Council planning record

The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 6.00m, with a maximum height of 3.00m, and an eaves height of 3.00m

66, Cumberland Avenue, Slough, SL2 1AN

This application was decided on 20 Jul 2026, View the decision notice for this application at Planning Search (<a Href ="https://www.sbcplanning.co.uk/decsearch.php">sbcplanning.co.uk</a>)Reference: Y/21091/000Slough Borough Council

Last published check: 4 Oct 2026, 09:31. Check the council record for more recent changes.

Application location

66, Cumberland Avenue, Slough, SL2 1AN

This record has no verified map location.

Application summary

Status
This application was decided on 20 Jul 2026, View the decision notice for this application at Planning Search (<a Href ="https://www.sbcplanning.co.uk/decsearch.php">sbcplanning.co.uk</a>)
Application type
Permitted Development with Consultation
Received
11 Jun 2026
Validated
11 Jun 2026
Determination deadline
23 Jul 2026
Local authority
Slough Borough Council

Application overview

The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 6.00m, with a maximum height of 3.00m, and an eaves height of 3.00m

Proposal details

Reference
Y/21091/000
Alternative references
PP-15001152
Agent
Janjua
UPRN
AP7L598C5LF58K5GGD

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
Application Form - RedactedApplication Form11 Jun 2026View
Block PlanSubmitted Plans/Documents11 Jun 2026View
Existing & Proposed Ground Floor PlansSubmitted Plans/Documents11 Jun 2026View
Existing ElevationsSubmitted Plans/Documents11 Jun 2026View
Proposed ElevationsSubmitted Plans/Documents11 Jun 2026View
Location PlanSubmitted Plans/Documents11 Jun 2026View
Signed Decision NoticeDecisions20 Jul 2026View
Signed Officer ReportDecisions20 Jul 2026View
Amended PlanAmended Plans20 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Press notice start date

    Published milestoneCouncil source
  3. Received date

    Published milestoneCouncil source
  4. Registration date

    Published milestoneCouncil source
  5. Site notice date

    Published milestoneCouncil source
  6. Valid date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Prior Approval Not Required/Informatives
Signed Decision Notice Signed Officer Report
Planning conditions
  1. Your attention is drawn to It is a requirement under the relevant conditions set out in paragraph A3 of Class A, Part 1, Schedule 2 of the General Permitted Development Order 2015 (as amended) which you will need to comply with and notably sub paragraph (a) which states: (a) the materials used in any exterior work (other than materials used in the construction of a conservatory) must be of a similar appearance to those used in the construction of the exterior of the existing dwellinghouse.
  2. The approved plans are as follows - Location plan; received 11th June 2026 - Block Plan; received 11th June 2026 - Drawing no. ALI/PLAN/001; Dated 8th June 2026; Received 11th June 2026 - Drawing no. ALI/PLAN/003; Dated 8th June 2026; Received 11th June 2026 - Drawing no. ALI/PLAN/002; Dated 20th July 2026; Received 20th July 2026
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.