Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Bodinglee Wind Farm
Last published check: 30 Sept 2026, 01:05. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceErection and operation of wind farm consisting of up to 37 turbines, 16 with a maximum height to blade tip of 230m and 21 with a max height to tip of 250m (Consultation from Scottish Ministers under S36 of the Electricity Act 1989)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Published advertAdvert · PDF | 5 Aug 2026 | View |
| Additional information - cover letterCorrespondence · PDF | 5 Aug 2026 | View |
| Additional information - grid route appraisalCorrespondence · PDF | 5 Aug 2026 | View |
| Consultation response - carmichael community councilConsultation Response · PDF | 31 Oct 2025 | View |
| Consultation response - rigside and douglas water tenants and residentsConsultation Response · PDF | 31 Oct 2025 | View |
| Objection - mrs wendy alexanderPublic Comment · PDF | 18 Sept 2025 | View |
| Objection - stuart cassellsPublic Comment · PDF | 17 Sept 2025 | View |
| Committee reportReport | 9 Sept 2025 | View |
| Site location planDrawing · PDF | 27 May 2025 | View |
| Glasgow airport letter withdrawing objectionCorrespondence · PDF | 30 May 2024 | View |
| Representation - shpf sites officerPublic Comment · PDF | 12 Dec 2023 | View |
| Representation - alexander mcgrathPublic Comment · PDF | 4 Dec 2023 | View |
| Consultation response - roads developmentConsultation Response · PDF | 13 Oct 2023 | View |
| Road safety auditSupporting Information · PDF | 28 Sept 2023 | View |
| Countryside and greenspace consultation responseConsultation Response | 21 Aug 2023 | View |
| Volume 4 - ta9.1 - transport assessmentSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta8.4 - assessment of indirect effects between 5-15kmSupporting Information · PDF | 1 Aug 2023 | View |
| Application - cover letter - june 2023 - bodinglee wind farm_redactedSupporting Information · PDF | 1 Aug 2023 | View |
| List of abbreviations and glossarySupporting Information · PDF | 1 Aug 2023 | View |
| Pac - appendix 1 - submission of scoping reportSupporting Information · PDF | 1 Aug 2023 | View |
| Pac - appendix 2 - pac table and q&aSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 3.1 - newspaper advert round 1Supporting Information · PDF | 1 Aug 2023 | View |
| Appendix 3.2 - newspaper advert round 2Supporting Information · PDF | 1 Aug 2023 | View |
| Appendix 3.3 - news release round 1 consultationSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 3.4 - news release round 2 consultationSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 4.1 - round 1 flyerSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 4.2 - distribution map and round 1 flyerSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 4.3 - round 1 masterplanSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 4.4 - consultation boardsSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 4.5 - exhibition feedback sheetSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 5.1 - round 2 leafletSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 5.2 - additional distribution area (lesmahagow)Supporting Information · PDF | 1 Aug 2023 | View |
| Appendix 5.3 - base distribution mapSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 5.4 - exhibition feedback sheetSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 5.5 - masterplan round 2Supporting Information · PDF | 1 Aug 2023 | View |
| Appendix 5.6 - consultation boardsSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 6.10 - douglas cc sep updateSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 6.16 - bee pro update juneSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 6.3 - bee pro invitation july (community)Supporting Information · PDF | 1 Aug 2023 | View |
| Appendix 6.4 - bee pro invitation july (councillors)Supporting Information · PDF | 1 Aug 2023 | View |
| Appendix 6.5 - bee pro reminder augustSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 6.6 - bee pro invitation februarySupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 6.7 - round 1 community surveySupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 6.8 - round 2 community surveySupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 6.9 - duneaton cc feb 22 updateSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 7.1 - pre-events survey clicked responseSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 7.2 - community survey round 1 (ranked responses)Supporting Information · PDF | 1 Aug 2023 | View |
| Appendix 7.3 - step into stem survey - exampleSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 7.4 - community survey round 2 quantitative dataSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 8.1 - affordable energy transition slidesSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 8.2 - heritage, community and place slidesSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 9.1 - d&a estates masterplanSupporting Information · PDF | 1 Aug 2023 | View |
| Appendix 9.2 - douglas masterplanSupporting Information · PDF | 1 Aug 2023 | View |
| Pre-application consultation reportSupporting Information · PDF | 1 Aug 2023 | View |
| Ps - appendix a - bodinglee decarbonisation studySupporting Information · PDF | 1 Aug 2023 | View |
| Ps - appendix b - bodinglee landscape concept masterplanSupporting Information · PDF | 1 Aug 2023 | View |
| Ps - appendix c - douglas valley masterplanSupporting Information · PDF | 1 Aug 2023 | View |
| Ps - appendix d - national performance framework assessment tableSupporting Information · PDF | 1 Aug 2023 | View |
| Ps - appendix e - connect2renewables charterSupporting Information · PDF | 1 Aug 2023 | View |
| Socio-economic reportSupporting Information · PDF | 1 Aug 2023 | View |
| Sustainable design and planning benefits part 1Supporting Information · PDF | 1 Aug 2023 | View |
| Sustainable design and planning benefits part 2Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 1 - eiar - non technical summarySupporting Information · PDF | 1 Aug 2023 | View |
