Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,487Searchable applications
136Recorded as pending
98%Approval rate · 8,264 approved or refused records
137Refused applications

8,127 approved · 137 refused · 286 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2026/035/PPF

    Change of use of part of dwellinghouse to form a guest house (8 letting bedrooms) with associated shared facilities.

    Drumquin Brae Shetland ZE2 9QJ

    Received 18 Feb 2026
  2. Unknown2026/036/PN

    Prior Notification to erect lean-to sheep housing to an existing shed - 7.6m x 13.7m with 4m max height sloping down to 2.66m

    Columbus C Sellivoe Bridge Of Walls Shetland ZE2 9NR

    Received 18 Feb 2026
  3. Decided2026/037/PPF

    To construct two storey extension to existing dwelling house

    Tananger Gott Tingwall Shetland ZE2 9SE

    Received 19 Feb 2026
  4. Decided2026/038/PPF

    Existing 4 bedroom dwelling: To demolish single storey rooms to the west and detached shed; Construct new extensions to west, south & north elevations to become 5 bedroom dwelling. Incorporates new air source heat pump and septic tank.

    Spiggie House Dunrossness Shetland ZE2 9JE

    Received 19 Feb 2026
  5. Decided2025/067/DCON

    Application for consent, agreement or approval required by planning Condition: 03 (Archaeology) of planning application 2025/067PPF.

    Plot BERRY ROAD Scalloway Shetland

    Received 20 Feb 2026
  6. Decided2026/039/PPF

    To construct sauna, upgrade existing access road and parking area and form new section of footpath.

    St Olaf Sellafirth Yell Shetland ZE2 9DG

    Received 20 Feb 2026
  7. Unknown2026/041/PN

    Prior Notification for Demolition of buildings.

    Utterabrake Brake Burra Shetland ZE2 9LB

    Received 23 Feb 2026
  8. Decided2026/043/PPF

    Proposed demolition of Mavine cottage and erection of new-build replacement 3-bedroom house on site.

    Mavine Cottage Lower Sound Lerwick Shetland ZE1 0RL

    Received 24 Feb 2026
  9. Decided2026/044/PPF

    Install 3 No External ASHP Units and Roof Mounted SPV Renewables to South and East Elevations Scalloway Youth & Community Centre

    Scalloway Youth Centre Trust Main Street Scalloway Shetland ZE1 0TR

    Received 25 Feb 2026
  10. Unknown2026/045/PN

    Prior Notification Forestry General Purpose Shed and adjoining greenhouse 10.4M x 11.4M (total)

    Michaelswood Aith Bixter ZE2 9NB

    Received 25 Feb 2026
  11. Decided2026/004/WL

    To build two breakwaters with fenders and walkway to berth and secure sail-assisted fishing vessel.

    Lunnister Sullom Shetland

    Received 26 Feb 2026
  12. Decided2024/303/DCON3

    Application for consent, agreement or approval required by planning Condition: 06 (Heritage Strategy) of planning application 2024/303/PPF.

    600M West Of The Western Extent Of Lerwick BNG HU 44730 42646

    Received 26 Feb 2026
  13. Decided2024/303/DCON4

    Application for consent, agreement or approval required by planning Condition: 08 (Peat Management Plan) of planning application 2024/303/PPF.

    600M West Of The Western Extent Of Lerwick BNG HU 44730 42646

    Received 26 Feb 2026
  14. Decided2024/303/DCON5

    Application for consent, agreement or approval required by planning Condition: 09 (CEMP) of planning application 2024/303/PPF.

    600M West Of The Western Extent Of Lerwick BNG HU 44730 42646

    Received 26 Feb 2026
  15. Decided2024/303/DCON6

    Application for consent, agreement or approval required by planning Condition: 12 (Construction during Bird Breeding Season) of planning application 2024/303/PPF.

    600M West Of The Western Extent Of Lerwick BNG HU 44730 42646

    Received 26 Feb 2026
  16. Decided2026/046/PPF

    Single storey extension to existing dwellinghouse and new timber deck

    Blimister Bridge End Burra Shetland ZE2 9LE

    Received 26 Feb 2026
  17. Unknown2026/047/PN

    Prior Notification for General Purpose Agricultural Nissan Hut 18M x 8M

    Gremister Yell ZE2 9BL

    Received 26 Feb 2026
  18. Decided2022/303/NMV

    Non-Material Variation to vary permission 2022/303/PPF:- Hall flat roof changed to pitched. Garage eaves raised,house eaves lowered

    Plot Heogan Bressay Shetland

    Received 20 Feb 2026
  19. Unknown2026/048/PN

    Proposed change of existing hardwood windows with like for like Upvc windows

    10 CHROMATE LANE Lerwick Shetland ZE1 0AL

    Received 2 Mar 2026
  20. Decided2026/049/PPF

    To site 3 No. static mobile homes with associated services and drainage and site parking.

    Utterabrake Brake Burra Shetland ZE2 9LB

    Received 2 Mar 2026
  21. Decided2018/269/NMV

    Non Material Variation to vary permission 2018/269/PPF:- Change from individual septic tank and treatment systems to a communal septic tank and treatment system. Change for underground surface water storage system to surface swale devices.

    Catfirth, South Nesting, Shetland ZE2 9PP

    Received 3 Mar 2026
  22. Decided2022/164/NMV

    Non Material Variation to vary permission 2022/164/NMV:- Change from partial soakaway discharging to the Millburn toa communal septic tank and treatment system.

    Catfirth, South Nesting, Shetland ZE2 9PP

    Received 3 Mar 2026
  23. Decided2023/157/NMV

    Non Material Variation to vary permission 2023/157/PPF:- Change from individual septic tank and treatment systems to a communal septci tank and treatment system. Chagne from underground surface water storage system to surface water swale devices.

    1 Air Station Road Catfirth South Nesting Shetland

    Received 4 Mar 2026
  24. Decided2025/278/DCON

    Application for consent, agreement or approval required by planning Condition: 03 (Biodiversity) of planning application 2025/278/PPF.

    9 Air Station Road Catfirth South Nesting Shetland

    Received 4 Mar 2026

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage