The development hereby permitted shall be commenced within three years from the date of permission P/10334/025 dated 29/11/2024. REASON To prevent the accumulation of planning permissions, and to enable the Council to review the suitability of the development in the light of altered circumstances and to comply with the provisions of Section 91 of the Town and Country Planning Act 1990.
The development hereby approved shall be implemented only in accordance with the following plans and drawings hereby approved by the Local Planning Authority: a. Drawing No. P21-50-0711-01 Rev B, Dated 01/09/2022, Received 21/08/2024 b. Drawing No. P21-50-0711-02 Rev C, Dated 01/09/2022, Received 21/08/2024 c. Drawing No. P21-50-0711-01 Rev B, Dated 01/09/2022, Received 21/08/2024 d. Drawing No. P21-50-0711-03 Rev G, Dated 01/09/2022, Received 21/08/2024 e. Drawing No. P21-50-0711-05 Rev F, Dated 01/09/2022, Received 21/08/2024 f. Drawing No. P21-50-0711-06 Rev F, Dated 01/09/2022, Received 21/08/2024 g. Electrical Utility Works, Drawing No. 8789/E/1010/E, Dated 09/2024, Received 11/02/2026 REASON To ensure that the site is developed in accordance with the submitted application and to ensure that the proposed development does not prejudice the amenity of the area and to comply with the Policies in the Development Plan. *CONDITION VARIED*
All new external work shall be carried out in materials that match as closely as possible the colour, texture and design of the existing building at the date of this permission. REASON To ensure a satisfactory appearance of the development so as not to prejudice the visual amenities of the locality in accordance with Policy EN1 of The Adopted Local Plan for Slough 2004.
For signs under 10 sq.m the luminance of the internally illuminated sign/s shall not exceed 800 candela per square metre (cd/sq.m). For larger signs over 10 sq.m the luminance of the internally illuminated sign/s shall not exceed 600 candela per square metre (cd/sq.m). REASON: To avoid glare, which could lead to danger to highway users.
The scheme for parking, manoeuvring and the loading and unloading of vehicles shown on the submitted plans shall be laid out prior to the initial occupation of the development hereby permitted and that area shall not thereafter be used for any other purpose. REASON: To enable vehicles to draw off, park, load/unload and turn clear of the highway to minimise danger, obstruction and inconvenience to users of the adjoining highway.
No part of the development shall be occupied until cycle parking has been provided in accordance with the approved plans and the standards set out in the Slough Developers Guide. Once laid out and constructed that area shall not thereafter be used for any other purpose. REASON: To ensure that adequate and convenient cycle storage is provided to accord with the standards set out in the Slough Developers Guide.
The approved details for two active 7kW charging points and associated equipment will be installed to service three parking bays (5-7 inclusive), together with underground ducting and cable provision shall be fully installed in line with drawing 8789/E/101/E and the active charging points shall be fully operational within 12 months of the date of this decision and be retained in good working order at all times in the future. REASON: To provide mitigation towards the impacts on air quality in accordance with Core Policy 8 of The Slough Local Development Framework, Core Strategy 2006 – 2026, Development Plan Document, December 2008, the Slough Low Emission Strategy 2018 – 2025 Technical Report, and the requirements of the National Planning Policy Framework 2023. *CONDITION VARIED*
No vehicle access gates, roller shutters doors or other vehicle entry barriers or control systems shall be installed without first obtaining permission in writing from the Local Planning Authority REASON: In order to minimise danger, obstruction and inconvenience to users of the highway and of the development.
No part of the development shall be occupied until bin storage has been provided in accordance with the approved plans and standards set out in the Slough Developers Guide. REASON: To ensure that adequate refuse storage is provided to serve the development.
The Construction Management Plan will be implemented as approved in line with the Galamast Construction Phase Plan, dated 2024 and the Site Plan before development begins and be maintained throughout the duration of the construction works period. (Previously approved under application number P/10334/021.) REASON: In the interest of minimising danger and inconvenience to vehicular traffic and pedestrian highway users in accordance with policies 7 and 8 of the Core Strategy 2008 and the requirements of the National Planning Policy Framework 2023. *Condition Varied*
It is the view of the Local Planning Authority that the proposed development does improve the economic, social and environmental conditions of the area for the reasons given in this notice and it is in accordance with the National Planning Policy Framework.
No water meters will be permitted within the public footway. The applicant will need to provide way leave to Thames Water Plc for installation of water meters within the site. The applicant is advised that if it is intended to use soakaways as the method of dealing with the disposal of surface water then the permission of the Environment Agency will be necessary.
The development must be so designed and constructed to ensure that surface water from the development does not drain onto the highway or into the highway drainage system
The permission hereby granted shall not be construed as authority to obstruct the public highway by the erection of scaffolding, hoarding, skip or any other device or apparatus for which a license must be sought from the Highway Authority.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.