| Volume 2 - eiar - chapter 1 - introductionSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 2 - eiar - chapter 10 - hydrology, hydrogeology and geology (including peSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 2 - eiar - chapter 11 - schedule of mitigationSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 2 - eiar - chapter 2 - development descriptionSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 2 - eiar - chapter 3 - design evolution and alternativesSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 2 - eiar - chapter 4 - landscape and visual impactSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 2 - eiar - chapter 5 - ornithologySupporting Information · PDF | 1 Aug 2023 | View |
| Volume 2 - eiar - chapter 6 - ecologySupporting Information · PDF | 1 Aug 2023 | View |
| Volume 2 - eiar - chapter 7 - noiseSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 2 - eiar - chapter 8 - cultural heritage and archaeologySupporting Information · PDF | 1 Aug 2023 | View |
| Volume 2 - eiar - chapter 9 - access traffic and transportationSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3a - figure1.1 - site location planDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure10.1 - bedrock geology - sheets 1 to 2Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure10.10 - groundwater dependent terrestrial ecosystemsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure10.2 - superficial soils - sheets 1 to 2Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure10.3 - national soils of scotland map - sheets 1 to 2Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure10.4 - extract from carbon and peatland map 2016 - sheets 1 toDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure10.5 - interpolated peat depths - sheets 1 to 2Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure10.6 - hydrology study areaDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure10.7 - hydrological catchmentsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure10.8 - hydrological featuresDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure10.9 - watercourse crossingsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.10 - indicative battery storage layoutDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.11 - indicative battery storage elevationsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.12 - indicative wind monitoring mastDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.13 - typical watercourse crossingDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.14 - indicative watercourse spanned bridge crossingDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.15 - indicative borrow pitDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.16 - indicative batching plantDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.17 - indicative grid corridorDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.1a - proposed development layoutDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.1b - detailed proposed development layoutDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.2a - indicative turbine elevation 230m tip heightDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.2b - indicative turbine elevation 250m tip heightDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.3 - typical turbine foundationDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.4 - typical crane hardstanding arrangementDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.5 - typical access track cross sectionDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.6 - indicative construction compoundDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.7 - indicative control building & substation layout (plan viDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.8 - indicative control building & substation elevationsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure2.9 - indicative cable trench cross-sectionsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure3.1a - turbine layout 1Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure3.1b - turbine layout 2Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure3.1c - turbine layout 3Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure3.1d - turbine layout (final layout)Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure3.2a - infrastructure layout 1Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure3.2b - infrastructure layout 2Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.1 - landscape and visual impact assessment study areaDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.10 - cztv - operational, consented and proposed wind farmsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.11 - cztv - operational, consented and proposed wind farmsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.12 - cztv - operational, consented and proposed wind farmsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.13 - cztv - bodinglee and andershaw-middle muir groupDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.14 - cztv - bodinglee and little galaDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.15 - cztv - bodinglee and hagshaw hill groupDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.16 - cztv - bodinglee and kennoxhead groupDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.17 - cztv - bodinglee and clyde groupDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.2a - blade tip height (230m-250m) ztv and viewpoint locatiDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.2b - blade tip height (230m-250m) ztv and viewpoint locatiDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.3a - hub height (145m-165m) ztv and viewpoint locationsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.3b - hub height (167.5m) ztv and viewpoint locationsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.4 - landscape character typesDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.5a - landscape character types with blade tip height (230mDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.5b - landscape character types with blade tip height (230mDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.6 - designated landscapes & wild land areasDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.7a - designated landscapes & wild land areas with blade tiDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.7b - designated landscapes & wild land areas with blade tiDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.8a - other wind farm developments (60km)Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.8b - other wind farm developments (60km)Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.9a - other wind farm developments (45km)Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure4.1.9b - other wind farm developments (45km)Drawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure6.1 - outline habitat management planDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure7.1 - noise assessment locationsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure8.1 - site location and study areaDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure8.2a - core study area west with infrastructureDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure8.2b - core study area east with infrastructureDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure8.3 - designated heritage assets within 5km study areaDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure8.4a - designated heritage assets between 5 - 15kmDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure8.4b - designated heritage assets between 5-15km north westDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure8.4c - designated heritage assets between 5 - 15km north eastDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure8.4d - designated heritage assets between 5 - 15km south eastDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure8.4e - designated heritage assets between 5 - 15km south westDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure8.5 - designated heritage assets cumulativeDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure9.1 - study areaDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure9.2 - traffic count locationsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure9.3 - accident locationsDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figure9.4 - abnormal invisible load and construction vehicle deliverDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figuresDrawing · PDF | 1 Aug 2023 | View |
| Volume 3a - figuresSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - cultural heritage visualisations indexSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.1 - vp01 core path near m74Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.10 - vp10 dungavel hillSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.11 - vp11 roberton, eastern edgeSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.12 - vp12 m74 minor road bridge near nether fauldhouseSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.13 - vp13 crawfordjohn, picnic siteSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.14 - vp14 wiston, west of primary schoolSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.15 - vp15 tinto hillSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.16 - vp16 coalburnSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.17 - vp17 eastertown roadSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.18 - vp18 a70 millmoorSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.19 - vp19 b740 near nether whitecleuchSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.2 - vp02 minor road, andershaw farmSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.20 - vp20 a702 near overburnsSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.21 - vp21 cairn tableSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.22 - vp22 culter fellSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.23 - vp23 lowther hillSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.3 - vp03 b7055, access road to little gallaSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.4 - vp04 b7078, red moss hotelSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.5 - vp05 glespin, hillview crescentSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.6 - vp06 rigsideSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.7 - vp07 uddingtonSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.8 - vp08 douglas playparkSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure4.2.9 - vp09 douglas station road cairn housesSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure8.10 - vp05 st brides church (ca268)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure8.11 - vp06 netherton cairn (sm4513)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure8.12 - vp07 devonshaw hill cairn (sm4235)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure8.13 - vp08 lanark whs (whb3)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure8.14 - vp09 castle hill strip fort (sm2635)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure8.15 - vp10 tinto cairn (sm4660)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure8.6 - vp01 auchensaugh hill cairn (sm4234)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure8.7 - vp02 thorril castle (sm5425)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure8.8 - vp03 thirstone stone circle (sm5094)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - figure8.9 - vp04 wildhaw hill cairn (sm4511)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 3b - lvia visualisations indexSupporting Information · PDF | 1 Aug 2023 | View |
| 4880-rep-011 fig10.2.2 superficial soilsDrawing · PDF | 1 Aug 2023 | View |
| Volume 4 - ta10.1 - geotechnical desk study (part 1 of 3)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta10.1 - geotechnical desk study (part 2 of 3)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta10.1 - geotechnical desk study (part 3 of 3)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta10.2 - watercourse crossing strategySupporting Information · PDF | 1 Aug 2023 | View |
| 4880-rep-001 fig10.1.1 site layout planDrawing · PDF | 1 Aug 2023 | View |
| 4880-rep-002 fig10.1.2 superficial soilsDrawing · PDF | 1 Aug 2023 | View |
| 4880-rep-003 fig10.1.3 bedrock geologyDrawing · PDF | 1 Aug 2023 | View |
| 4880-rep-004 fig10.1.4 geomorphology mapDrawing · PDF | 1 Aug 2023 | View |
| 4880-rep-005 fig10.1.5 recorded peat depthsDrawing · PDF | 1 Aug 2023 | View |
| 4880-rep-006 fig10.1.6 interpolated peat depthsDrawing · PDF | 1 Aug 2023 | View |
| 4880-rep-007 fig10.1.7 slope mapDrawing · PDF | 1 Aug 2023 | View |
| 4880-rep-008 fig10.1.8 factor of safety planDrawing · PDF | 1 Aug 2023 | View |
| 4880-rep-009 fig10.1.9 hazard rank zonation planDrawing · PDF | 1 Aug 2023 | View |
| Volume 4 - ta10.3 - peat slide risk assessment (psra)Supporting Information · PDF | 1 Aug 2023 | View |
| 4880-rep-010 fig10.2.1 site layout planDrawing · PDF | 1 Aug 2023 | View |
| 4880-rep-012 fig10.2.3 bedrock geologyDrawing · PDF | 1 Aug 2023 | View |
| 4880-rep-013 fig10.2.4 recorded peat depthsDrawing · PDF | 1 Aug 2023 | View |
| 4880-rep-014 fig10.2.5 interpolated peat depthsDrawing · PDF | 1 Aug 2023 | View |
| Volume 4 - ta10.4 - outline peat management plan (opmp)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta10.5 - groundwater dependant terrestrial ecosystem assessmentSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta10.6 - private water supply risk assessmentSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta2.1 - outline environmental management plan (oemp)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta2.1.1 - draft construction method statementSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta2.2 - aviation impact assessmentSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta2.3 - aviation lighting strategySupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta2.4 - telecommunications mitigation strategySupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta2.5 - shadow flicker reportSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta2.6 - forestry reportSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta2.7 - carbon balance calculationsSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta2.8 - eskdalemuir sil reportSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta4.1 - lvia and visualisation methodologySupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta4.2 - residential visual amenity assessmentSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta4.2.1 - residential properties with blade tip height ztvDrawing · PDF | 1 Aug 2023 | View |
| Volume 4 - ta4.2.2 - residential properties with aviation lighting intensity ztvDrawing · PDF | 1 Aug 2023 | View |
| Volume 4 - ta4.2.3 - residential properties with nacelle lighting ztvDrawing · PDF | 1 Aug 2023 | View |
| Volume 4 - ta4.2.4 - rvaa wirelinesSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta4.3 - aviation lighting assessmentSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta4.3.1 - aviation ligthing ztv nacelle lightingDrawing · PDF | 1 Aug 2023 | View |
| Volume 4 - ta4.3.2 - aviation lighting ztv lighting intensity 45kmDrawing · PDF | 1 Aug 2023 | View |
| Volume 4 - ta4.3.3 - aviation lighting ztv lighting intensity 10kmDrawing · PDF | 1 Aug 2023 | View |
| Volume 4 - ta5.1 - 2020-21 baseline ornithology reportSupporting Information · PDF | 1 Aug 2023 | View |
| Fig01 site boundaryDrawing · PDF | 1 Aug 2023 | View |
| Fig02 statutory sites of ornithological importanceDrawing · PDF | 1 Aug 2023 | View |
| Fig03a bodinglee east vp locations and viewshedsDrawing · PDF | 1 Aug 2023 | View |
| Fig03b bodinglee west vp locations and viewshedsDrawing · PDF | 1 Aug 2023 | View |
| Fig04 ornithology survey areasDrawing · PDF | 1 Aug 2023 | View |
| Fig05 target species flights; greylag gooseDrawing · PDF | 1 Aug 2023 | View |
| Fig06a target species flights; pink-footed goose (bodinglee east)Drawing · PDF | 1 Aug 2023 | View |
| Fig06b target species flights; pink-footed goose (bodinglee west)Drawing · PDF | 1 Aug 2023 | View |
| Fig07 target species flights; other wildfowl speciesDrawing · PDF | 1 Aug 2023 | View |
| Fig08 target species flights; golden ploverDrawing · PDF | 1 Aug 2023 | View |
| Fig09a target species flights; curlew (bodinglee east)Drawing · PDF | 1 Aug 2023 | View |
| Fig09b target species flights; curlew (bodinglee west)Drawing · PDF | 1 Aug 2023 | View |
| Fig10 target species flights; other wader species and black grouseDrawing · PDF | 1 Aug 2023 | View |
| Fig11 target species flights; osprey and red kiteDrawing · PDF | 1 Aug 2023 | View |
| Fig12 incidental flights pink-footed gooseDrawing · PDF | 1 Aug 2023 | View |
| Fig13 breeding territories secondary raptor speciesDrawing · PDF | 1 Aug 2023 | View |
| Fig14 breeding wader territoriesDrawing · PDF | 1 Aug 2023 | View |
| Volume 4 - ta5.3 - 2021-22 baseline ornithology reportSupporting Information · PDF | 1 Aug 2023 | View |
| Fig01 site boundary (1)Drawing · PDF | 1 Aug 2023 | View |
| Fig05 target species flights - goose, duck and grouse speciesDrawing · PDF | 1 Aug 2023 | View |
| Fig06 target species flights - curlewDrawing · PDF | 1 Aug 2023 | View |
| Fig07 target species flights - other wader speciesDrawing · PDF | 1 Aug 2023 | View |
| Fig08 target species flights - raptor speciesDrawing · PDF | 1 Aug 2023 | View |
| Fig09 incidental pink-footed goose flightsDrawing · PDF | 1 Aug 2023 | View |
| Fig08 target species flights - raptor species (1)Drawing · PDF | 1 Aug 2023 | View |
| Fig10 breeding territories - secondary raptor and owl speciesDrawing · PDF | 1 Aug 2023 | View |
| Fig11 breeding territories - wader speciesDrawing · PDF | 1 Aug 2023 | View |
| Volume 4 - ta5.5 - collision risk modelling reportSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta6.1 - non-avian ecology (excluding bats) (part 1 of 3)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta6.1 - non-avian ecology (excluding bats) (part 2 of 3)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta6.1 - non-avian ecology (excluding bats) (part 3 of 3)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta6.2 - bat technical report (part 1 of 2)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta6.2 - bat technical report (part 2 of 2)Supporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta6.4 - habitat management planSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta7.1 - environmental noise assessmentSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta8.1 - archaeological desk-based assessmentSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta8.2 - assessment of indirect effects within 5kmSupporting Information · PDF | 1 Aug 2023 | View |
| Volume 4 - ta8.3 - sieving exercise for designated assets between 5-15kmSupporting Information · PDF | 1 Aug 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.