Council planning record

Details so satisfy Condition 4: Prior to Importation of Waste: Protection of Vegetation at Passing Bays. Prior to the commencement of construction of the passing bay required by Condition 3, practical measures (both physical measures and sensitive working practices) shall be submitted to and approved in writing to the Waste Planning Authority to avoid or reduce impacts during construction of the passing bay as proposed in the approved CEMP. These measures may be provided as a set of method statements and should address impacts to biodiversity on site, including habitats (trees, hedgerows and field edges, including Root Protection Zone buffer zones and barriers) and protected species (bats, birds, badgers, dormice, reptiles (including two stage vegetation clearance) and amphibians), followed by appropriate mitigation, as required. These measures shall also include the method of reinstatement of the verges following removal of the passing bay. The approved protective measures shall be implemented prior to commencement of, and during, construction of the passing bay. Reason: A pre-commencement condition in the interest of the strict protection of European protected species and in accordance with policy South Somerset District Council Local Plan - Policy EQ4 Biodiversity. …of permission 17/02084/CPO Importation of Inert Subsoil to raise the area of holes 8, 9 & 10

Cricket St. Thomas Golf Club Windwhistle Cricket St. Thomas Chard TA20 4DG

Application ApprovedReference: 17/02084/CPO/Cond 4Somerset Council

Last published check: 14 Sept 2026, 22:05. Check the council record for more recent changes.

Application location

Cricket St. Thomas Golf Club Windwhistle Cricket St. Thomas Chard TA20 4DG

This record has no verified map location.

Application summary

Status
Application Approved
Application type
Not published
Received
Not published
Validated
12 Oct 2021
Determination deadline
Not published
Local authority
Somerset Council

Application overview

Details so satisfy Condition 4: Prior to Importation of Waste: Protection of Vegetation at Passing Bays. Prior to the commencement of construction of the passing bay required by Condition 3, practical measures (both physical measures and sensitive working practices) shall be submitted to and approved in writing to the Waste Planning Authority to avoid or reduce impacts during construction of the passing bay as proposed in the approved CEMP. These measures may be provided as a set of method statements and should address impacts to biodiversity on site, including habitats (trees, hedgerows and field edges, including Root Protection Zone buffer zones and barriers) and protected species (bats, birds, badgers, dormice, reptiles (including two stage vegetation clearance) and amphibians), followed by appropriate mitigation, as required. These measures shall also include the method of reinstatement of the verges following removal of the passing bay. The approved protective measures shall be implemented prior to commencement of, and during, construction of the passing bay. Reason: A pre-commencement condition in the interest of the strict protection of European protected species and in accordance with policy South Somerset District Council Local Plan - Policy EQ4 Biodiversity. …of permission 17/02084/CPO Importation of Inert Subsoil to raise the area of holes 8, 9 & 10

Proposal details

Reference
17/02084/CPO/Cond 4
Agent
Ms Lucy Binnie

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 12 of 12

DocumentPublishedAction
17-02084-CPO-Cond 4 Highways - redacted.pdfCONSULTATION & CORRESPONDENCE (STATUTORY CONSULTEES)19 Oct 2021View
1702084CPOCond 4 Ecology - redacted .pdfCONSULTATION & CORRESPONDENCE (STATUTORY CONSULTEES)23 Nov 2021View
DECISION NOTICE_17-02084-CPO-COND 4.pdfDECISION NOTICES26 Nov 2021View
REDACTED Cricket St Thomas Conds 3 4 10 12 13 15 and 16 Covering Letter 12 Oct 2021.pdfPLANNING APPLICATION FORMS12 Oct 2021View
ApplicationFormRedacted.pdfPLANNING APPLICATION FORMS12 Oct 2021View
538-100 Temporary Passing Bay.pdfPLANS & DRAWINGS12 Oct 2021View
538-200 Temporary Passing Bay Construction Details.pdfPLANS & DRAWINGS12 Oct 2021View
OFFICER DOC REPORT_17-02084-CPO .pdfReport26 Nov 2021View
Condition 6 Tipping Notification & Conditions 3 & 4 Passing Bay Information Redacted.pdfResponse9 Jan 2023View
REDACTED eg15733.002 CST LEMPandBMEPv3 Oct 2021.pdfSUPPORTING REPORTS & DOCUMENTS12 Oct 2021View
REDACTED eg15733 002 Cricket St Thomas Golf Course Dormouse Statement Nov 2020.pdfSUPPORTING REPORTS & DOCUMENTS12 Oct 2021View
CEMP redacted.pdfSUPPORTING REPORTS & DOCUMENTS25 Nov 2021View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Valid

    Published milestoneCouncil source
  2. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Decision Date

    Published milestoneCouncil source

Decision & conditions

Application Approved
DECISION NOTICE_17-02084-CPO-COND 4.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.