Council planning record

Submission of details pursuant to condition 2 (EV Chargers), condition 3 (Passive Electric Vehicle Charging Report) and condition 14 (SuDS) of planning permission P/01272/024 (APP/J0350/W/25/3364859) dated 15/12/2025

The Willow Tree, 62, Station Road, Langley, Slough, SL3 8BT

This application was decided on 07 May 2026, View the decision notice for this application at Planning Search (<a Href ="https://www.sbcplanning.co.uk/decsearch.php">sbcplanning.co.uk</a>)Reference: P/01272/026Slough Borough Council

Last published check: 2 Oct 2026, 06:09. Check the council record for more recent changes.

Application location

The Willow Tree, 62, Station Road, Langley, Slough, SL3 8BT

This record has no verified map location.

Application summary

Status
This application was decided on 07 May 2026, View the decision notice for this application at Planning Search (<a Href ="https://www.sbcplanning.co.uk/decsearch.php">sbcplanning.co.uk</a>)
Application type
Submission of Details
Received
18 Feb 2026
Validated
19 Feb 2026
Determination deadline
15 Apr 2026
Local authority
Slough Borough Council

Application overview

Submission of details pursuant to condition 2 (EV Chargers), condition 3 (Passive Electric Vehicle Charging Report) and condition 14 (SuDS) of planning permission P/01272/024 (APP/J0350/W/25/3364859) dated 15/12/2025

Proposal details

Reference
P/01272/026
Ward
Langley Meads
Agent
Smith
UPRN
10002333799

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
SuDS InformationSubmitted Plans and Details19 Feb 2026View
Proposed Ground Floor PlanSubmitted Plans and Details19 Feb 2026View
MBP CalcsSubmitted Plans and Details19 Feb 2026View
Proposed Below Ground DrainageSubmitted Plans and Details19 Feb 2026View
Proposed Below Ground DrainageSubmitted Plans and Details19 Feb 2026View
Application Form - RedactedApplication Form19 Feb 2026View
Pod PointSubmitted Plans and Details19 Feb 2026View
EV Charging StatementSubmitted Plans and Details19 Feb 2026View
Signed Decision NoticeDecisions7 May 2026View
Signed Officer ReportDecisions7 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Site notice date

    Published milestoneCouncil source
  6. Valid date

    Published milestoneCouncil source
  7. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Conditions Complied With; Informatives
Signed Decision Notice Signed Officer Report
Planning conditions
  1. Condition 2 (EV Chargers) – Discharged in accordance with: a) Drawing no. 23/08/83G – Dated Nov 2024; Rec’d 18/02/2026. b) Drawing no. 23/08/013A – Dated May 2026; Rec’d 05/05/2026. c) Commercial Fix and Commission Solo Pro 7kW - FSM (Free Standing Mount) Three Phase Array Enabling Works Requirements report, prepared by Pod Point Limited – Dated 06/05/2026; Rec’d 06/05/2026. d) EV Charging Statement Rev 0, prepared by KZ Consulting Engineers Ltd - Dated 11/02/ 2026; Rec’d 18/02/2026 e) Quote for works, prepared by Pod Point Limited – Dated 09/02/2026; Rec’d 18/02/2026.
  2. Condition 3 (Passive Electric Vehicle Charging Report) – Discharged in accordance with: a) EV Charging Statement Rev 0, prepared by KZ Consulting Engineers Ltd - Dated 11/02/ 2026; Rec’d 18/02/2026.
  3. Condition 14 (SuDS) – Discharged in accordance with: a) SuDS Information report, prepared by Danks Badnell Architects – Dated February 2026; Rec’d 18/02/2026. b) Drawing no. 10022-MBP-XX-XX-DR-C-0600_P02 – Dated June 2023; Rec’d 30/04/2026. c) Drawing no. 10022-MBP-XX-XX-DR-C-0601_P01 – Dated June 2023; Rec’d 18/02/2026. d) File: 10022 FLOW P03.pfd Network: Storm Network, prepared by MBP Limited – Dated 01/10/2024; Rec’d 18/02/2026. e) Email correspondence from Danks Badnell Architects – Dated 28/04/2026, 30/04/2026 and 01/05/2026; Rec’d 28/04/2026, 30/04/2026 and 01/05/2026.
  4. Conditions 2, 3 and 14 are discharged in accordance with planning permission P/01272/024 (APP/J0350/W/25/3364859) dated 15/12/2025.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.