The proposal is for works to the existing Chard Reservoir and the overarching driver for the scheme is to ensure the safety of the reservoir and thereby protect the downstream communities from the severe consequences that would result from a breach of the reservoir (for further information, refer to the Reservoirs Act 1975). The works under the scheme comprise: - Raising a localised low spot in the sidewall of the auxiliary overflow chute. - Reinforcing a portion of the embankment downstream face and toe. - Raising the embankment crest by constructing a low-height wall along the upstream edge of the road (Chaffcombe Lane) over the entire length of the dam. - Raise the northern (downstream) sidewall of the stilling basin by up to 1m over a length of approximately 16m. - Fill in / block off (i.e., prevent flows through) the two left-most (looking downstream) auxiliary overflow culverts. These culverts are to be converted to bat roosts.

Chard Reservoir Chaffcombe Lane Chard

Application ApprovedReference: SCC/4091/2024Somerset Council

Last published check: 14 Sept 2026, 19:28. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Valid

    Published milestoneCouncil source
  2. Decision Date

    Published milestoneCouncil source

Application summary

Status
Application Approved
Application type
Not published
Received
Not published
Validated
15 Feb 2024
Determination deadline
Not published
Local authority
Somerset Council

Application overview

The proposal is for works to the existing Chard Reservoir and the overarching driver for the scheme is to ensure the safety of the reservoir and thereby protect the downstream communities from the severe consequences that would result from a breach of the reservoir (for further information, refer to the Reservoirs Act 1975). The works under the scheme comprise: - Raising a localised low spot in the sidewall of the auxiliary overflow chute. - Reinforcing a portion of the embankment downstream face and toe. - Raising the embankment crest by constructing a low-height wall along the upstream edge of the road (Chaffcombe Lane) over the entire length of the dam. - Raise the northern (downstream) sidewall of the stilling basin by up to 1m over a length of approximately 16m. - Fill in / block off (i.e., prevent flows through) the two left-most (looking downstream) auxiliary overflow culverts. These culverts are to be converted to bat roosts.

Proposal details

Reference
SCC/4091/2024
Agent
Mr Hermann Stehle

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Chard Reservoir Chaffcombe Lane Chard

This record has no verified map location.

Documents 8 of 8

DocumentPublishedAction
DECISION NOTICE_SCC-4091-2024 unsigned.pdfDECISION NOTICES7 Mar 2024View
ApplicationFormRedacted.pdfPLANNING APPLICATION FORMS15 Feb 2024View
P5834-003-B.pdfPLANS & DRAWINGS15 Feb 2024View
P5834-004-B.pdfPLANS & DRAWINGS15 Feb 2024View
P5834-005-B.pdfPLANS & DRAWINGS15 Feb 2024View
Site Plan Existing & Proposed.pdfPLANS & DRAWINGS15 Feb 2024View
OFFICER REPORT_SCC-4091-2024 unsigned.pdfReport7 Mar 2024View
240207 Chard Reservoir Scheme Summary-IssueC- redacted.pdfSUPPORTING REPORTS & DOCUMENTS15 Feb 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Application Approved
DECISION NOTICE_SCC-4091-2024 unsigned.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.