National Grid Hinkley Point C - connection Project Discharge of Requirement 22 - Highway works for Stage 7.1 of the authorised development – Bellmouth DCO ref AC03, AC04 and AC05 The Project comprises the following elements: - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near Avonmouth, comprising: Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.

HInkley Point C - Connection Project Hinkley Point Road Stogursey Bridgwater Somerset TA5 1YA

Out to Consultation/ Decision PendingReference: SCC/3770/2020Somerset Council

Application location

HInkley Point C - Connection Project Hinkley Point Road Stogursey Bridgwater Somerset TA5 1YA

This record has no verified map location.

Application summary

Status
Out to Consultation/ Decision Pending
Application type
Not published
Received
Not published
Validated
2 Dec 2020
Determination deadline
Not published
Local authority
Somerset Council

Application overview

National Grid Hinkley Point C - connection Project Discharge of Requirement 22 - Highway works for Stage 7.1 of the authorised development – Bellmouth DCO ref AC03, AC04 and AC05 The Project comprises the following elements: - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near Avonmouth, comprising: Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.

Proposal details

Reference
SCC/3770/2020
Agent
Charlotte Brown

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 6 of 6

DocumentPublishedAction
3770_Cover letter - Redacted_Redacted.pdfSUPPORTING REPORTS & DOCUMENTS30 Nov 2020View
3770_APPENDIX A PROPOSED PLANS - AC5 amendment.pdfSUPPORTING REPORTS & DOCUMENTS26 Nov 2020View
3770_APPENDIX B STAGE 2 ROAD SAFETY AUDIT.pdfSUPPORTING REPORTS & DOCUMENTS26 Nov 2020View
3770_APPENDIX C SCC CORRESPONDENCE TECHNICAL APPROVAL.pdfSUPPORTING REPORTS & DOCUMENTS26 Nov 2020View
3770_APPENDIX D SCC CORRESPONDENCE TECHNICAL APPROVAL - AC5 Amendment.pdfSUPPORTING REPORTS & DOCUMENTS26 Nov 2020View
3770_HighwayWorks_HCP - 7.1 22 G - REQ 22.pdfSUPPORTING REPORTS & DOCUMENTS26 Nov 2020View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Valid

    Published milestoneCouncil source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.