Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
11,053Searchable applications
142Recorded as pending
98%Approval rate · 8,594 approved or refused records
144Refused applications

8,450 approved · 144 refused · 311 withdrawn. Received dates in our records: 10 Oct 2001 to 14 Oct 2026. Most recent record check: 19 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Unknown2006/240/NID

    Erect four - three bedroomed houses (two semi-detached units)

    Ladies Drive Lerwick ZE1 0NN

    Received 19 Jun 2006
  2. Unknown2005/240/LBC

    Replace six existing single glazed sash and case windows with double glazed sash and case windows of identical glazing pattern

    Lussetter House Mid Yell Yell ZE2 9BT

    Received 12 Jul 2005
  3. Unknown2003/240/PCD

    erect dwellinghouse adjacent to Nordstrand

    Wadbister Girlsta ZE2 9SQ

    Received 17 Jun 2003
  4. Unknown2002/240/VCON

    Change waste water disposal from filter tank and infiltration system to shared sea outfall

    Isleburgh Sullom ZE2 9RE

    Received 25 Jun 2002
  5. Unknown2010/239/PNA

    Construct Shore Base

    Tronafirth Tingwall ZE2 9SF

    Received 21 Jun 2010
  6. Unknown2008/239/PCD

    Install two antennas onto existing tower

    BT Radio Site Symbister Whalsay ZE2 9AA

    Received 7 Jul 2008
  7. Unknown2004/239/PCD

    To install twin 30,000 litre septic tanks at Hamarsgarth and twin 50,000 litre septic tanks at Udhouse and all associated pipework and 340 metre access track

    Hamarsgarth/Udhouse Mossbank ZE2 9TH

    Received 11 Jun 2004
  8. Unknown2003/239/PCD

    Erect single storey extension

    14 Bruce Crescent Lerwick ZE1 0PB

    Received 13 Jun 2003
  9. Unknown2009/159/PCD

    To change use of first floor offices into residential flat

    80 Commercial Street Lerwick ZE1 0DL

    Received 28 May 2009
  10. Unknown2008/159/PNA

    To erect agricultural storage building

    South Punds Levenwick ZE2 9HX

    Received 28 Apr 2008
  11. Unknown2006/159/PCD

    Erect two dwellinghouses, septic tank and sea outfall

    Newing Skellister South Nesting ZE2 9PP

    Received 24 Apr 2006
  12. Unknown2005/159/PNA

    Erect agricultural store

    Moorehouse Aywick East Yell ZE2 9AX

    Received 3 May 2005
  13. Unknown2004/159/PCD

    Install metal security gate on north elevation

    Boots Chemist 173 Commercial Street Lerwick ZE1 0HX

    Received 15 Apr 2004
  14. Decided2011/181/PCD

    Extension and alterations

    Burgadies South Punds Levenwick ZE2 9HX

    Received 17 Jun 2011
  15. Unknown2009/181/PCD

    To erect community building comprising shop, post office, craft workshop and general purpose community room and provide 8 allotments

    Burravoe Yell ZE2 9AY

    Received 16 Jun 2009
  16. Unknown2008/181/PCD

    To erect dwellinghouse

    Ollinsgarth Aithsetter Cunningsburgh ZE2 9HG

    Received 15 May 2008
  17. Unknown2010/145/PNA

    Erect general purpose agricultural building

    Norbister Bridge End Burra ZE2 9LE

    Received 16 Apr 2010
  18. Unknown2009/145/LBC

    Retain temporary storm windows

    Vaila Hall Isle Of Vaila Walls ZE2 9PA

    Received 21 May 2009
  19. Unknown2008/145/FMB

    To install 11,000 volt overhead electric line

    Cullister Sandwick ZE2 9HH

    Received 9 Apr 2008
  20. Unknown2007/145/PCD

    To erect a geological gateway exhibit

    Geological Gateway Exhibit Mavis Grind Northmavine ZE2 9RE

    Received 17 Apr 2007
  21. Unknown2005/145/PCD

    Erect front porch and conservatory at rear

    17 Dalsetter Wynd Dunrossness ZE2 9JJ

    Received 25 Apr 2005
  22. Unknown2004/145/NID

    Erect public toilets

    North Haven Fair Isle ZE2 9JU

    Received 7 Apr 2004
  23. Unknown2003/145/PCD

    Erect single storey extension, south elevation

    Gilbert Bain Hospital South Road Lerwick ZE1 0TB

    Received 11 Apr 2003
  24. Unknown2002/145/PCD

    To erect dwellinghouse

    Construction Centre Group Plot 3 Pegasus Place Lerwick ZE1 0NZ

    Received 26 Apr 2002

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage