ApprovedCouncil status: Approved

Details of Conditions 3 (contamination of land or pollution of controlled waters), 4 (external materials of construction), 5 (external boxes for gas and electricity supplies and of any gas flues and soil vent pipes), 8 (landscape management and maintenance schedule), 9 (means of storage and disposal of refuse and recycling), 10 (construction management to minimise disturbance during the construction process), 11 (prevent the deposit of mud on public highways), 15 (surface water drainage scheme), 16 (design and location of all lighting) & 17 (existing and proposed site levels and proposed floor levels) of H16-0283-17

Land off Willow Walk Spalding Lincs

South Holland District CouncilReference H16-0197-19

Last published check: 30 Oct 2026, 15:42. Check the council record for more recent changes.

Status and dates

Last published check: 30 Oct 2026, 15:42 (UK)

  1. DoneReceived22 Feb 2019
  2. DoneValidated22 Feb 2019
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date26 Apr 2019
  5. DecidedApproved26 Apr 2019

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Received

    Published milestoneCouncil source
  2. Validated

    Published milestoneCouncil source
  3. Decided

    Published milestoneCouncil source
  4. Decision By

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Parish
Spalding
Documents
23 published

Proposal

Details of Conditions 3 (contamination of land or pollution of controlled waters), 4 (external materials of construction), 5 (external boxes for gas and electricity supplies and of any gas flues and soil vent pipes), 8 (landscape management and maintenance schedule), 9 (means of storage and disposal of refuse and recycling), 10 (construction management to minimise disturbance during the construction process), 11 (prevent the deposit of mud on public highways), 15 (surface water drainage scheme), 16 (design and location of all lighting) & 17 (existing and proposed site levels and proposed floor levels) of H16-0283-17

Reference
H16-0197-19
Parish
Spalding
Agent
James Garner Architecture Ltd 5 Bush Road Kibworth Harcourt Leicestershire LE8 0SP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application Form Without Personal DetailsApplication Form Without Personal Details25 Feb 2019View
  • Drw No 1001 P04 (layout)Proposed Plans25 Feb 2019View
  • Block PlanBlock Plan25 Feb 2019View
  • Drw No 07-0123-005 P2 External LevelsGeneral Plans25 Feb 2019View
  • Drw No 07-0123-006 P2 External WorksGeneral Plans25 Feb 2019View
  • DRw No 07-0123-007 P2 Domestic Drainage LayoutGeneral Plans25 Feb 2019View
  • Drw No 1830 LTG 5000 Street Lighting LayoutGeneral Plans25 Feb 2019View
  • Traffic Route Map (large scale)General Plans25 Feb 2019View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.