Scotland · Local authority

Shetland Islands planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Shetland Islands. Search an address, application reference or proposal. Official Shetland Islands website

Collected application statistics

Collected records · All available dates
11,663Searchable applications
149Recorded as pending
98%Approval rate · 8,920 approved or refused records
161Refused applications

8,759 approved · 161 refused · 369 withdrawn. Received dates in our records: 27 Jun 2000 to 19 Oct 2026. Most recent record check: 21 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2010/061/NF

    To develop new salmon site

    Crooie

    Received 24 Nov 2010
  2. Decided2010/060/NC

    To install septic tank sea outfall

    Noustal, East Burrafirth

    Received 20 Dec 2010
  3. Decided2010/059/NS

    To develop a new mussel farm, North of Papa, Swarbacks Minn

    North of Papa

    Received 1 Dec 2010
  4. Unknown2010/058/NF

    To re-position cage block, sea trout farm, Loch of Strom, Whiteness (retrospective)

    Loch of Strom

    Received 24 Nov 2010
  5. Decided2010/057/NC

    To construct a septic tank sea outfall

    Saltoo, Collafirth

    Received 18 Nov 2010
  6. Decided2010/056/NS

    To develop a new mussel farm, North of Papa, Swarbacks Minn

    North of Papa

    Received 16 Nov 2010
  7. Decided2010/055/NS

    To develop a new mussel farm, Northra Voe, Vementry

    Northra Voe

    Received 16 Nov 2010
  8. Unknown2010/054/VS

    To modify an existing mussel farm by extending the mooring containment area to accommodate an additional four 200m double-headrope longlines, Scarvar Ayre 1, Dales Voe

    Scarvar Ayre 1

    Received 16 Nov 2010
  9. Unknown2010/053/NS

    To develop a new mussel farm, East of Papa Little, Cole Deeps, Gonfirth

    East of Papa Little, Cole Deeps, Gonfirth

    Received 15 Nov 2010
  10. Decided2010/051/NS

    To develop a new mussel farm, Hamar Voe, Northmavine

    Hamar Voe

    Received 12 Nov 2010
  11. Unknown2010/050/NS

    To develop a new mussel farm, Houss, Clift Sound

    Houss

    Received 9 Nov 2010
  12. Decided2010/049/NS

    To develop a new mussel farm, Lamba Wick, Swarbacks Minn

    Lamba Wick, Swarbacks Minn

    Received 8 Nov 2010
  13. Unknown2010/048/NS

    To develop a new mussel spat collection site, Scutta Voe, Gruting Voe

    Scutta Voe

    Received 2 Nov 2010
  14. Decided2010/047/NS

    To deploy mussel growing equipment at the site of an existing consented salmon farm, Wester Quarff, Clift Sound by Hjaltland Seafarms Ltd

    Wester Quarff

    Received 2 Nov 2010
  15. Unknown2010/046/NS

    To develop a new mussel farm, East Burwick, Scalloway

    East Burwick, Scalloway

    Received 1 Nov 2010
  16. Decided2010/045/NS

    To develop a new mussel farm, Gruna, Vementry

    Gruna

    Received 1 Nov 2010
  17. Decided2010/044/NS

    To develop a new mussel farm, South Holms Geo, Clift Sound

    South Holms Geo

    Received 1 Nov 2010
  18. Decided2010/043/VS

    To modify an existing mussel farm by extending the mooring containment area to accommodate an additional three 220m double-headrope longlines, Quilse, Gruting Voe

    Quilse

    Received 25 Oct 2010
  19. Decided2010/042/NC

    To vary construction licence 2009/040/NC by changing pipeline route.

    Yell Sound to landfall Orka Voe

    Received 22 Oct 2010
  20. Unknown2010/041/VF

    To modify an existing salmon farm by changing feed barge type to a 35m x 18m shed barge, Hamar Sound, Northmavine

    Hamar Sound

    Received 20 Oct 2010
  21. Unknown2010/040/VF

    To modify an existing salmon farm by amending cages to ten 80m-circumference cages and by changing feed barge location, Grunna Voe North, Dury Voe

    Grunna Voe North, Dury Voe

    Received 15 Oct 2010
  22. Unknown2010/039/TS

    To transfer existing licence 2009/031/TF from Uk Scallops Ltd

    Hamnavoe, Yell

    Received 23 Sept 2010
  23. Decided2010/038/VS

    To modify an existing mussel farm by changing production method from ten 330m longlines deployed all-in year 1 to staggered deployment of seven 330m longlines over a 3 year growing cycle, North Flotta, Weisdale Voe

    North Flotta

    Received 5 Oct 2010
  24. Decided2010/037/NS

    To deploy mussel growing equipment at the site of an existing consented salmon farm, Olligarth, Weisdale Voe

    Olligarth

    Received 5 Oct 2010

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Shetland Islands

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage