Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,136 approved · 137 refused · 286 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Burnside Brough Whalsay ZE2 9AL
Received 21 Mar 2006Former Fire Station North Road Grantfield Lerwick ZE1 0NT
Received 15 Mar 2007Quendale House Commercial Street Lerwick ZE1 0AN
Received 14 Mar 2005Former Fire Station North Road Grantfield Lerwick ZE1 0NT
Received 27 Feb 200811 Market Street Lerwick ZE1 0JP
Received 21 Feb 2005Fairview Tingwall ZE2 9SH
Received 3 Jul 2007North Atlantic Fisheries College Port Arthur Scalloway ZE1 0UN
Received 19 Jul 2010South Whiteness ZE2 9LL
Received 15 May 2006Adjacent to Vindhler Aithsetter Cunningsburgh ZE2 9HG
Received 17 Jun 2011Uyeasound Pier Uyeasound Unst ZE2 9DL
Received 24 May 2011Sellaness Sullom ZE2 9TU
Received 10 Apr 2006Beach Voe of Dale Dale of Walls Walls Shetland ZE2 9PE
Received 21 Mar 2007Sella Ness Industrial Site Mossbank ZE2 9QR
Received 22 Dec 2005Lund Westing Unst ZE2 9DZ
Received 24 Oct 200616 Mounthooly Place Lerwick Shetland ZE1 0BL
Received 31 Dec 20034A Bells Road Lerwick ZE1 0QB
Received 21 Oct 2004Hoop Tangwick Eshaness ZE2 9RS
Received 21 Nov 2006Bannamin Burra ZE2 9LD
Received 28 Dec 2005Hillside Gulberwick ZE2 9JX
Received 28 Oct 2004Muckle Bousta Sandness ZE2 9PL
Received 18 Oct 2005Land to the south of Nederdale housing scheme Nederdale Lerwick ZE1 0SA
Received 12 Oct 2005Tresta Bixter ZE2 9LT
Received 2 Sept 2010Bannamin Bridge End Burra ZE2 9LD
Received 5 Oct 2005Harlsdale Symbister Whalsay ZE2 9AA
Received 2 Aug 2004Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage