Council planning record

Installation and operation of a 49.9 MW ground mounted solar farm and 5MW BESS facility together with all associated works, equipment, necessary infrastructure and biodiversity enhancement areas.

Woodhouse Farm Catherine De Barnes Lane Catherine De Barnes Solihull B92 0DJ

DecidedReference: PL/2025/01404/PPFLSolihull Metropolitan Borough Council

Last published check: 13 Oct 2026, 12:29. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Standard Consultation Date

    Published milestoneCouncil source
  9. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  10. Actual Committee Date

    Published milestoneCouncil source
  11. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  13. Decision Issued Date

    Published milestoneCouncil source
  14. Decision Made Date

    Published milestoneCouncil source
  15. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Major Full Other
Received
18 Jul 2025
Validated
29 Jul 2025
Determination deadline
28 Oct 2025
Local authority
Solihull Metropolitan Borough Council

Application overview

Installation and operation of a 49.9 MW ground mounted solar farm and 5MW BESS facility together with all associated works, equipment, necessary infrastructure and biodiversity enhancement areas.

Proposal details

Reference
PL/2025/01404/PPFL
Alternative references
PP-14164015
Ward
Meriden & Arden
Parish
Hampton In Arden Parish Council
Agent
ADAS Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Woodhouse Farm Catherine De Barnes Lane Catherine De Barnes Solihull B92 0DJ

This record has no verified map location.

View council map

Documents 266 of 266

DocumentPublishedAction
WCC ARCHAEOLOGY COMMNETS (UPDATE)Consultee Comment · PDF26 Aug 2026View
NOTIFICATION OF SUBMISSION OF APPEALCorrespondence · PDF7 Aug 2026View
DECISION NOTICE MAJOR FULL REFUSALDecision · PDF30 Jul 2026View
UPDATE NOTECommittee Report27 Jul 2026View
APPLICANT UPDATED ARBORICULTURAL RESPONSEReport · PDF23 Jul 2026View
LANDSCAPE COMMENTSConsultee Comment23 Jul 2026View
WCC ARCHAEOLOGYConsultee Comment · PDF21 Jul 2026View
LANDSCAPE COMMENTSConsultee Comment21 Jul 2026View
COMMITTEE REPORTCommittee Report · PDF17 Jul 2026View
LANDSCAPE TECHNICAL NOTEReport · PDF16 Jul 2026View
ARBORICULTURAL TECHNICAL NOTEReport16 Jul 2026View
ECOLOGY COMMENTSConsultee Comment16 Jul 2026View
SKYLARK MITIGATIONCorrespondence · PDF15 Jul 2026View
E-MAIL RE COMMUNITY TRUST FUNDCorrespondence · PDF13 Jul 2026View
ENVIRONMENT AGENCY COMMENTSConsultee Comment · PDF13 Jul 2026View
THERMAL IMPACT STUDYReport · PDF13 Jul 2026View
CASTLE HILLS SOLAR FARM LPA ORGANISATIONS LETTERCorrespondence · PDF10 Jul 2026View
LANDSCAPE COMMENTSConsultee Comment10 Jul 2026View
LANDSCAPE TECHNICAL NOTE IN RESPONSE TO COMMENTSReport · PDF8 Jul 2026View
E-MAIL FROM AGENT RE LANDSCAPE COMMENTSCorrespondence · PDF8 Jul 2026View
NATURAL ENGLANDConsultee Comment · PDF7 Jul 2026View
APPLICANTS ARBORICULTURAL RESPONSE TO COMMENTSReport · PDF6 Jul 2026View
SMBC - LANDSCAPE ARCHITECTConsultee Comment6 Jul 2026View
HERITAGE COMMENTSConsultee Comment · PDF3 Jul 2026View
BIRMINGHAM AIRPORT AERODROME SAFEGUARDING COMMENTSConsultee Comment · PDF2 Jul 2026View
LANDSCAPE COMMENTSConsultee Comment2 Jul 2026View
BICKENHILL AND MARSTON GREEN PARISH COUNCIL COMMENTSConsultee Comment · PDF30 Jun 2026View
ENVIRONMENT AGENCY COMMENTSConsultee Comment · PDF30 Jun 2026View
ENVIRONMENT AGENCY COMMENTSConsultee Comment · PDF30 Jun 2026View
HAMPTON IN ARDEN PARISH COUNCIL COMMENTSConsultee Comment30 Jun 2026View
HIGHWAY COMMENTSConsultee Comment30 Jun 2026View
NATIONAL HIGHWAYS COMMENTSConsultee Comment · PDF30 Jun 2026View
CANAL & RIVER TRUSTConsultee Comment · PDF30 Jun 2026View
SMBC - PUBLIC PROTECTIONConsultee Comment22 Jun 2026View
SMBC CONTAMINATED LANDConsultee Comment · PDF19 Jun 2026View
NATIONAL HIGHWAYS RESPONSE TN-REV1Report · PDF17 Jun 2026View
CONSTRUCTION_COMPOUND_LAYOUT-2299663Drawing · PDF17 Jun 2026View
CONSTRUCTION_COMPOUND-REVA-2299491Drawing · PDF17 Jun 2026View
-BRICK_BUILT_SUBSTATION-REVA-2299487Drawing · PDF17 Jun 2026View
ACCESS_TRACK-REVA-2299486Drawing · PDF17 Jun 2026View
CUSTOMER_SWITCHGEAR-REVA-2299481Drawing · PDF17 Jun 2026View
RESPONSE TO SMBC PUBLIC PROTECTIONReport · PDF17 Jun 2026View
AEL-19233-E- AR - ARBORCULTURAL REPORTReport · PDF16 Jun 2026View
AEL-19233-C-TPP-TREE PROTECTION PLAN-3Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TPP-TREE PROTECTION PLAN-2Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TPP-TREE PROTECTION PLAN-1Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TIP-TREE IMPACT PLAN-3Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TIP-TREE IMPACT PLAN-2Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TIP-TREE IMPACT PLAN-1Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TCP-TREE CONSTRAINTS PLAN-4Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TCP-TREE CONSTRAINTS PLAN-3Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TCP-TREE CONSTRAINTS PLAN-2Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TCP-TREE CONSTRAINTS PLAN-1Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TCNLP-TREE CONSTRAINTS NEW LAYOUT PLAN-4Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TCNLP-TREE CONSTRAINTS NEW LAYOUT PLAN-3Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TCNLP-TREE CONSTRAINTS NEW LAYOUT PLAN-2Revised Drawing · PDF16 Jun 2026View
AEL-19233-C-TCNLP-TREE CONSTRAINTS NEW LAYOUT PLAN-1Revised Drawing · PDF16 Jun 2026View
BICKENHILL AND MARSTON GREEN PARISH COUNCIL COMMENTS RE CONSULTATIONConsultee Comment · PDF12 Jun 2026View
PHOTOMONTAGESReport · PDF10 Jun 2026View
SMBC - PUBLIC PROTECTIONConsultee Comment10 Jun 2026View
SMBC - DRAINAGE & LLFAConsultee Comment10 Jun 2026View
OPERATION NOISE IMPACT ASESSMENTReport · PDF5 Jun 2026View
STATEMENT OF COMMUNITY INVOLVEMENT MAY 2026Report · PDF5 Jun 2026View
ADAS PLANNING - FARMLAND BIRD MITIGATION AND OFF SITE COMPENSATIONReport · PDF5 Jun 2026View
NTAIONAL HIGHWAYS COMMENTSConsultee Comment · PDF4 Jun 2026View
UPDATED LPA SCREENING OPINIONCorrespondence · PDF4 Jun 2026View
WM POLICE COMMENTSConsultee Comment15 May 2026View
HISTORIC ENGLAND COMMENTSConsultee Comment14 May 2026View
11KV TRANSFORMERS ELEVATIONRevised Drawing · PDF13 May 2026View
11KV TRANSFORMERSRevised Drawing · PDF13 May 2026View
132 KV SUBSTATION ELEVATIONRevised Drawing · PDF13 May 2026View
132KV SUBSTATION PLANRevised Drawing · PDF13 May 2026View
TRANSFORMER ELEVATIONRevised Drawing · PDF13 May 2026View
TRANSFORMERSRevised Drawing · PDF13 May 2026View
UPDATED PLANNING, DESIGN AND ACCESS STATEMENTReport · PDF13 May 2026View
BIODIVERSITY NET GAIN REPORTReport · PDF13 May 2026View
APPENDIX 1 - PROPOSED SITE LAYOUT PLANReport · PDF13 May 2026View
APPENDIX 2 - NEW BOUNDARY -PEAReport · PDF13 May 2026View
APPENDIX 3 - HEDGEROW REPORT UPDATEReport · PDF13 May 2026View
APPENDIX 2 - BREEDING BIRD SURVEYReport · PDF13 May 2026View
APPENDIX 5 - WINTER BIRD SURVEY REPORTReport · PDF13 May 2026View
APPENDIX 6 - BADGER SURVEYReport · PDF13 May 2026View
APPENDIX 7 - BAT REPORTReport · PDF13 May 2026View
APPENDIX 8 - EDNA REPORTReport · PDF13 May 2026View
APPENDIX 9 - ST PETERS LANE GEORGE FENTHAM AND WOODHOUSE LANE PRELIMINARY ECOLOGReport · PDF13 May 2026View
APPENDIX 10 - CLOCK LANE PRELIMINARY ECOLOGICAL APPRAISAL REPORTReport · PDF13 May 2026View
OUTLINE BATTERY SAFETY MANAGEMENT PLANReport · PDF13 May 2026View
AERODROME SAFEGUARDING ASSESSMENTReport · PDF13 May 2026View
AGRICULTURAL LAND CLASSIFICATION SURVEYReport · PDF13 May 2026View
ARBORICULTURAL REPORTReport · PDF13 May 2026View
ARCHAEOLOGICAL DESK BASED ASSESSMENTReport · PDF13 May 2026View
ARCHAEOLOGICAL GEOPHYSICAL SURVEYReport · PDF13 May 2026View
ARCHAEOLOGY DBA REPORTReport · PDF13 May 2026View
BUILT HERITAGE STATEMENTReport · PDF13 May 2026View
CHURCH LANE SWEPT PATH ANALYSISRevised Drawing · PDF13 May 2026View
CHURCH LANE VEGETATION CLEARANCERevised Drawing · PDF13 May 2026View
CHURCH LANE VEGETATION HEIGHTSRevised Drawing · PDF13 May 2026View
CONSTRUCTION TRAFFIC MANAGEMENT PLANReport · PDF13 May 2026View
CRIME IMPACT STATEMENTReport · PDF13 May 2026View
FLODD RISK AND DRAINAGE STRATEGYReport · PDF13 May 2026View
GEOPHYSICAL SURVEY FIGURE 1 - SITE LOCATIONReport · PDF13 May 2026View
GEOPHYSICAL SURVEY FIGURE 2 - SURVEY AREASReport · PDF13 May 2026View
GEOPHYSICL SURVEY FIGURE 2 GS MIN PROC OVERVIEWReport · PDF13 May 2026View
GEOPHYSICAL SURVEY FIGURE 4 GS PROC OVERVIEWReport · PDF13 May 2026View
GEOPHYSICAL SURVEY FIGURE 5 - INTERP OVERVIEWReport · PDF13 May 2026View
GEOPHYSICAL SURVEY FIGURE 6 - GS DETAILReport · PDF13 May 2026View
GEOPHYSICAL SURVEY FIGURE 7 - INTERP DETAILReport · PDF13 May 2026View
GEOPHYSICAL SURVEY FIGURE 8 X-RAYSReport · PDF13 May 2026View
GREEN BELT AND SURFACE WATER SEQUENTIAL SITE SELECTION REPORTReport · PDF13 May 2026View
HYDROLOGY FOOTNOTE REPORTReport · PDF13 May 2026View
LANDSCAPE AND VISUAL ASSESSMENTReport · PDF13 May 2026View
LANDSCAPE MASTERPLANRevised Drawing · PDF13 May 2026View
OUTLINE BATTERY SAFETY MANAGEMENT PLANReport · PDF13 May 2026View
PHASE 1 DESK STUDYReport · PDF13 May 2026View
SITE LAYOUT PLAN (NORTHEAST)Revised Drawing · PDF13 May 2026View
SITE LAYOUT PLAN (SOUTHWEST)Revised Drawing · PDF13 May 2026View
SITE LAYOUT PLANRevised Drawing · PDF13 May 2026View
SITE LOCATION PLANRevised Drawing · PDF13 May 2026View
AVIATION WILDLIFE HAZARD RISK ASSESSMENTReport · PDF13 May 2026View
SOLAR PHOTOVALTAIC GLINT AND GLARE STUDYReport · PDF13 May 2026View
STATEMENT OF COMMUNITY INVOLVEMENTReport · PDF13 May 2026View
BIODIVERSITY METRIC CONDITION ASSESSMENT LAND OFF CLOCK LANEReport13 May 2026View
BIODIVERSITY METRIC CONDITION ASSESSMENTReport13 May 2026View
TOPOGRAHIC SURVEYRevised Drawing · PDF13 May 2026View
TRANSPORT STATEMENTReport · PDF13 May 2026View
TREE CONSTRAINTS LAYOUT PLAN 1Revised Drawing · PDF13 May 2026View
TREE CONSTRAINTS LAYOUT PLAN 2Revised Drawing · PDF13 May 2026View
TREE CONSTRAINTS LAYOUT PLAN 3Revised Drawing · PDF13 May 2026View
TREE CONSTRAINTS LAYOUT PLAN 4Revised Drawing · PDF13 May 2026View
TREE CONSTRAINTS PLAN 1Revised Drawing · PDF13 May 2026View
TREE CONSTRAINTS PLAN 2Revised Drawing · PDF13 May 2026View
TREE CONSTRAINTS PLAN 3Revised Drawing · PDF13 May 2026View
TREE CONSTRAINTS PLAN 4Revised Drawing · PDF13 May 2026View
TREE IMPACT PLAN 1Revised Drawing · PDF13 May 2026View
TREE IMPACT PLAN 2Revised Drawing · PDF13 May 2026View
TREE IMPACT PLAN 3Revised Drawing · PDF13 May 2026View
TREE PROTECTION PLAN 1Revised Drawing · PDF13 May 2026View
TREE PROTECTION PLAN 2Revised Drawing · PDF13 May 2026View
TREE PROTECTION PLAN 3Revised Drawing · PDF13 May 2026View
WASTE MANAGEMENT PLANReport · PDF13 May 2026View
ENVIRONMENTAL IMPACT ASSESSMENT SCREENING REQUESTReport · PDF13 May 2026View
STATEMENT OF COMMUNITY INVOLVEMENTReport · PDF13 May 2026View
LPA ECOLOGY LETTERReport · PDF13 May 2026View
FENCE AND GATE PLANRevised Drawing · PDF13 May 2026View
SKYLARK COMPENSATION ARTICLEReport · PDF13 May 2026View
FENCE AND GATES (ELECTRIC)Revised Drawing · PDF13 May 2026View
PV ARRAYRevised Drawing · PDF13 May 2026View
CCTV CAMERARevised Drawing · PDF13 May 2026View
TYPICAL CABLE CROSS SECTIONRevised Drawing · PDF13 May 2026View
TYPICAL CABLE CROSS SECTION 33KV_1 CIRCUITRevised Drawing · PDF13 May 2026View
TYPICAL CABLE CROSS SECTION 132KV_1 CIRCUITRevised Drawing · PDF13 May 2026View
TYPICAL CABLE CROSS SECTION 132KV_2 CIRCUITRevised Drawing · PDF13 May 2026View
TYPICAL CAMERA COLUMN LAYOUT SUBSTATIONRevised Drawing · PDF13 May 2026View
ENVIRONMENTAL IMPACT ASSESSMENTReport · PDF13 May 2026View
AIR QUALITY COMMENTS - SCOPINGConsultee Comment17 Apr 2026View
AIR QUALITY COMMENTS - SCOPINGConsultee Comment · PDF17 Apr 2026View
LANDSCAPE COMMENTS - OVRALLConsultee Comment · PDF16 Apr 2026View
LANDSCAPE COMMENTS - SCOPINGConsultee Comment · PDF16 Apr 2026View
HERITAGE SCOPING COMMENTSConsultee Comment2 Apr 2026View
NATIONAL HIGHWAYSConsultee Comment · PDF18 Mar 2026View
HISTORIC ENGLAND COMMENTS - EIA SCOPINGConsultee Comment · PDF5 Mar 2026View
SMBC - DRAINAGE & LLFAConsultee Comment5 Mar 2026View
CONTAMINATED LAND COMMENTSConsultee Comment · PDF4 Mar 2026View
CONTAMINATED LAND COMMENTSConsultee Comment4 Mar 2026View
REPRESENTATION - NATURAL ENGLANDConsultee Comment · PDF2 Mar 2026View
ENVIRONMET AGENCY COMMENTS (SCOPING)Consultee Comment · PDF23 Feb 2026View
ENVIRONMENT AGENCY COMMENTS (SCOPING)Consultee Comment · PDF23 Feb 2026View
ENVIRONMENT AGENCY COMMENTS (SCOPING)Consultee Comment · PDF23 Feb 2026View
PUBLIC PROTECTION COMMENTS RE SCOPING REPORTConsultee Comment · PDF17 Feb 2026View
WRITTEN SCEHME OF INVESTIGATION FOR AN ARCHAEOLOGICAL GEOPHYSICAL SURVEYReport · PDF17 Feb 2026View
E-MAIL RE WSI FOR AN ARCHAEOLOGICAL GEPHYSICAL SURVEYCorrespondence · PDF17 Feb 2026View
E-MAIL RE UPDATED DOCUMENTATION.Correspondence · PDF9 Feb 2026View
EIA SCOPING REPORTReport · PDF9 Feb 2026View
UPDATED AGRICULTURAL LAND CLASSIFICATION REPORTReport · PDF9 Feb 2026View
UPDATED BATTERY SAFETY MANAGEMENT PLANReport · PDF9 Feb 2026View
UPDATED DESIGN AND ACCESS STATEMENTReport · PDF9 Feb 2026View
PHASE 1 LAND CONTAMINATION PRELIMINARY RISK ASSESSMENTReport · PDF9 Feb 2026View
HERITAGE COMMENTSConsultee Comment23 Jan 2026View
EXTENSION OF TIMECorrespondence · PDF15 Jan 2026View
NATIONAL HIGHWAYS COMMENTSConsultee Comment · PDF19 Nov 2025View
CONTAMINATED LAND COMMENTSConsultee Comment13 Nov 2025View
CONATMINATED LAND COMMENTSConsultee Comment · PDF13 Nov 2025View
SMBC - DRAINAGE & LLFAConsultee Comment6 Nov 2025View
EXTENSION OF TIMECorrespondence · PDF31 Oct 2025View
ENVIRONMENT AGENCY COMMENTSConsultee Comment · PDF28 Oct 2025View
UPDATED FLOOD RISK ASSESSMENTReport · PDF13 Oct 2025View
SUPERSEDED PHASE 1 DESK STUDYReport · PDF13 Oct 2025View
WOODHOUSE FARM ESSO PLANDrawing · PDF26 Sept 2025View
SMBC - DRAINAGE & LLFAConsultee Comment26 Aug 2025View
NTAIONAL HIGHWAYS COMMENTSConsultee Comment · PDF20 Aug 2025View
NATURAL ENGLAND COMMENTSConsultee Comment · PDF19 Aug 2025View
ENVIRONMENT AGENCY COMMENTSConsultee Comment · PDF14 Aug 2025View
ECOLOGY COMMENTS ON EIA DEVELOPMENTConsultee Comment · PDF14 Aug 2025View
ECOLOGY COMMENTS ON EIA DEVELOPMENTConsultee Comment · PDF14 Aug 2025View
ECOLOGY COMMENTS - EIA DEVELOPMENTConsultee Comment · PDF14 Aug 2025View
LPA LETTER CONFIRMING DEVELOPMENT IS EIA DEVELOPMENTCorrespondence · PDF14 Aug 2025View
E-MAIL TO AGENT CNFIRMING PROPOSL IS EIA DEVELOPMENTCorrespondence · PDF14 Aug 2025View
SMBC - CONTAMINATED LANDConsultee Comment · PDF12 Aug 2025View
SMBC - PUBLIC PROTECTIONConsultee Comment12 Aug 2025View
HISTORIC ENGLAND COMMENTSConsultee Comment11 Aug 2025View
WM POLICE COMMENTSConsultee Comment31 Jul 2025View
BNG METRIC CONDITION ASSESSMENTReport29 Jul 2025View
BNG CONDITION ASSESSMENTReport29 Jul 2025View
STATUTORY BNG METRIC CALCULATIONReport29 Jul 2025View
BNG METRIC CALCULATIONReport29 Jul 2025View
LANDSCAPE MASTERPLANDrawing · PDF29 Jul 2025View
HERITAGE STATEMENTReport · PDF29 Jul 2025View
CASTLE HILLS BIODIVERSITY STATEMENTReport · PDF29 Jul 2025View
SUPERSEDED BIODIVERSITY STATEMENTReport · PDF22 Jul 2025View
SUPERSEDED STATUTORY BIODIVERSITY METRIC CONDITION ASSESSMENTS CASTLE HILLS WOODReport22 Jul 2025View
SUPERSEDED STATUTORY BIODIVERSITY METRIC CONDITION ASSESSMENTS CASTLE HILLS LANDReport22 Jul 2025View
SUPERSEDED THE STATUTORY BIODIVERSITY METRIC CALCULATION CASTLE HILLS TOOL S106Report22 Jul 2025View
SUPERSEDED STATUTORY BIODIVERSITY METRIC CALCULATION CASTLE HILLS TOOL ONG BASELReport22 Jul 2025View
APPLICATION FORM REDACTEDApplication Form · PDF18 Jul 2025View
40FT CUSTOMER SWITCHGEAR-REVADrawing · PDF18 Jul 2025View
40FT SOLAR INVERTER-REVADrawing · PDF18 Jul 2025View
SUBSTATION (SECTION)-REVA 2Drawing · PDF18 Jul 2025View
SUBSTATION (SECTION)-REVADrawing · PDF18 Jul 2025View
132KV SUBSTATION LAYOUT PLAN-REVADrawing · PDF18 Jul 2025View
