Council planning record

There shall be no operation of the development hereby permitted until a detailed Construction Environment Management Plan (CEMP) has been submitted to and approved in writing by the Waste Planning Authority. The CEMP shall include the following: o Risk assessment of potentially damaging construction activities. o Measures relating to the control of dust during construction and operation. o Identification of “biodiversity protection zones”. o Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements). o The location and timing of sensitive works to avoid harm to biodiversity features. o The times during construction when specialist ecologists need to be present on site to oversee works, as appropriate. o Responsible persons and lines of communication. o The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person, as appropriate o Use of protective fences, exclusion barriers and warning signs. o The management plan will also specify the measures which will be put into place to ensure that all remaining solids resulting from operation of the pyrolytic process would be managed and disposed of at appropriate licensed facilities and would be handled in such a way to ensure that there was no risk of contamination of local receptors (in particular the River Axe). Thereafter the development shall be carried out in strict accordance with the approved details and any subsequent amendments shall be agreed in writing with the Waste Planning Authority.

The paper mill site The Old Railway Yard Haybridge Lane Wells Haybridge BA5 1AG

Application ApprovedReference: SCC/3619/2019/Cond3Somerset Council

Last published check: 20 Sept 2026, 20:09. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Valid

    Published milestoneCouncil source
  2. Decision Date

    Published milestoneCouncil source

Application summary

Status
Application Approved
Application type
Not published
Received
Not published
Validated
4 Feb 2020
Determination deadline
Not published
Local authority
Somerset Council

Application overview

There shall be no operation of the development hereby permitted until a detailed Construction Environment Management Plan (CEMP) has been submitted to and approved in writing by the Waste Planning Authority. The CEMP shall include the following: o Risk assessment of potentially damaging construction activities. o Measures relating to the control of dust during construction and operation. o Identification of “biodiversity protection zones”. o Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements). o The location and timing of sensitive works to avoid harm to biodiversity features. o The times during construction when specialist ecologists need to be present on site to oversee works, as appropriate. o Responsible persons and lines of communication. o The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person, as appropriate o Use of protective fences, exclusion barriers and warning signs. o The management plan will also specify the measures which will be put into place to ensure that all remaining solids resulting from operation of the pyrolytic process would be managed and disposed of at appropriate licensed facilities and would be handled in such a way to ensure that there was no risk of contamination of local receptors (in particular the River Axe). Thereafter the development shall be carried out in strict accordance with the approved details and any subsequent amendments shall be agreed in writing with the Waste Planning Authority.

Proposal details

Reference
SCC/3619/2019/Cond3
Agent
Mr Paul Wormald

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

The paper mill site The Old Railway Yard Haybridge Lane Wells Haybridge BA5 1AG

This record has no verified map location.

Documents 4 of 4

DocumentPublishedAction
DECISION NOTICE_SCC-3619-2019-COND3 (REDACTED).pdfDecision Notice20 Feb 2020View
G3300Form027_england_en (REDACTED).pdfForm5 Feb 2020View
OFFICER REPORT_SCC-3619-2019-COND3 (REDACTED).pdfReport20 Feb 2020View
Construction Environment Management Plan.pdfSUPPORTING REPORTS & DOCUMENTS6 Feb 2020View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Application Approved
DECISION NOTICE_SCC-3619-2019-COND3 (REDACTED).pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.