Construction of a proposed single storey front extension to form porch, first floor rear extension to existing dwelling and part loft conversion to create habitable accommodation with dormer extension to the rear and 3no. rooflights to front elevation.
58a, Amanda Court, Slough, SL3 7TE
Registered applicationReference: P/07532/004Slough Borough Council
Last published check: 4 Oct 2026, 10:50. Check the council record for more recent changes.
Application location
58a, Amanda Court, Slough, SL3 7TE
This record has no verified map location.
Application summary
Status
Registered application
Application type
Full Planning
Received
6 Nov 2025
Validated
10 Nov 2025
Determination deadline
5 Jan 2026
Local authority
Slough Borough Council
Application overview
Construction of a proposed single storey front extension to form porch, first floor rear extension to existing dwelling and part loft conversion to create habitable accommodation with dormer extension to the rear and 3no. rooflights to front elevation.
Proposal details
Reference
P/07532/004
Alternative references
PP-14466823
Ward
Langley Marish
Agent
Mrs Anupama Srivastava
UPRN
APU86T8B5885681GAQ
Sign in to view all collected council fields and recorded changes.
The development hereby permitted shall be commenced within three years from the date of this permission. REASON To prevent the accumulation of planning permissions, and to enable the Council to review the suitability of the development in the light of altered circumstances and to comply with the provisions of Section 91 of the Town and Country Planning Act 1990.
The development hereby approved shall be implemented only in accordance with the following plans and drawings hereby approved by the Local Planning Authority: (a) Drawing No. AC-01, Dated 22/10/2025, Recd On 06/11/2025 (b) Drawing No. AC-04, Dated 22/10/2025, Recd On 06/11/2025 (c) Drawing No. AC-05R1, Dated 22/10/2025, Recd On 27/11/2025 REASON To ensure that the site is developed in accordance with the submitted application and to ensure that the proposed development does not prejudice the amenity of the area and to comply with the Policies in the Development Plan.
All new external work shall be carried out in materials that match as closely as possible the colour, texture and design of the existing building at the date of this permission. REASON To ensure a satisfactory appearance of the development so as not to prejudice the visual amenities of the locality in accordance with Policy EN1 of The Adopted Local Plan for Slough 2004.
Notwithstanding the terms and provisions of The Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order), no window, other than hereby approved, shall be formed in the flank elevation of the development. REASON To protect the amenity and privacy of adjacent occupiers in accordance with Policy H15 of The Adopted Local Plan for Slough 2004.
In dealing with this application, the Local Planning Authority has worked with the applicant in a positive and proactive manner through requesting amendments. It is the view of the Local Planning Authority that the proposed development does improve the economic, social and environmental conditions of the area for the reasons given in this notice and it is in accordance with the National Planning Policy Framework.
The window located at first-floor level in the rear elevation serving an ensuite hereby approved shall be glazed with obscure glass and any opening shall be at a high level (above 1.7m) only, and shall be so maintained in perpetuity. REASON To minimise any loss of privacy to adjoining occupiers.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.