The installation consists of 2 11kW Gaia Wind Turbines. Each turbine is mounted on a free standing 18m galvanised steel lattice mast on a 25sq.m concrete base. Each turbine has two blades and are manufactured as a single composite Unit, 13m in diameter.
The installation consists of 2 11kW Gaia Wind Turbines. Each turbine is mounted on a free standing 18m galvanised steel lattice mast on a 25sq.m concrete base. Each turbine has two blades and are manufactured as a single composite Unit, 13m in diameter.
Reference
2011/0779
Ward
Harleston
Parish
Redenhall With Harleston
Agent
Bowler Energy
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.