The development hereby permitted shall be commenced within three years from the date of this permission. REASON To prevent the accumulation of planning permissions, and to enable the Council to review the suitability of the development in the light of altered circumstances and to comply with the provisions of Section 91 of the Town and Country Planning Act 1990.
The development hereby approved shall be implemented only in accordance with the following plans and drawings hereby approved by the Local Planning Authority: (a) Drawing no.PL-01, Dated 01/03/2026, Recd: 18/03/2026 (c) Drawing no.PL-02, Dated 01/03/2026, Recd: 18/03/2026 (d) Drawing no.PL-03, Dated 01/03/2026, Recd: 18/03/2026 (e) Proposed Block Plan, scale 1:500, Recd: 18/03/2026 (f) Existing Location Plan, scale 1:1250, Recd: 18/03/2026 REASON To ensure that the site is developed in accordance with the submitted application and to ensure that the proposed development does not prejudice the amenity of the area and to comply with the Policies in the Development Plan.
Notwithstanding the terms and provisions of The Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order), Schedule 2, Part 1, Classes A, AA, B, C, & E, no extension to the house hereby permitted or buildings or enclosures shall be erected constructed or placed on the site. REASON The rear garden is considered to be only just adequate for the amenity area appropriate for a house of the size proposed. It would be too small to accommodate future development which would otherwise be deemed to be permitted by the provision of the above order in accordance with Policy H14 of The Adopted Local Plan for Slough 2004.
The development hereby approved shall be constructed in accordance with the flood mitigation and resilience measures detailed in the flood risk assessment dated 11 March 2026, Recd 18/03/2026, and flood proofing/resilience techniques of the proposed development shall be incorporated where appropriate. REASON To prevent the risk of flooding in accordance with Core Policy 8 of the Slough Local Development Framework, Core Strategy (2006 - 2026) Development Plan Document, December 2008
The applicant is advised to refer to guidance from the Environment Agency with regards flood resistance and resilient construction.
It is the view of the Local Planning Authority that the proposed development does improve the economic, social and environmental conditions of the area for the reasons given in this notice and it is in accordance with the National Planning Policy Framework.
All new external work shall be carried out in materials that match as closely as possible the colour, texture and design of the existing building at the date of this permission. REASON To ensure a satisfactory appearance of the development so as not to prejudice the visual amenities of the locality in accordance with Policy EN1 of The Adopted Local Plan for Slough 2004.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.