Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,432 approved · 143 refused · 311 withdrawn. Received dates in our records: 10 Oct 2001 to 14 Oct 2026. Most recent record check: 18 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Bayview Hoga Voe ZE2 9PX
Received 23 Nov 2004Leagarth House Fetlar ZE2 9DJ
Received 10 Jan 2011Harry's Department Store Esplanade Lerwick ZE1 0LL
Received 30 Oct 2007Aithsetter Cunningsburgh ZE2 9HG
Received 19 Dec 2006Kergord Hatchery Weisdale ZE2 9LW
Received 23 Nov 2004Bank Of Scotland 117 Commercial Street Lerwick ZE1 0EB
Received 30 Oct 2007Peerie House Duke Street Hamnavoe Burra ZE2 9LA
Received 19 Dec 2006Bordigarth Eshaness ZE2 9RS
Received 22 Nov 2004Staney Hill Industrial Estate (west) Staney Hill Lerwick ZE1 0NA
Received 3 Nov 2004Cauldhame Trondra ZE1 0XL
Received 11 Dec 2002Greenmow Cunningsburgh ZE2 9HG
Received 5 Dec 2006Wethersta Industrial Estate Brae ZE2 9QL
Received 1 Nov 2004Vatster Bigton Shetland ZE2 9JF
Received 15 Dec 2003Somewhaur Else 35-39 North Road Lerwick ZE1 0NT
Received 10 Dec 2002Longhill Bigton ZE2 9JF
Received 30 Nov 2010South Ustaness Whiteness ZE2 9LL
Received 23 Oct 2007Shetland Museum And Archives Hay's Dock Freefield Lerwick ZE1 0NL
Received 27 Oct 2004Crossbister Westing Uyeasound Unst ZE2 9DW
Received 5 Dec 2002Thule Bar Esplanade Lerwick ZE1 0LL
Received 15 Nov 2010Skerries Public Hall Out Skerries Skerries ZE2 9AS
Received 14 Nov 2006Fish Meal Factory Sella Ness I Graven Mossbank ZE2 9QR
Received 22 Dec 2005Sandsound Bixter ZE2 9LU
Received 12 Oct 2004Symbister Harbour Whalsay Shetland ZE2 9AA
Received 21 Nov 20039 Fogralea Lerwick ZE1 0SE
Received 15 Nov 2010Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage