Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,457 approved · 144 refused · 311 withdrawn. Received dates in our records: 10 Oct 2001 to 14 Oct 2026. Most recent record check: 19 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
17A Knab Road Lerwick ZE1 0Ax
Received 29 May 2008Ulsta Ferry Terminal Ulsta Yell ZE2 9BD
Received 17 May 2007Clivocast Uyeasound Unst ZE2 9DL
Received 26 May 2006The Knab Lerwick ZE1 0AT
Received 11 May 2004Innadaeks Skellister Nesting ZE2 9PP
Received 30 May 2002Sja-Heim Catfirth South Nesting ZE2 9PP
Received 21 May 2008Bank Of Scotland 115-117 Commercial Street Lerwick ZE1 0DL
Received 8 May 2003Aith ZE2 9NB
Received 22 May 200218 Longland Lerwick ZE1 0SP
Received 27 Jun 2011Sanik Bridge End Burra ZE2 9LD
Received 17 May 2010Glebe --- Sand ZE2 9NQ
Received 24 Jun 2009The Booth Trondra ZE1 0XL
Received 20 May 2008Whitefield Symbister Whalsay ZE2 9AE
Received 9 May 2007School House Sandsound Bixter ZE2 9LU
Received 16 May 2006Easthouse Duncansclate Burra ZE2 9LD
Received 5 May 200411 North Toogs Bridge End Burra ZE2 9JT
Received 27 Jun 2011Hillswick Public Hall Hillswick ZE2 9RW
Received 23 Jun 2009West Voe Sands Virkie ZE3 9JP
Received 17 Jun 2008Lingahoull Girlsta ZE2 9SQ
Received 9 May 200720 Law Lane Lerwick ZE1 0EA
Received 16 May 2006Easthouse Duncansclate Burra ZE2 9LD
Received 5 May 2004Semblister Bixter ZE2 9NG
Received 8 May 200334 Robertson Crescent Lerwick Shetland ZE1 0HS
Received 20 May 2002Sella Ness Industrial Estate Graven Mossbank ZE2 9QR
Received 27 Jun 2011Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage