Council planning record

Submission of details pursuant to condition 3 (Samples of external materials), 9 (Electric Charging), 11 (Construction Management Plan), 13, 14 and 15 (Contamination), 18 (Landscaping Scheme), 19 (Ecology Statement), 21 (Surface Water Drainage Scheme) and informative 7 (BNG Plan) of planning permission P/20705/000 dated 03/02/2025

160-174, Humber Way, Slough, SL3 8SU

This application was decided on 17 Feb 2026, View the decision notice for this application at Planning Search (<a Href ="https://www.sbcplanning.co.uk/decsearch.php">sbcplanning.co.uk</a>)Reference: P/20705/001Slough Borough Council

Last published check: 4 Oct 2026, 08:18. Check the council record for more recent changes.

Application location

160-174, Humber Way, Slough, SL3 8SU

This record has no verified map location.

Application summary

Status
This application was decided on 17 Feb 2026, View the decision notice for this application at Planning Search (<a Href ="https://www.sbcplanning.co.uk/decsearch.php">sbcplanning.co.uk</a>)
Application type
Submission of Details
Received
13 Nov 2025
Validated
14 Nov 2025
Determination deadline
8 Jan 2026
Local authority
Slough Borough Council

Application overview

Submission of details pursuant to condition 3 (Samples of external materials), 9 (Electric Charging), 11 (Construction Management Plan), 13, 14 and 15 (Contamination), 18 (Landscaping Scheme), 19 (Ecology Statement), 21 (Surface Water Drainage Scheme) and informative 7 (BNG Plan) of planning permission P/20705/000 dated 03/02/2025

Proposal details

Reference
P/20705/001
Ward
Langley Foxborough
Agent
ET Planning
UPRN
MAN000000000127033

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 2 of 2

DocumentPublishedAction
Signed Decision NoticeDecisions17 Feb 2026View
Signed Officer ReportDecisions17 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Site notice date

    Published milestoneCouncil source
  6. Valid date

    Published milestoneCouncil source
  7. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Conditions Complied With; Informatives
Signed Decision Notice Signed Officer Report
Planning conditions
  1. 1. Condition 3 (Samples of External Materials) – Discharged in accordance with: a) Design and Specification Planning Statement, Prepared by Lime Blue Innovation, Ref. lb1469(rev.b), Dated 24/11/2025, Received 27/11/2025 2. Condition 9 (Electric Charging) – Discharged in accordance with: a) Proposed LV Distribution Installations Site Plan – General Arrangement, Dated 06/11/2025, Received 13/11/2025 b) Distribution Board Schedules, Prepared by Preston Barber, Dated 06/11/2025, Received 13/11/2025 c) Electrical Document Issue Sheet, Dated 06/11/2025, Received 13/11/2025 3. Condition 11 (Construction Management Plan) – Discharged in accordance with: a) Construction Phase Plan, Prepared by Cardo Group, Dated 22/01/2026, Received 22/01/2026 b) Traffic Management Plan, Dated 22/01/2026, Received 22/01/2026 4. Condition 13 (Phase 1 Desk Study and Preliminary Risk Assessment) – Discharged in accordance with: a) Phase 1 Contaminated Land Assessment, Prepared by GeoSmart Information, Dated 09/2025, Received 13/11/2025 5. Condition 14 (Phase 2 Intrusive Investigation Method Statement) – Discharged in accordance with: a) Phase 1 Contaminated Land Assessment, Prepared by GeoSmart Information, Dated 09/2025, Received 13/11/2025 6. Condition 15 (Phase 3 Quantitative Risk Assessment and Site Specific Remediation Strategy) – Discharged in accordance with: a) Phase 1 Contaminated Land Assessment, Prepared by GeoSmart Information, Dated 09/2025, Received 13/11/2025 7. Condition 18 (Landscaping) – Discharged in accordance with: a) Landscape Management Plan, Prepared by Scarp, Dated 11/2025, Received 13/11/2025 b) Planting Proposals, Drawing No. HW-PP-01, Received 13/11/2025 8. Condition 19 (Ecology Statement) – Discharged in accordance with: a) Letter to Discharge of Ecological Condition, Prepared by John Wenman ecological consultancy, Dated 16/09/2025, Received 13/11/2025 9. Condition 21 (Surface Water Drainage Scheme) – Discharged in accordance with: a) Sustainable Drainage Assessment, Prepared by GeoSmart Information Ltd, Dated 21/10/2025, Received 13/11/2025
  2. With regard to these approved conditions, no works shall be carried out other than those hereby confirmed as acceptable without first obtaining permission in writing from the Local Planning Authority.
  3. The conditions as listed above are fully discharged in relation to planning permission P/20705/000 dated 03/02/2025
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.