Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,886Searchable applications
140Recorded as pending
98%Approval rate · 8,484 approved or refused records
143Refused applications

8,341 approved · 143 refused · 309 withdrawn. Received dates in our records: 9 Jan 2002 to 14 Oct 2026. Most recent record check: 18 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Unknown2002/318/PCD

    Demolish garage and extend dwellinghouse

    Rehoboth Easter Quarff Quarff ZE2 9EZ

    Received 21 Aug 2002
  2. Decided2008/317/LBC

    To replace two windows and repaint building

    62-64 Commercial Street Lerwick ZE1 0DL

    Received 25 Sept 2008
  3. Unknown2007/317/PCD

    Erect sun porch

    24 Bakland Lerwick ZE1 0SX

    Received 25 Jul 2007
  4. Unknown2006/317/NID

    Erect extension to west elevation of school to provide learning support

    Sandwick Junior High Sandwick ZE2 9HH

    Received 22 Aug 2006
  5. Unknown2005/317/PCD

    To change use from workshop to dwellinghouse

    The Work Shop Skyinbow Neigarth Vidlin ZE2 9QB

    Received 26 Sept 2005
  6. Unknown2004/317/LBC

    Emergency repairs to steading, removal of derelict roof, propping of exterior walls and lintols and make wind and watertight

    Ervhouse Huxter Weisdale ZE2 9LQ

    Received 2 Aug 2004
  7. Unknown2002/317/PNA

    Erect general purpose agricultural building

    Kergord Farm Kergord Weisdale ZE2 9LW

    Received 19 Aug 2002
  8. Unknown2010/316/PCD

    Erect 10kw wind turbine on 15m tower

    Longwell Cunningsburgh ZE2 9HG

    Received 18 Aug 2010
  9. Unknown2004/316/PNA

    Erect agricultural shed

    Northouse Papa Stour ZE2 9PW

    Received 2 Aug 2004
  10. Unknown2003/316/PCD

    Change use from store to residential flat

    Second Floor 99 Commercial Street Lerwick ZE1 0BD

    Received 8 Aug 2003
  11. Unknown2002/316/LBC

    Erect two external signs to Library and Learning Centre walls

    Shetland Library Lower Hillhead Lerwick ZE1 0EL

    Received 19 Aug 2002
  12. Unknown2010/302/PCD

    To erect porch

    19 Bank Lane Lerwick ZE1 0DT

    Received 10 Aug 2010
  13. Unknown2008/302/PCD

    To change use of residential garden area to commercial flower and plant centre

    Lerwick

    Received 7 Nov 2008
  14. Unknown2007/302/PCD

    To extend dwellinghouse (west elevation)

    3 Challister Brough Whalsay ZE2 9AN

    Received 17 Jul 2007
  15. Unknown2005/302/ADV

    Erect signboard on the access road to Belmont House

    Belmont Unst ZE2 9DW

    Received 30 Aug 2005
  16. Unknown2004/302/PNA

    Erect general purpose agricultural building

    Silwick Skeld ZE2 9NL

    Received 26 Jul 2004
  17. Unknown2003/302/PCD

    To erect replacement porch

    21 Knab Road Lerwick ZE1 0AX

    Received 29 Jul 2003
  18. Unknown2002/302/PCD

    Re-roof dwellinghouse

    Rockdale East Longfield Dunrossness ZE2 9JH

    Received 12 Aug 2002
  19. Pending Consideration2003/313/SS

    Erect two wind turbines up to 44 metres high (hub height) (Request for Screening Opinion)

    Swaari Field and Ward of Scousburgh ZE2 9HX

    Received 6 Aug 2003
  20. Unknown2006/362/ADV

    To erect replacement signs

    The Royal Bank Of Scotland Plc Main Street Scalloway ZE1 0TR

    Received 4 Oct 2006
  21. Unknown2005/362/PCO

    Remove condition No. 5 of planning permission 2005/181/PCO (requirement for upgrading of Hillside Road), erect dwellinghouse (in outline)

    Hillside Road Sandwick ZE2 9HW

    Received 26 Oct 2005
  22. Unknown2004/362/PCD

    Install 74 cm satellite dish

    2 Anderson Place Lerwick Shetland ZE1 0JE

    Received 3 Sept 2004
  23. Unknown2003/362/PCD

    Erect dwellinghouse

    Tirvister Ollaberry ZE2 9RU

    Received 30 Sept 2003
  24. Unknown2002/362/PCD

    Install 13,500 litre septic tank and associated pipework

    Beach Road Haroldswick Unst ZE2 9ED

    Received 25 Sept 2002

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage