Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,318 approved · 143 refused · 307 withdrawn. Received dates in our records: 9 Jan 2002 to 14 Oct 2026. Most recent record check: 17 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Hermaness National Nature Reserve Unst Shetland
Received 1 Oct 2007Annaslea Upper Baila Lerwick ZE1 0SF
Received 14 Dec 2005Southtown Aith ZE2 9NB
Received 12 Nov 2003Semblister Bixter ZE2 9NG
Received 26 Sept 200710 St Magnus Street Lerwick Shetland ZE1 0JT
Received 13 Dec 2005Haroldswick Unst ZE2 9EF
Received 11 Oct 2004Ladies Mire Busta Road Brae ZE2 9TZ
Received 12 Nov 2003Tesco Stores Limited South Road Lerwick ZE1 0RD
Received 3 Nov 2010Semblister Bixter ZE2 9NG
Received 26 Sept 2007Plot 2 Nesbister Whiteness ZE2 9LJ
Received 6 Oct 2004Lloyds TSB Victoria Buildings Esplanade Lerwick Shetland ZE1 0LL
Received 6 Oct 2004Sixty North Burravoe Brae ZE2 9QJ
Received 11 Nov 2003Quarry Marrister Whalsay ZE2 9AE
Received 6 Oct 2004Hoofields Lerwick ZE1 0NU
Received 3 Nov 2010Waste Management Facility Greenhead Lerwick ZE1 0PU
Received 26 Sept 2007Rear of 28 Hamarsgarth Mossbank ZE2 9TH
Received 6 Oct 2004North Wart Reawick ZE2 9NJ
Received 11 Nov 2003The Looders Hillhead Quarff ZE2 9EY
Received 5 Nov 2002Tingwall Garage Veensgarth Tingwall ZE2 9SB
Received 29 Sept 2004Langbiggin Bixter ZE2 9NA
Received 6 Nov 2003Sullom Voe Oil Terminal Mossbank ZE2 9TU
Received 25 Oct 2010Taingview Hoswick Sandwick ZE2 9HL
Received 15 Dec 200845 St Olaf Street Lerwick ZE1 0EN
Received 20 Sept 2007Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage