ApprovedCouncil status: Decided

Rainwater system improvement to Hangars 3, 4 and 5 to include 1. Extend the drainage pipeworks from the roof central valley gutters to through the gable overhang at both ends and connecting to the downpipes outside of the hangars. Install access panels at the undersides of the gable overhang for future maintenance of the drainage pipes, 2. Remove existing valley gutter linings and re-line with rubber lining and 3. Install horizontal lifeline around the roof lights to provide man safe system for maintenance personnel.

Hangars 3, 4 And 5 Imperial War Museum Royston Road Duxford Cambridgeshire CB22 4QR

South Cambridgeshire District CouncilReference 25/03685/LBCListed Building Consent

Last published check: 8 Nov 2026, 11:15. Check the council record for more recent changes.

Status and dates

Last published check: 8 Nov 2026, 11:15 (UK)

  1. DoneReceived22 Sept 2025
  2. DoneValidated23 Sept 2025
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date18 Nov 2025
  5. DecidedGranted Permission18 Nov 2025

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (7)
  1. Application Received

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Listed Building Consent
Ward
Duxford
Parish
Duxford CP
Documents
19 published

Proposal

Rainwater system improvement to Hangars 3, 4 and 5 to include 1. Extend the drainage pipeworks from the roof central valley gutters to through the gable overhang at both ends and connecting to the downpipes outside of the hangars. Install access panels at the undersides of the gable overhang for future maintenance of the drainage pipes, 2. Remove existing valley gutter linings and re-line with rubber lining and 3. Install horizontal lifeline around the roof lights to provide man safe system for maintenance personnel.

Reference
25/03685/LBC
Ward
Duxford
Parish
Duxford CP
Agent
Andrew Ip

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • HISTORIC ENGLANDConsultee Comments1 Dec 2025View
  • DELEGATED REPORTApplication Committee / Delegated Report19 Nov 2025View
  • DECISION NOTICEApplication Decision Notice18 Nov 2025View
  • CONSERVATIONConsultee Comments29 Oct 2025View
  • AMENDED RESPONSE TO CONSERVATION COMMENTSApplication Information28 Oct 2025View
  • HISTORIC ENGLAND COMMENTSConsultee Comments16 Oct 2025View
  • CONSERVATIONConsultee Comments9 Oct 2025View
  • ACKNOWLEDGEMENT LETTERApplication Officer Correspondence25 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted Permission
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.