Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,546 approved · 146 refused · 319 withdrawn. Received dates in our records: 28 Sept 2001 to 14 Oct 2026. Most recent record check: 20 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Millhaugh Sandness ZE2 9PL
Received 23 Mar 2004Sandness ZE2 9PL
Received 21 Mar 2003Sotrigarth Leebotten Sandwick ZE2 9HP
Received 3 Apr 200213 Mansefield Lerwick ZE1 0YA
Received 11 Apr 2002Wirhus Tumblin Bixter Shetland ZE2 9LS
Received 4 Apr 2011Sunshine Cottage Wester Quarff Quarff ZE2 9EZ
Received 12 Mar 20103 Clach-na-Strom Whiteness Shetland ZE2 9LG
Received 13 Mar 20074 West Baila Lerwick ZE1 0SG
Received 7 Mar 2006Saltness Whalsay ZE2 9AD
Received 15 Mar 2004Bellevue Gulberwick ZE2 9TX
Received 7 Mar 2003Sites 1 Brakes Whiteness ZE2 9LJ
Received 11 Mar 2010Unit 4A Blackhill Industrial Estate Gremista Lerwick ZE1 0PZ
Received 8 Apr 2009near Biggins Papa Stour ZE2 9PW
Received 6 Mar 2008Grind Croft Scatness Virkie ZE3 9JW
Received 7 Mar 2006Shetland Heat Energy And Power Ltd Marina Business Park, Gremista Lerwick ZE1 0TA
Received 14 Mar 2005Airwork Scatsta Scatsta Mossbank ZE2 9QP
Received 10 Mar 201037 Leslie Road Lerwick ZE1 0QQ
Received 26 Apr 2011Phase 3 Plot 13 Hillside Gulberwick ZE2 9JX
Received 12 Mar 20085 Anderson Road Lerwick Shetland ZE1 0HP
Received 15 Mar 2007Thule Cottage Dunrossness ZE2 9JB
Received 14 Mar 2006Roadside Cottage Cuppaster, Ulsta Yell ZE2 9BE
Received 21 Mar 2005Fire Station Mid Yell Yell ZE2 9BJ
Received 16 Mar 2004Lesmar Bixter ZE2 9NA
Received 9 Mar 2004Shetland Museum And Archive Hay's Dock Freefield Lerwick ZE1 0NL
Received 21 Feb 2003Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage