Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,243 approved · 143 refused · 306 withdrawn. Received dates in our records: 9 Jan 2002 to 13 Oct 2026. Most recent record check: 16 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Greenhead Base Gremista Lerwick ZE1 0PY
Received 9 Nov 2004North Roe & Lochend Public Hall Skellberry North Roe ZE2 9RY
Received 14 Dec 2010Midlea Mossbank Shetland ZE2 9TL
Received 16 Dec 2003Land at Hill of Gremista Gremista Lerwick ZE1 0PY
Received 15 Sept 2003Clickimin Leisure Centre North Lochside Lerwick ZE1 0PJ
Received 10 Jul 2006SBS Storage Tanks Greenhead Lerwick ZE1 0PY
Received 7 Jul 2008Adjacent to Symbister Primary School Symbister Whalsay ZE2 9AQ
Received 5 Jul 2005Aithsetter Cunningsburgh ZE2 9HG
Received 6 Nov 2002Baxter Chapel Foula Shetland ZE2 9PN
Received 29 Dec 2004Foula Hydro-Electric Scheme Foula ZE2 9PN
Received 29 Dec 2004South Ness Foula ZE2 9PN
Received 29 Dec 2004Skiordar Foula ZE2 9PN
Received 29 Dec 2004West Burn Foula ZE2 9PN
Received 24 Oct 2006Beach Road Haroldswick Unst ZE2 9ED
Received 3 Jun 2005Foula ZE2 9PN
Received 25 May 2006Foula ZE2 9PN
Received 25 May 2006Foula ZE2 9PN
Received 25 May 2006Ringesta Quendale Dunrossness ZE2 9JD
Received 24 May 2005Lower Voe Voe ZE2 9PT
Received 23 May 2005Site Asta Scalloway ZE1 0UQ
Received 17 Dec 2009Adjacent to Sunnyvilla Urafirth ZE2 9RH
Received 3 Oct 2003Aywick East Yell Yell ZE2 9AX
Received 1 Nov 2005Fairview Veensgarth Tingwall ZE2 9SB
Received 31 Oct 2005Land South Of Kirk Vassa Skellister South Nesting ZE2 9PS
Received 29 Aug 2007Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage