Council planning record

Construction of a proposed installation of four HGV electric vehicle (EV) charging units on a cantilevered frame, and associated power cabinet, at the depot.

814, Leigh Road, Slough, SL1 4BD

Registered applicationReference: P/00749/008Slough Borough Council

Last published check: 2 Oct 2026, 07:55. Check the council record for more recent changes.

Application location

814, Leigh Road, Slough, SL1 4BD

This record has no verified map location.

Application summary

Status
Registered application
Application type
Full Planning
Received
16 Feb 2026
Validated
17 Feb 2026
Determination deadline
13 Apr 2026
Local authority
Slough Borough Council

Application overview

Construction of a proposed installation of four HGV electric vehicle (EV) charging units on a cantilevered frame, and associated power cabinet, at the depot.

Proposal details

Reference
P/00749/008
Alternative references
PP-14708290
Ward
Northborough & Lynch Hill Valley
Agent
Mr Andrew Lewis
UPRN
MAN000000000103188

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
Lighting assessmentStatement/Proof16 Feb 2026View
Layout Plan - ProposedSubmitted Plans and Details16 Feb 2026View
Block plan ProposedSubmitted Plans and Details16 Feb 2026View
Site/Block Plan - ExistingSubmitted Plans and Details16 Feb 2026View
Location planSubmitted Plans and Details16 Feb 2026View
Design and access statementStatement/Proof16 Feb 2026View
Proposed Lighting PlanSubmitted Plans and Details16 Feb 2026View
Elevations - ProposedSubmitted Plans and Details16 Feb 2026View
Kempower Control Unit with Cable Arm DatasheetStatement/Proof16 Feb 2026View
Kempower Control Unit DatasheetStatement/Proof16 Feb 2026View
File Size: 4024394, HREF: , Reference: Other relevant informationStatement/Proof16 Feb 2026View
Application Form - Without Personal DataApplication Form16 Feb 2026View
Planning Fire StatementSubmitted Plans and Details16 Feb 2026View
Signed Decision NoticeDecisions29 Apr 2026View
Signed Officer ReportDecisions29 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Site notice date

    Published milestoneCouncil source
  6. Valid date

    Published milestoneCouncil source
  7. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved with Conditions; Informatives
Signed Decision Notice Signed Officer Report
Planning conditions
  1. The development hereby permitted shall be commenced within three years from the date of this permission. REASON: To prevent the accumulation of planning permissions, and to enable the Council to review the suitability of the development in the light of altered circumstances and to comply with the provisions of Section 91 of the Town and Country Planning Act 1990.
  2. The development hereby approved shall be implemented only in accordance with the following plans and drawings hereby approved: (a) Drawing No. 001 01, Dated 30/01/2026, Recd on 18/08/2025 (b) Drawing No. 101 01, Dated 30/01/2026, Recd on 18/08/2025 (c) Drawing No. 201 01, Dated 30/01/2026, Recd on 18/08/2025 (d) Drawing No. 301 01, Dated 30/01/2026, Recd on 18/08/2025 (e) Drawing No. 310 01, Dated 30/01/2026, Recd on 18/08/2025 (f) Drawing No. 401 00, Dated 30/01/2026, Recd on 18/08/2025 (g) Kempower Control Unit Brochure, Recd on 18/08/2025 (h) Kempower Control Unit with cable arm and charging cable Brochure, Recd on 18/08/2025 (i) Kempower Power Unit C800 Brochure, Recd on 18/08/2025 (j) Lighting Strategy Document (L0186-LTBL-REP-001 P01), Dated 11/02/2026, Recd on 18/08/2025 (k) Lighting Strategy Document (L0186-LTBL-REP-001 P01), Dated 11/02/2026, Recd on 18/08/2025 REASON: To ensure that the site is developed in accordance with the submitted application and to enure that the proposed development does not prejudice the amenity of the area and to comply with the Policies in the Development Plan.
  3. The lighting strategy hereby approved shall be carried out in accordance with drawing no. 310 01, 401 00 and the Lighting Strategy Document (L0186-LTBL-REP-001 P01), Dated 11/02/2026, Recd on 18/08/2025 REASON To ensure the scheme does not result in light pollution beyond the site that could result in highway safety issues, in accordance with Policy T7 of the Slough Local Plan (Saved Policies).
  4. It is the view of the Local Planning Authority that the proposed development does improve the economic, social and environmental conditions of the area for the reasons given in this notice and it is in accordance with the National Planning Policy Framework.
  5. Any works on this land will need to be undertaken following engagement with National Rail Asset Protection to determine the interface with Network Rail assets, buried or otherwise and by entering into a Basic Asset Protection Agreement, if required, with a minimum of 3months notice before works start. Initially the outside party should contact ASPRO Network Rail Implementation.
  6. All excavations / earthworks carried out in the vicinity of Network Rail’s property / structures must be designed and executed such that no interference with the integrity of that property / structure can occur. If temporary compounds are to be located adjacent to the operational railway, these should be included in a method statement for approval by Network Rail Asset Protection.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.