Council planning record

Proposed demolition of existing buildings and structures, and erection of three Data Centres (Use Class B8) with ancillary substation, offices, associated plant, emergency backup generators and associated fuel storage, landscaping, sustainable drainage systems, car and cycle parking, and new and amended vehicular and emergency access from Poyle Road, site re-levelling, community building, river diversion and other associated works.

Land to the west of Manor Farm, Poyle Road, Colnbrook, Slough, SL3 0BL

Registered applicationReference: P/21160/000Slough Borough Council

Last published check: 1 Oct 2026, 18:48. Check the council record for more recent changes.

Application location

Land to the west of Manor Farm, Poyle Road, Colnbrook, Slough, SL3 0BL

This record has no verified map location.

Application summary

Status
Registered application
Application type
Full Planning
Received
16 Sept 2026
Validated
18 Sept 2026
Determination deadline
16 Dec 2026
Local authority
Slough Borough Council

Application overview

Proposed demolition of existing buildings and structures, and erection of three Data Centres (Use Class B8) with ancillary substation, offices, associated plant, emergency backup generators and associated fuel storage, landscaping, sustainable drainage systems, car and cycle parking, and new and amended vehicular and emergency access from Poyle Road, site re-levelling, community building, river diversion and other associated works.

Proposal details

Reference
P/21160/000
Ward
Colnbrook-and-Poyle
Parish
Colnbrook-with-Poyle
Agent
Mr James Parrott
UPRN
MAN000000000134500

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 226 of 226

DocumentPublishedAction
_redacted Application FormSubmitted Plans/Documents16 Sept 2026View
Environmental Statement – Non-Technical SummarySubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I – Main TextSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 1 – IntroductionSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 10 - Air QualitySubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 11 - Climate ChangeSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 12 - Landscape and Visual Impact StatementSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 13 - Water EnvironmentSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 14 - Effect InterationsSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 15 - Summary of Significant Residual EffectsSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 2 Site and SettingSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 3 - MethodolgySubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 4 - AlternativesSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 5 - Project DescriptionSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 6 - Demolition and ConstructionSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 7 - Socio EconomicsSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 8 - Land ContaminationSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I, Chapter 9 - EcologySubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I - Site Location PlanSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I - cumulative screened zone of theoretical visibility (sztv) planSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I - Summer Viewpoint Location PlanSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I - Winter Viewpoint Location PlanSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I - Aerial Location PlanSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I - Green Belt PlanSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I - Topography PlanSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I - Environmental Designations PlanSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I - Landscape Character PlanSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I - Historic Landscape Classification PlanSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I - Tranquility PlanSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume I - Screened Zone of Theoretical Visibility PlanSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Appendix 0 Table of ContentsSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Statement of CompetencySubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Legislation Policy and GuidanceSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Construction Dust GuildanceSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Planning GuidanceSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Modelling MethodologySubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Professional ExperienceSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Construction MitigationSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Emergency Back Up Generator ResultsSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Climate Legislation Policy and GuidanceSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - GHG Emissions Inventory Inputs and ResultsSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Combination Climate Impact AssessmentSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Landscape Efforts TablesSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Colne Valley Park Trust Consultation ResponseSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Cumulative Effects TableSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Visual Effects TablesSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Sumer Context Views Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Sumer Context Views Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Sumer Context Views Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Sumer Context Views Part 4Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Sumer Context Views Part 5Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Sumer Context Views Part 6Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Sumer Context Views Part 7Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Context Views Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Context Views Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Context Views Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Context Views Part 4Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Context Views Part 5Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Context Views Part 6Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Context Views Part 7Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Summer Type 3 & Type 4 Photwires Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Summer Type 3 & Type 4 Photwires Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Summer Type 3 & Type 4 Photwires Part 4Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Summer Type 3 & Type 4 Photwires Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Type 3 & Type 4 Photwires Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Type 3 & Type 4 Photwires Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Type 3 & Type 4 Photwires Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Type 3 & Type 4 Photwires Part 4Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Type 3 & Type 4 Photwires Part 5Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Summer Type 3 & Type 4 Cumulative Photowires Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Summer Type 3 & Type 4 Cumulative Photowires Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Summer Type 3 & Type 4 Cumulative Photowires Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Summer Type 3 & Type 4 Cumulative Photowires Part 4Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Type 3 & Type 4 Cumulative Photowires Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Type 3 & Type 4 Cumulative Photowires Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Type 3 & Type 4 Cumulative Photowires Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Winter Type 3 & Type 4 Cumulative Photowires Part 4Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - AVR MethodologySubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - FRA and Drainage Strategy Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - FRA and Drainage Strategy Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - FRA and Drainage Strategy Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - FRA and Drainage Strategy Part 4Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Water Use NoteSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Manor Farm Development DrawingsSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Location of Specified Info Within the ESSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - EIA Scoping NoteSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - List of Cumulative SchemesSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - MFW Cable Route Environmental AppraisalSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Manor Farm Cable Route EIA Screening Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Manor Farm Cable Route EIA Screening Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Manor Farm Cable Route EIA Screening Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 4 Manor Farm Cable Route EIA Screening Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Alternative Site AssessmentSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Selection of Planning Application Drawings Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Selection of Planning Application Drawings Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Selection of Planning Application Drawings Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Selection of Planning Application Drawings Part 4Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Selection of Planning Application Drawings Part 5Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Selection of Planning Application Drawings Part 6Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Selection of Planning Application Drawings Part 7Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Selection of Planning Application Drawings Part 8Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Selection of Planning Application Drawings Part 9Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Outline CEMPSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Cut and Fill Drawings Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Cut and Fill Drawings Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Cut and Fill Drawings Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Cut and Fill Drawings Part 4Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Legislation Policy and GuidanceSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - PRA Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - PRA Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - PRA Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - GQRA Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - GQRA Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - GQRA Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - GQRA Part 4Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - GQRA Part 5Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - GQRA Part 6Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - GQRA Part 7Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Ground Gas Risk AssessmentSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - ORS Part 1Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - ORS Part 10Submitted Plans/Documents16 Sept 2026View
_redacted Environmental Statement Volume 2 - ORS Part 2Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - ORS Part 3Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - ORS Part 4Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - ORS Part 5Submitted Plans/Documents16 Sept 2026View
_redacted Environmental Statement Volume 2 - ORS Part 6Submitted Plans/Documents16 Sept 2026View
_redacted Environmental Statement Volume 2 - ORS Part 7Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - ORS Part 8Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - ORS Part 9Submitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Ecological Impact AssessmentSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - BNG AssessmentSubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Shadow HRASubmitted Plans/Documents16 Sept 2026View
Environmental Statement Volume 2 - Arboricultural Impact AssessmentSubmitted Plans/Documents16 Sept 2026View
Manor Farm West Alternative Sites Assessment Part 1Submitted Plans/Documents16 Sept 2026View
Manor Farm West Alternative Sites Assessment Part 2Submitted Plans/Documents16 Sept 2026View
Manor Farm West Archaeological Desk Based Assessment Part 1Submitted Plans/Documents16 Sept 2026View
Manor Farm West Archaeological Desk Based Assessment Part 2Submitted Plans/Documents16 Sept 2026View
_redacted Manor Farm West Aviation Safeguarding AssessmentSubmitted Plans/Documents16 Sept 2026View
Manor Farm West Baseline Lighting SurveySubmitted Plans/Documents16 Sept 2026View
Manor Farm West Built Heritage Impact Assessment Part 1Submitted Plans/Documents16 Sept 2026View
Manor Farm West Built Heritage Impact Assessment Part 2Submitted Plans/Documents16 Sept 2026View
_redacted Manor Farm Cover LetterSubmitted Plans/Documents16 Sept 2026View
Manor Farm West - Design and Access Statement 1 of 3Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Design and Access Statement 2 of 3Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Design and Access Statement 3 of 3Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Economic StatementSubmitted Plans/Documents16 Sept 2026View
Manor Farm West - Energy and Sustainability StatementSubmitted Plans/Documents16 Sept 2026View
Manor Farm West - Flood Risk Assessment and Drainage Stategy Part 1Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Flood Risk Assessment and Drainage Stategy Part 2Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Flood Risk Assessment and Drainage Stategy Part 3Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Flood Risk Assessment and Drainage Stategy Part 4Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Grey Belt AppraisalSubmitted Plans/Documents16 Sept 2026View
Manor Farm West - Illumination Impact ProfileSubmitted Plans/Documents16 Sept 2026View
Manor Farm West - Lighting StrategySubmitted Plans/Documents16 Sept 2026View
Manor Farm West - Minerals Resource AssessmentSubmitted Plans/Documents16 Sept 2026View
Manor Farm West - Needs Assessment Part 1Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Needs Assessment Part 2Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Noise AssessmentSubmitted Plans/Documents16 Sept 2026View
_redacted Manor Farm West - Planning StatementSubmitted Plans/Documents16 Sept 2026View
_redacted Manor Farm West - Plum Rise AssessmentSubmitted Plans/Documents16 Sept 2026View
Manor Farm West - Security Design and Access StatementSubmitted Plans/Documents16 Sept 2026View
Manor Farm West - Security Risk Assessment and Strategy ReportSubmitted Plans/Documents16 Sept 2026View
Manor Farm West - Stage 2 Fire StrategySubmitted Plans/Documents16 Sept 2026View
Manor Farm West - Statement of Community Involvement Part 1Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Statement of Community Involvement Part 2Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Transport Assessment Part 1Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Transport Assessment Part 2Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Transport Assessment Part 3Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Transport Assessment Part 4Submitted Plans/Documents16 Sept 2026View
Manor Farm West - Travel PlanSubmitted Plans/Documents16 Sept 2026View
Manor Farm West - Utility StatementSubmitted Plans/Documents16 Sept 2026View
Location PlanSubmitted Plans/Documents16 Sept 2026View
Existing PlanSubmitted Plans/Documents16 Sept 2026View
Existing Site Sections 1Submitted Plans/Documents16 Sept 2026View
Existing Site Sections 2Submitted Plans/Documents16 Sept 2026View
Demolition PlanSubmitted Plans/Documents16 Sept 2026View
Proposed MasterplanSubmitted Plans/Documents16 Sept 2026View
Proposed Sections A and BSubmitted Plans/Documents16 Sept 2026View
Proposed Sections CSubmitted Plans/Documents16 Sept 2026View
Proposed MFW1 Secured PerimeterSubmitted Plans/Documents18 Sept 2026View
Proposed MFW2 Secured PerimeterSubmitted Plans/Documents18 Sept 2026View
Proposed MFW3 Secured PerimeterSubmitted Plans/Documents16 Sept 2026View
Proposed MFW1 Building Plan Ground FloorSubmitted Plans/Documents16 Sept 2026View
Proposed MFW1 Building Plan First FloorSubmitted Plans/Documents16 Sept 2026View
Proposed MFW1 Building Plan Second FloorSubmitted Plans/Documents16 Sept 2026View
Proposed MFW1 Building Roof PlanSubmitted Plans/Documents18 Sept 2026View
Proposed MFW1 Building Roof Platform PlanSubmitted Plans/Documents18 Sept 2026View
Proposed MFW1 Building Elevations South and EastSubmitted Plans/Documents18 Sept 2026View
Proposed MFW1 Building Elevations North and WestSubmitted Plans/Documents18 Sept 2026View
Proposed MFW1 Building SectionsSubmitted Plans/Documents16 Sept 2026View
Proposed MFW1 Building GuardhouseSubmitted Plans/Documents16 Sept 2026View
Proposed MFW1 Building Substation PlanSubmitted Plans/Documents16 Sept 2026View
Proposed MFW1 Building Substation SectionsSubmitted Plans/Documents16 Sept 2026View
Proposed MFW1 Building Fuel Storage Generator Waste FacilitySubmitted Plans/Documents16 Sept 2026View
Proposed MFW2 Building Plan Ground FloorSubmitted Plans/Documents16 Sept 2026View
Proposed MFW2 Building Plan First FloorSubmitted Plans/Documents16 Sept 2026View
Proposed MFW2 Building Plan Second FloorSubmitted Plans/Documents16 Sept 2026View
Proposed MFW2 Building Roof PlanSubmitted Plans/Documents16 Sept 2026View
Proposed MFW2 Building Roof Platform PlanSubmitted Plans/Documents16 Sept 2026View
Proposed MFW2 Building Elevations South and EastSubmitted Plans/Documents16 Sept 2026View
Proposed MFW2 Building North and WestSubmitted Plans/Documents16 Sept 2026View
Proposed MFW2 Building SectionsSubmitted Plans/Documents16 Sept 2026View
Proposed MFW2 Building GuardhouseSubmitted Plans/Documents16 Sept 2026View
Proposed MFW2 Building Fuel Storage Generator Waste FacilitySubmitted Plans/Documents16 Sept 2026View
Proposed MFW3 Building Plan Groud FloorSubmitted Plans/Documents16 Sept 2026View
Proposed MFW3 Building Plan First FloorSubmitted Plans/Documents16 Sept 2026View
Proposed MFW3 Building Plan Second FloorSubmitted Plans/Documents16 Sept 2026View
Proposed MFW3 Building Roof PlanSubmitted Plans/Documents16 Sept 2026View
Proposed MFW3 Building Roof Platform PlanSubmitted Plans/Documents16 Sept 2026View
Proposed MFW3 Building Elevations South and EastSubmitted Plans/Documents16 Sept 2026View
Proposed MFW3 Building Elevations North and WestSubmitted Plans/Documents16 Sept 2026View
Proposed MFW3 Building SectionsSubmitted Plans/Documents16 Sept 2026View
Proposed MFW3 Building GuardhouseSubmitted Plans/Documents16 Sept 2026View
Proposed MFW3 Building Fuel Storage Generator Waste FacilitySubmitted Plans/Documents16 Sept 2026View
Proposed FencingSubmitted Plans/Documents16 Sept 2026View
Proposed Foul Water Pumping Station Fire Hydrant FacilitiesSubmitted Plans/Documents16 Sept 2026View
Site Wide Landscape MasterplanSubmitted Plans/Documents16 Sept 2026View
Site Wide Landscape Masterplan with MFSubmitted Plans/Documents16 Sept 2026View
MFW Indicative OLA DesignSubmitted Plans/Documents16 Sept 2026View
Detailed Planting Plan Sheet 1 of 4Submitted Plans/Documents16 Sept 2026View
Detailed Planting Plan Sheet 2 of 4Submitted Plans/Documents16 Sept 2026View
Detailed Planting Plan Sheet 3 of 4Submitted Plans/Documents16 Sept 2026View
Detailed Planting Plan Sheet 4 of 4Submitted Plans/Documents16 Sept 2026View
Advanced Planting Location PlanSubmitted Plans/Documents16 Sept 2026View
MFW Illustrative Landscape Sections Sheet 1 of 2Submitted Plans/Documents16 Sept 2026View
MFW Illustrative Landscape Sections Sheet 2 of 2Submitted Plans/Documents16 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Site notice date

    Published milestoneCouncil source
  6. Valid date

    Published milestoneCouncil source
  7. Consultation expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision due date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.