The installation of twin ground mounted solar photovoltaic renewable energy generators or solar parks of 3.345MWp and 5.542MWp installed capacity respectively (8.887MWp total installed capacity) across three fields formerly used as an inert household waste landfill. The solar parks will consist of numerous rows of solar panels supported on galvanised steel frameworks facing south tilted at thirty degrees with associated inverters, electrical cabling, switchgear substations, battery storage containers, CCTV masts, weather stations, and perimeter security fencing and gates. The site is assumed to be a brownfield site. A 40 year temporary planning consent is sought.
Land either side of Chilton Trinity Water Resource Centre (Wessex Water) at Saltlands Avenue, Bridgwater TA6 3JS
The installation of twin ground mounted solar photovoltaic renewable energy generators or solar parks of 3.345MWp and 5.542MWp installed capacity respectively (8.887MWp total installed capacity) across three fields formerly used as an inert household waste landfill. The solar parks will consist of numerous rows of solar panels supported on galvanised steel frameworks facing south tilted at thirty degrees with associated inverters, electrical cabling, switchgear substations, battery storage containers, CCTV masts, weather stations, and perimeter security fencing and gates. The site is assumed to be a brownfield site. A 40 year temporary planning consent is sought.
Reference
SCC/3909/2022
Agent
Mr Richard Harris
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.