Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
11,207Searchable applications
142Recorded as pending
98%Approval rate · 8,675 approved or refused records
145Refused applications

8,530 approved · 145 refused · 318 withdrawn. Received dates in our records: 2 Oct 2001 to 14 Oct 2026. Most recent record check: 20 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Unknown2005/103/PCD

    Sub-divide first floor flat to provide three one-bedroom flats

    The Decca Ladies Drive Lerwick ZE1 0NN

    Received 23 Mar 2005
  2. Unknown2003/103/PCD

    Erect extension

    Vista Whiteness ZE2 9LJ

    Received 18 Mar 2003
  3. Unknown2002/103/PCD

    Erect new dwellinghouse

    adjacent to Kildary Gulberwick ZE2 9JX

    Received 25 Mar 2002
  4. Decided2011/102/PCD

    Erect extension to rear of existing dwelllinghouse

    36 Goodlad Crescent Lerwick ZE1 0QN

    Received 15 Apr 2011
  5. Unknown2009/102/PNA

    To erect general purpose agricultural shed

    Glenburn Croft Effirth Bixter ZE2 9LY

    Received 16 Apr 2009
  6. Decided2008/102/PCO

    Erect dwellinghouse (in outline)

    Seaview Sullom ZE2 9RD

    Received 14 Mar 2008
  7. Unknown2005/102/PCD

    Extend dwellinghouse by erection of garage

    1 Tagon Voe ZE2 9PT

    Received 21 Mar 2005
  8. Unknown2004/102/PCD

    Erect single storey dwellinghouse

    Soundside Weisdale ZE2 9LQ

    Received 22 Mar 2004
  9. Unknown2003/102/PCD

    Erect garage

    Old Trafford Skellister Nesting ZE2 9PP

    Received 18 Mar 2003
  10. Unknown2002/102/PCD

    Retain satellite dish

    The Sycamores Hill Lane Lerwick ZE1 0HA

    Received 25 Mar 2002
  11. Unknown2011/101/PCD

    Highway access and driveway parking provision to the garden area

    6 North Lochside Lerwick Shetland ZE1 0PA

    Received 15 Apr 2011
  12. Unknown2010/101/PCD

    Erect new dwellinghouse & garage (approval of matters specified in conditions - AMC)

    Site by Zoar Girlsta ZE2 9SQ

    Received 25 Mar 2010
  13. Unknown2009/101/PCD

    To construct 2 storage units with external storage area

    Taits Yard Gremista Lerwick ZE1 0PX

    Received 15 Apr 2009
  14. Unknown2007/101/PCD

    Erect conservatory

    Kaila Sandness ZE2 9PL

    Received 15 Mar 2007
  15. Unknown2006/101/PNA

    Erect agricultural building

    Bridge End Burra ZE2 9LD

    Received 21 Mar 2006
  16. Unknown2005/101/PCD

    Install a 6kw aerogenerator to provide storage heating for Unst Heritage Centre. (Hub height 9m, rotor diameter 5.5m)

    Unst Heritage Centre Haroldswick Unst ZE2 9ED

    Received 21 Mar 2005
  17. Unknown2003/101/PCD

    erect dwellinghouse - adjacent to Kvernbakki

    Aith ZE2 9NB

    Received 18 Mar 2003
  18. Unknown2011/100/PCD

    Erect two 9m high flag poles

    Shetland Catch Ltd Gremista Industrial Estate Lerwick ZE1 0PX

    Received 15 Apr 2011
  19. Unknown2010/123/PCD

    To erect garden shed

    Greengables Voe ZE2 9PX

    Received 7 Apr 2010
  20. Unknown2009/123/PCD

    To erect porch extension

    6 Kantersted Court Lerwick ZE1 0GF

    Received 29 Apr 2009
  21. Unknown2011/108/PCD

    Partial take down and re-construction of rear extension

    Restmore North Gluss Ollaberry ZE2 9RU

    Received 26 Apr 2011
  22. Decided2010/108/PCD

    Refurbish existing premises and erect single storey extension

    72 North Road Lerwick ZE1 0PQ

    Received 29 Mar 2010
  23. Unknown2009/108/PCD

    To remove breeze blocks, resurface area with hardcore and create visitor car parking area

    Sheep Pund Fetlar ZE2 9DJ

    Received 21 Apr 2009
  24. Unknown2008/108/PCD

    To erect ground floor flat

    1 Brentham Court Harbour Street Lerwick ZE1 0LR

    Received 14 Mar 2008

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage