T1 - Lime - shorten branches over the road to path edge (by no more than 3m) (Reason: too close to utility cables)T9 - Lime - shorten branches close to utility cables by 5m (over road) (Reason: too close to utility cables) Situated on right hand side of driveway entrance, 400mm from front boundary wallT10 - Lime (right hand front garden) - shorten branches towards utility cables by 3m (Reason: too close to utility cables)T13 - Lime - reduce weight on low branches over road by shortening by 3-4m (Reason: heavy branches over public road)T23 - Lime - Fell to ground level (Reason: Dying top, stunted tree. Touching top of right hand boundary wall)Please note, other trees marked on plan in red are not included in this application.
2 Apthorpe Street Fulbourn Cambridgeshire CB21 5EY
T1 - Lime - shorten branches over the road to path edge (by no more than 3m) (Reason: too close to utility cables)T9 - Lime - shorten branches close to utility cables by 5m (over road) (Reason: too close to utility cables) Situated on right hand side of driveway entrance, 400mm from front boundary wallT10 - Lime (right hand front garden) - shorten branches towards utility cables by 3m (Reason: too close to utility cables)T13 - Lime - reduce weight on low branches over road by shortening by 3-4m (Reason: heavy branches over public road)T23 - Lime - Fell to ground level (Reason: Dying top, stunted tree. Touching top of right hand boundary wall)Please note, other trees marked on plan in red are not included in this application.
Reference
26/1289/TTPO
Ward
Fen Ditton & Fulbourn
Parish
Fulbourn CP
Agent
Eastern Landscape Service Limited
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.