ApprovedCouncil status: Decision Made

The proposal is for approximately 650m of river bank protection (170m South Oxfordshire & 480m Wycombe District Council, on the River Thames, Henley. River bank protection is required to reduce any further riverbank erosion; it is estimated that up to 1 m of bank is eroded in a year. The river bank protection will consist of green bio-engineering solutions, to strengthen the bank and improve biodiversity of the area. The work will consist of the following three options: 1. Vegetated coir rolls installed over submerged rock rolls and backfilled. 2. Pre-seeded geotextile bags and suitable growing medium, installed over submerged gabions. Hazel faggots / timber will be fixed securely to the gabions, on the riverside. 3. Layer of gravel installed underwater on river bank, up to 50 mm thick and not further than 2 m from local bank edge, to protect naturally formed, 'beaches'. The bank protection will protect existing trees on the riverbank by running around the riverside of these trees. The works will not include any topping, lopping, or felling of any trees (amended plans, bank management information and additional ecological appraisal received 15th May 2019)

river bank and rural grass land along the River Thames on, Fawley Meadows, Henley on Thames

South Oxfordshire District CouncilReference P19/S0143/FUL

Last published check: 28 Oct 2026, 05:32. Check the council record for more recent changes.

Status and dates

Last published check: 28 Oct 2026, 05:32 (UK)

  1. DoneReceived16 Jan 2019
  2. Not publishedValidatedNo date on council record
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedPlanning Permission is GrantedNot published

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (2)
  1. Application Received Date

    Published milestoneCouncil source
  2. Issue Date

    Published milestoneCouncil source
Documents
35 published

Proposal

The proposal is for approximately 650m of river bank protection (170m South Oxfordshire & 480m Wycombe District Council, on the River Thames, Henley. River bank protection is required to reduce any further riverbank erosion; it is estimated that up to 1 m of bank is eroded in a year. The river bank protection will consist of green bio-engineering solutions, to strengthen the bank and improve biodiversity of the area. The work will consist of the following three options: 1. Vegetated coir rolls installed over submerged rock rolls and backfilled. 2. Pre-seeded geotextile bags and suitable growing medium, installed over submerged gabions. Hazel faggots / timber will be fixed securely to the gabions, on the riverside. 3. Layer of gravel installed underwater on river bank, up to 50 mm thick and not further than 2 m from local bank edge, to protect naturally formed, 'beaches'. The bank protection will protect existing trees on the riverbank by running around the riverside of these trees. The works will not include any topping, lopping, or felling of any trees (amended plans, bank management information and additional ecological appraisal received 15th May 2019)

Reference
P19/S0143/FUL
Agent
Mr Johnston

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application FormApplication FormNot publishedView
  • Application FormApplication FormNot publishedView
  • DKM7998 D101 01 SHT2Other Plans/InformationNot publishedView
  • DKM7998 D100 02 SHT1Other Plans/InformationNot publishedView
  • DKM7998 D101 01 SHT1Other Plans/InformationNot publishedView
  • Ecological Appraisal Rev COther Plans/InformationNot publishedView
  • DKM7998 D100 02 SHT4Other Plans/InformationNot publishedView
  • Conceptual Bank ProtectionOther Plans/InformationNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Planning Permission is Granted
Delegated Report Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.