Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,574 approved · 147 refused · 323 withdrawn. Received dates in our records: 13 Sept 2001 to 14 Oct 2026. Most recent record check: 20 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
West Sandwick Beach West Sandwick Yell ZE2 9BH
Received 10 Feb 2003Middle Flat 18A Harbour Street Lerwick ZE1 0JS
Received 6 Feb 2002Site 4b Blackhill Ind Est Gremista Lerwick ZE1 0PZ
Received 26 Feb 2009Land west of Scord Quarry Scalloway ZE1 0UQ
Received 2 Feb 2007Fullageo Quarff ZE2 9EY
Received 9 Feb 2005Clett Whalsay ZE2 9AG
Received 23 Feb 2004Sandwick Cottage Bridge End Burra ZE2 9LD
Received 7 Feb 200315 South Road Lerwick Shetland ZE1 0GY
Received 2 Feb 2007Keldagarth Bigton ZE2 9JF
Received 7 Feb 2006Abattoir Staney Hill Industrial Estate Lerwick ZE1 0NA
Received 18 Feb 2011Shendale Hill Sandness ZE2 9PL
Received 1 Feb 2008Warehouse Holmsgarth Road Lerwick ZE1 0PW
Received 25 Jan 2007Gilbert Bain Hospital South Road Lerwick ZE1 0RB
Received 6 Feb 2006Sullom Mine Quarry Sullom ZE2 9RD
Received 8 Feb 2005Toft Mossbank ZE2 9QT
Received 17 Feb 200414A South Gremista Industrial Estate Lerwick Shetland ZE1 0PX
Received 3 Feb 2010Field Next to Castle Gardens Castle Street Scalloway ZE1 0TP
Received 18 Feb 2009Gusselton Dunrossness ZE2 9JQ
Received 25 Jan 2007Station Garage Holmsgarth Road Lerwick ZE1 0PW
Received 6 Feb 2006Little Heog Haroldswick Unst ZE2 9ED
Received 17 Feb 2004Bracknahool East Voe Scalloway ZE1 0US
Received 5 Feb 2003Kilkahoull Muckle Roe ZE2 9QW
Received 6 Feb 2002North Hoo Field Lerwick ZE1 0NU
Received 15 Mar 2011Noosthamar Buddabrake Burrafirth Unst ZE2 9EQ
Received 2 Mar 2010Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage