Protection of the existing river bank using 47 metres of steel sheet piling and 23 metres of soft bank protection using hazel faggots plus the construction of a new slipway suitable for launching small boats (as amended by drwgnos 001A and 006A to alter the size and position of the slipway and amplified by an Arboricultural Impact Assessment and Method Statement received on 31/03/2017).
Protection of the existing river bank using 47 metres of steel sheet piling and 23 metres of soft bank protection using hazel faggots plus the construction of a new slipway suitable for launching small boats (as amended by drwgnos 001A and 006A to alter the size and position of the slipway and amplified by an Arboricultural Impact Assessment and Method Statement received on 31/03/2017).
Reference
P17/S0111/FUL
Agent
Thames Riverworks Piling Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.