Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
11,080Searchable applications
142Recorded as pending
98%Approval rate · 8,614 approved or refused records
145Refused applications

8,469 approved · 145 refused · 312 withdrawn. Received dates in our records: 10 Oct 2001 to 14 Oct 2026. Most recent record check: 19 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Unknown2009/150/PCD

    To install dome camera and associated equipment

    Lloyds TSB Bank Plc Victoria Buildings Esplanade Lerwick ZE1 0LL

    Received 26 May 2009
  2. Unknown2008/150/PNA

    To erect general purpose agricultural building

    Leabrek Brunatwatt Walls ZE2 9PH

    Received 16 Apr 2008
  3. Unknown2006/150/PCD

    Erect 6kw wind turbine on 9 metre mast, rotor blade 5.5 metres in diarmeter

    East Yell Community Hall East Yell Yell ZE2 9AX

    Received 21 Apr 2006
  4. Unknown2003/150/PCD

    Extension to house comprising entrance porch, toilet and conservatory

    Pund Dale Voe ZE2 9PT

    Received 14 Apr 2003
  5. Unknown2008/149/PCD

    To demolish derelict building and erect dwellinghouse

    Marrister Whalsay ZE2 9AE

    Received 16 Apr 2008
  6. Unknown2007/149/PCO

    Erect three dwellinghouses (in outline)

    Cullister Sandwick ZE2 9HH

    Received 18 Apr 2007
  7. Unknown2005/149/PCD

    Install decking and erect sun-lounge extension (south elevation)

    Meadowbank Sandwick Shetland ZE2 9HW

    Received 25 Apr 2005
  8. Unknown2003/149/PCD

    Develop roof space to provide office, storage and associated area

    Toll Clock Shopping Centre North Road Lerwick ZE1 0DE

    Received 14 Apr 2003
  9. Unknown2002/149/PCD

    To erect dwellinghouse

    Plot 8 Pegasus Place Lerwick ZE1 0NZ

    Received 26 Apr 2002
  10. Unknown2009/148/PCD

    To extend dwellinghouse

    North House Whiteness ZE2 9LL

    Received 26 May 2009
  11. Unknown2008/148/PNA

    To erect general purpose agricultural building

    Giggleswick Burravoe Yell ZE2 9AY

    Received 16 Apr 2008
  12. Unknown2007/148/PCD

    Erect two and-a-half storey extension

    Mairsyard Holmsgarth Lerwick ZE1 0PS

    Received 18 Apr 2007
  13. Unknown2006/148/PNA

    Erect general purpose agricultural building

    Westerwick Westerskeld ZE2 9NL

    Received 21 Apr 2006
  14. Unknown2005/148/PCD

    Erect sun-porch on west elevation

    Auldearn House Sandwick Shetland ZE2 9HP

    Received 25 Apr 2005
  15. Unknown2004/148/PCD

    Erect dwellinghouse and garage

    Blydoit Croft East Voe Scalloway ZE1 0US

    Received 9 Apr 2004
  16. Unknown2002/148/PCD

    To erect dwellinghouse

    Plot 6 Pegasus Place Lerwick ZE1 0NZ

    Received 26 Apr 2002
  17. Decided2011/145/PCD

    Residential alterations and extension

    Westcliffe Catfirth Nesting ZE2 9PP

    Received 19 May 2011
  18. Unknown2004/152/LBC

    Dismantle existing wall and garden store, and re-build wall

    Sandlodge Sandwick ZE2 9HP

    Received 9 Apr 2004
  19. Unknown2002/152/PCD

    To erect dwellinghouse

    Croft of Out Town Wethersta Brae ZE2 9QS

    Received 30 Apr 2002
  20. Decided2011/151/PCD

    Erect wind turbine on 15 metre mast with cable connection

    Swinister Ollaberry ZE2 9RX

    Received 24 May 2011
  21. Unknown2010/151/PCD

    Provide access road and services for housing development

    Levenwick ZE2 9HX

    Received 19 Apr 2010
  22. Unknown2009/151/PCD

    To erect 5no 850 kW (approx) wind turbines (hub height 44 metres, blade height 70 metres) access track, sub station building, temporary construction compound and underground cabling

    Garth Gutcher Yell ZE2 9DF

    Received 27 May 2009
  23. Unknown2008/151/PCD

    To erect dwellinghouse and integral garage

    Adjacent To Parkfoot Ringesta Dunrossness ZE2 9JD

    Received 16 Apr 2008
  24. Unknown2007/151/PCD

    Erect extension and garage

    Ness Of Sound Farm Lower Sound Lerwick ZE1 0RN

    Received 18 Apr 2007

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage