Proposed Development The main elements of the proposed development include the following: • lNo 8.0 x 5.Sm diameter (dia) ASP Feed Pump Station (PS) with duty/standby Variable Speed Drives (VSD) submersible 'Dry Weather Flow (DWF)' pumps and duty/assist/standby VSD submersible 'storm' pumps; • 90m x dual buried rising mains between ASP Feed PS and new anoxic selector. 350mm dia. DWF main and 600mm dia. storm main. Each rising main fitted with an electromagnetic flowmeter at the ASP; • 2No above ground 3.Sm deep anoxic selector lanes (total volume 604m3); • lNo high level flow-split chamber with 6No weir penstocks to split flows 67/33 between new and existing ASPs; • lNo 400mm dia x 80m long gravity pipe from ASP flow-split to the modified flow distribution chamber to the existing ASP lanes. • 2No below ground activated sludge aeration lanes (total volume 3,642m3) to treat 67%of the settled effluent using fine bubble diffuser aeration, approximate dimensions 14m (W) x 56m (L); • lNo 6.0m diameter Recirculating Aquaculture System (RAS) Surplus Activated Sludge (SAS) PS with duty/assist/standby VSD submersible RAS pumps and duty/standby SAS pumps. The RAS rising main shall be fitted with an electromagnetic flowmeter at the ASP. The SAS rising main flowmeter is fitted above-ground at the PS. • lNo 60m x 450mm dia RAS rising main from RAS PS to new ASP anoxic zone • lNo 1 lOm x 180mm Outward Diameter (OD) SAS rising main from SAS PS to existing SAS rising main at ASP distribution chamber • lNo 3.0m diameter confluence chamber on existing Final Settlement Tank (FST) feed pipeline; uried pipelines and ducts serving the prop?sed plant; • Concrete roads, footpaths and site finishes to access the proposed plant; • Upgrades to site power supply and distribution systems including uprating of authorised supply capacity and replacement of transformer; • New main site primary distribution switchboard in GRP kiosk, acting as centralised hub to rationalised retained and new distribution circuits; • New ASP MCC in elevated GRP kiosk, serving the feed pumps, blowers, mixers, new FST, new and existing RAS & SAS pumping stations abandoned; The scheme is programmed for a period of 18-20 months beginning in March 2019, subject to planning permission.

D9857: West Huntspill Sewage Treatment Works (STW) Bathing Water Improvements: Environmental Impact Assessment Screening Opinion.

Screening/Scoping Opinion Decision IssuedReference: SCC/3535/2018/SCRSomerset Council

Application location

D9857: West Huntspill Sewage Treatment Works (STW) Bathing Water Improvements: Environmental Impact Assessment Screening Opinion.

This record has no verified map location.

Application summary

Status
Screening/Scoping Opinion Decision Issued
Application type
Not published
Received
Not published
Validated
6 Feb 2019
Determination deadline
Not published
Local authority
Somerset Council

Application overview

Proposed Development The main elements of the proposed development include the following: • lNo 8.0 x 5.Sm diameter (dia) ASP Feed Pump Station (PS) with duty/standby Variable Speed Drives (VSD) submersible 'Dry Weather Flow (DWF)' pumps and duty/assist/standby VSD submersible 'storm' pumps; • 90m x dual buried rising mains between ASP Feed PS and new anoxic selector. 350mm dia. DWF main and 600mm dia. storm main. Each rising main fitted with an electromagnetic flowmeter at the ASP; • 2No above ground 3.Sm deep anoxic selector lanes (total volume 604m3); • lNo high level flow-split chamber with 6No weir penstocks to split flows 67/33 between new and existing ASPs; • lNo 400mm dia x 80m long gravity pipe from ASP flow-split to the modified flow distribution chamber to the existing ASP lanes. • 2No below ground activated sludge aeration lanes (total volume 3,642m3) to treat 67%of the settled effluent using fine bubble diffuser aeration, approximate dimensions 14m (W) x 56m (L); • lNo 6.0m diameter Recirculating Aquaculture System (RAS) Surplus Activated Sludge (SAS) PS with duty/assist/standby VSD submersible RAS pumps and duty/standby SAS pumps. The RAS rising main shall be fitted with an electromagnetic flowmeter at the ASP. The SAS rising main flowmeter is fitted above-ground at the PS. • lNo 60m x 450mm dia RAS rising main from RAS PS to new ASP anoxic zone • lNo 1 lOm x 180mm Outward Diameter (OD) SAS rising main from SAS PS to existing SAS rising main at ASP distribution chamber • lNo 3.0m diameter confluence chamber on existing Final Settlement Tank (FST) feed pipeline; uried pipelines and ducts serving the prop?sed plant; • Concrete roads, footpaths and site finishes to access the proposed plant; • Upgrades to site power supply and distribution systems including uprating of authorised supply capacity and replacement of transformer; • New main site primary distribution switchboard in GRP kiosk, acting as centralised hub to rationalised retained and new distribution circuits; • New ASP MCC in elevated GRP kiosk, serving the feed pumps, blowers, mixers, new FST, new and existing RAS & SAS pumping stations abandoned; The scheme is programmed for a period of 18-20 months beginning in March 2019, subject to planning permission.

Proposal details

Reference
SCC/3535/2018/SCR
Agent
Jared Maxfield c/o Wessex Water

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 5 of 5

DocumentPublishedAction
D9857 West Huntspill STW EIA Screening Opinion Request_redacted.pdfLetter/Memorandum29 Nov 2018View
EIA SCREENING OPINION LETTER_SCC-3535-2018-SCR.docLetter/Memorandum5 Dec 2018View
D9857-1000.pdfPlan29 Nov 2018View
D9857-ENV-100-REV C.PDFPlan29 Nov 2018View
EIA SCREENING MATRIX_SCC-3535-2018-SCR.docReport5 Dec 2018View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Decision Date

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source

Decision & conditions

Screening/Scoping Opinion Decision Issued
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.