T1 - shrub mix - cut back all sub-species by 3 metres, clearance of 2 metres above gutter line, T2 - oak - 2 metres clearance of the main building roof, T3 - oak - light crown thin of lateral limbs extending over roof to give 2 metre clearance, T4/5 - mainly elder shrub - cut back all overhanging growth to the original permanent fence lineT7 - cypress - prune lower brunches overhanging to a clearance of 6 metres, T9/10 - cut back to fence line and lift to an estimated 6 metre high, T10-12 - mature oak - cut back to previous cut points and remove deadwood hanging over boundary, T13 - semi mature oak - poor condition, in decline, remove Ivy and reduce crown by 30% to retain tree, T14 - oak - cut back to existing cuts (remove dead line shrub), T15 - light trim lower canopy back to fence line.
T1 - shrub mix - cut back all sub-species by 3 metres, clearance of 2 metres above gutter line, T2 - oak - 2 metres clearance of the main building roof, T3 - oak - light crown thin of lateral limbs extending over roof to give 2 metre clearance, T4/5 - mainly elder shrub - cut back all overhanging growth to the original permanent fence lineT7 - cypress - prune lower brunches overhanging to a clearance of 6 metres, T9/10 - cut back to fence line and lift to an estimated 6 metre high, T10-12 - mature oak - cut back to previous cut points and remove deadwood hanging over boundary, T13 - semi mature oak - poor condition, in decline, remove Ivy and reduce crown by 30% to retain tree, T14 - oak - cut back to existing cuts (remove dead line shrub), T15 - light trim lower canopy back to fence line.
Reference
PL/2015/52294/TPO
Alternative references
PP-04404965
Ward
Shirley South
Parish
Non-Civil Parish Or Community
Agent
The Tyler-Parkes Partnership Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.