Council planning record

Application for the Discharge of Condition 15 of Planning Application Permission ref: 18/00415/CPO (Hapspen Quarry Extension) Details / Summary: Ecology and Biodiversity A specific Construction Environmental Management Plan (CEMP) shall be submitted to and approved by the Minerals Planning Authority before work commences on site. The CEMP will include, but not exclusively; • Risk assessment of potentially damaging construction activities; • No artificial lighting associated with the development will illuminate the boundary hedgerows demonstrated through a lighting design scheme; • Piles of stone and soil materials will be stored in a way to avoid habitation by reptiles and amphibians, such as being covered or located away from commuting habitats comprised of scrub, grassland, hedgerows or stone walls; • Control of dust deposition; • Details of the planting mix for restoration to ensure land to returned to, at a minimum, arable or pasture with the surrounding hedgerows with trees and grassland buffer zone retained; The approved CEMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the Minerals Planning Authority. Reason: To ensure the success of mitigation measures are sustained for the duration of the development and that there is no net biodiversity loss in the long term as per Government and local minerals planning policy.

Grove Farm Quarry, Lime Kiln Lane, Castle Cary, Somerset, BA7 7NX

Application ApprovedReference: 18/00415/CPO/Cond15Somerset Council

Last published check: 20 Sept 2026, 21:41. Check the council record for more recent changes.

Application location

Grove Farm Quarry, Lime Kiln Lane, Castle Cary, Somerset, BA7 7NX

This record has no verified map location.

Application summary

Status
Application Approved
Application type
Not published
Received
Not published
Validated
29 Jul 2019
Determination deadline
Not published
Local authority
Somerset Council

Application overview

Application for the Discharge of Condition 15 of Planning Application Permission ref: 18/00415/CPO (Hapspen Quarry Extension) Details / Summary: Ecology and Biodiversity A specific Construction Environmental Management Plan (CEMP) shall be submitted to and approved by the Minerals Planning Authority before work commences on site. The CEMP will include, but not exclusively; • Risk assessment of potentially damaging construction activities; • No artificial lighting associated with the development will illuminate the boundary hedgerows demonstrated through a lighting design scheme; • Piles of stone and soil materials will be stored in a way to avoid habitation by reptiles and amphibians, such as being covered or located away from commuting habitats comprised of scrub, grassland, hedgerows or stone walls; • Control of dust deposition; • Details of the planting mix for restoration to ensure land to returned to, at a minimum, arable or pasture with the surrounding hedgerows with trees and grassland buffer zone retained; The approved CEMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the Minerals Planning Authority. Reason: To ensure the success of mitigation measures are sustained for the duration of the development and that there is no net biodiversity loss in the long term as per Government and local minerals planning policy.

Proposal details

Reference
18/00415/CPO/Cond15
Agent
Land and Mineral Management Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 5 of 5

DocumentPublishedAction
DECISION NOTICE_18-00415-CPO-COND15(2).docDECISION NOTICES16 Oct 2019View
Hadspen Discharge Forms Non Personal.pdfPLANNING APPLICATION FORMS8 Jul 2019View
343C-3 - Proposed Access Details.pdfPLANS & DRAWINGS8 Jul 2019View
OFFICER REPORT_18-00415-CPO-COND15.docReport3 Oct 2019View
Hadsepn Quarry Extension - CEMP v1.0.pdfSUPPORTING REPORTS & DOCUMENTS8 Jul 2019View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Valid

    Published milestoneCouncil source
  2. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Decision Date

    Published milestoneCouncil source

Decision & conditions

Application Approved
DECISION NOTICE_18-00415-CPO-COND15(2).doc
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.