has included this scheme and application in its tree planting and carbon capture off-set scheme for trees causing subsidence to low rise buildings which has already seen some 11,000 trees planted and additionally 220 tonnes of carbon captured. 4. The above tree works are proposed to limit the duration of any claim period and therefore allow the landowner their right to the peaceful enjoyment of their property. 5. It is the case that an alternative to felling such as pruning or significant "pollarding" of the tree would not provide a reliable or sustainable remedy to the subsidence in this case. We do not consider that any other potential means of mitigation, including root barriers, would be effective or appropriate in the circumstances. 6. We are satisfied that the evidence obtained following completion of our Arboricultural Implication Assessment report completed 24/05/2023 clearly links the Oak T1 and Ash T2 as the cause of damage to the risk address. 7. Insurers understanding the requirement to offer replacement planting in the event consent to fell is granted. 8. Should you wish to visit the address or to discuss any technical matters your technical liaison in this instance is Henry Collings who can be contacted on .....We stress we would be happy to meet or to have any discussion if this allows the Council to fully understand our application and the issues surrounding this. Your technical liaison can also handle any technical information or clarification regarding technical matters.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| 01082024 141815 Consent for TPO tree worksTPO - Tree Works | Not published | View |
| 01082024 144805 Consent for TPO tree worksTPO - Tree Works | Not published | View |
| 01082024 151737 Consent for TPO tree worksTPO - Tree Works | Not published | View |
| P24S2335TPOTPO - Tree Works | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.