ACCESS TRACK-REVADrawing · PDF18 Jul 2025View
BRICK BUILT SUBSTATION-REVADrawing · PDF18 Jul 2025View
CABLE TRENCH-REVADrawing · PDF18 Jul 2025View
CCTV CAMERA AND POST-REVADrawing · PDF18 Jul 2025View
FENCE AND GATE-REVADrawing · PDF18 Jul 2025View
CONSTRUCTION COMPOUND-REVADrawing · PDF18 Jul 2025View
PERIMETER FENCE-REVADrawing · PDF18 Jul 2025View
PV DETAILDrawing · PDF18 Jul 2025View
LOCATION PLANDrawing · PDF18 Jul 2025View
PROPOSED SITE PLAN - ALL AREASDrawing · PDF18 Jul 2025View
PROPOSED SITE PLAN - GENERAL SITE LAYOUTDrawing · PDF18 Jul 2025View
PROPOSED LAYOUT PLAN - NORTH LAYOUTDrawing · PDF18 Jul 2025View
PROPOSED LAYOUT PLAN - SOUTH LAYOUT (1 OF 2)Drawing · PDF18 Jul 2025View
PROPOSED LAYOUT PLAN - SOUTH LAYOUT (2 OF 2)Drawing · PDF18 Jul 2025View
PLANNING, DESIGN AND ACCESS STATEMENTReport · PDF18 Jul 2025View
CONSTRUCTION COMPOUND ELEVATIONSDrawing · PDF18 Jul 2025View
CONSTRUCTION COMPOUND LAYOUTDrawing · PDF18 Jul 2025View
SUPERSEDED AGRICULTURAL LAND CLASSIFICATION SURVEYReport · PDF17 Jul 2025View
AERODROME SAFEGUARDING ASSESSMENTReport · PDF17 Jul 2025View
LANDSCAPE AND VISUAL APPRAISALReport · PDF17 Jul 2025View
SUPERSEDED PLANNING, DESIGN AND ACCESS STATEMENTReport · PDF17 Jul 2025View
WINTER BIRD SURVEY REPORTReport · PDF17 Jul 2025View
FLOOD RISK ASSESSMENTReport · PDF17 Jul 2025View
PRELIMINARY ECOLOGICAL APPRAISAL REPORTReport · PDF17 Jul 2025View
SUPERSEDED HERITAGE STATEMENTReport · PDF17 Jul 2025View
BIODIVERSITY STATEMENTReport · PDF17 Jul 2025View
TREE PROTECTION PLANDrawing · PDF17 Jul 2025View
WASTE AUDITReport · PDF17 Jul 2025View
ECOLOGICAL IMPACT ASSESSMENTReport · PDF17 Jul 2025View
TREE CONSTAINTS PLANDrawing · PDF17 Jul 2025View
TREE IMPACT PLANDrawing · PDF17 Jul 2025View
TRANSPORT STATEMENTReport · PDF17 Jul 2025View
TOPOGRAPHICAL SURVEYDrawing · PDF17 Jul 2025View
TREE CONSTAINTSDrawing · PDF17 Jul 2025View
STATEMENT OF COMMUNITY INVOLVEMENTReport · PDF17 Jul 2025View
PHOTOVOLTAIC GLINT AND GLARE STUDYReport · PDF17 Jul 2025View
NOISE IMPACT ASSESSMENTReport · PDF17 Jul 2025View
SUPERSEDED OUTLINE BATTERY SAFETY MANAGEMENT PLANReport · PDF17 Jul 2025View
GREEN BELT AND SURFACE WATER SEQUENTIAL SITE SELECTION REPORTReport · PDF17 Jul 2025View
HYDROLOGY FOOTNOTEReport · PDF17 Jul 2025View
ENVIRONMENTAL IMPACT ASSESSMENT SCREENING REQUESTReport · PDF17 Jul 2025View
BREEDING BIRD REPORTReport · PDF17 Jul 2025View
CONSTRUCTION TRAFFIC MANAGEMENT PLANReport · PDF17 Jul 2025View
CRIME IMPACT STATEMENTReport · PDF17 Jul 2025View
ARCHAEOLOGICAL DESK BASED ASSESSMENTReport · PDF17 Jul 2025View
AVIATION WILDLIFE HAZARD DESIGN RISK ASSESSMENTReport · PDF17 Jul 2025View
ARBORCULTURAL REPORTReport · PDF17 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Refused

Appeal status: Appeal lodged

DECISION NOTICE MAJOR FULL REFUSAL
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.