Discharge of Condition 9: Construction Method Statement Before the commencement of the development hereby permitted, a Construction Method Statement, describing works, including temporary works, to be undertaken, and a pollution prevention scheme to be implemented during the construction phase, shall be submitted to and approved in writing by the County Planning Authority. The Construction Method Statement shall provide for: (a) Site security; (b) Fuel oil storage, bunding, delivery and use; (c) How both minor and major spillages will be dealt with; (d) Containment of silt/soil contaminated run off; (e) Disposal of contaminated drainage, including water pumped from excavations; (f) Discharge of silty or discoloured water from excavations should be irrigated over grassland or a settlement lagoon be provided to remove solids; (g) Construction vehicles not crossing or working directly in a water course. Temporary bridges to be constructed for vehicles to cross and excavations done from the bank. Any work in or near a water course to be done in a dry area e.g. river water to be diverted away from the working area using coffer dams; (h) Site induction for workforce highlighting pollution prevention and awareness; (i) The submission, approval and implementation of details to ensure a permanent, appropriate level of EA access to controlled waters in the vicinity of the development and maintenance regime of the scheme; (j) A scheme for the provision and operation of vehicle cleaning measures at the site exit onto the public highway; (k) Details of the construction period and the sequence of development; The development shall be carried out in accordance with the approved Construction Method Statement. Reason: To protect controlled waters, the biodiversity and residential amenities of the area. This is required pre-commencement to ensure the development is constructed efficiently and yet with acceptable environmental impacts.

Land between Showground Road/Marsh Lane and, Parrett Way, Colley Lane Industrial Estate, Bridgwater, Somerset

Application ApprovedReference: 1/08/15/054/Cond9Somerset Council

Last published check: 21 Sept 2026, 00:01. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Valid

    Published milestoneCouncil source
  2. Decision Date

    Published milestoneCouncil source

Application summary

Status
Application Approved
Application type
Not published
Received
Not published
Validated
12 Mar 2019
Determination deadline
Not published
Local authority
Somerset Council

Application overview

Discharge of Condition 9: Construction Method Statement Before the commencement of the development hereby permitted, a Construction Method Statement, describing works, including temporary works, to be undertaken, and a pollution prevention scheme to be implemented during the construction phase, shall be submitted to and approved in writing by the County Planning Authority. The Construction Method Statement shall provide for: (a) Site security; (b) Fuel oil storage, bunding, delivery and use; (c) How both minor and major spillages will be dealt with; (d) Containment of silt/soil contaminated run off; (e) Disposal of contaminated drainage, including water pumped from excavations; (f) Discharge of silty or discoloured water from excavations should be irrigated over grassland or a settlement lagoon be provided to remove solids; (g) Construction vehicles not crossing or working directly in a water course. Temporary bridges to be constructed for vehicles to cross and excavations done from the bank. Any work in or near a water course to be done in a dry area e.g. river water to be diverted away from the working area using coffer dams; (h) Site induction for workforce highlighting pollution prevention and awareness; (i) The submission, approval and implementation of details to ensure a permanent, appropriate level of EA access to controlled waters in the vicinity of the development and maintenance regime of the scheme; (j) A scheme for the provision and operation of vehicle cleaning measures at the site exit onto the public highway; (k) Details of the construction period and the sequence of development; The development shall be carried out in accordance with the approved Construction Method Statement. Reason: To protect controlled waters, the biodiversity and residential amenities of the area. This is required pre-commencement to ensure the development is constructed efficiently and yet with acceptable environmental impacts.

Proposal details

Reference
1/08/15/054/Cond9
Agent
Somerset County Council

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land between Showground Road/Marsh Lane and, Parrett Way, Colley Lane Industrial Estate, Bridgwater, Somerset

This record has no verified map location.

Documents 6 of 6

DocumentPublishedAction
CLSAR CEMP.DOCXCondition Discharge Documents18 Feb 2019View
Cond 9.docmCondition Discharge Documents18 Feb 2019View
EPR-BB3959SZ_ APPROVED Bespoke Permit.pdfCondition Discharge Documents18 Feb 2019View
EPR-SB3858UM_Bespoke Permit Huntworth Brook.pdfCondition Discharge Documents18 Feb 2019View
ARTICLE 27 DISCHARGE OF CONDITION NOTICE_1-08-15-054-COND9.docNotice24 Apr 2019View
ARTICLE 27 OFFICER'S DELEGATED REPORT_1-08-15-054-COND9.docReport8 Apr 2019View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Application Approved
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.