Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,221Searchable applications
136Recorded as pending
99%Approval rate · 8,097 approved or refused records
119Refused applications

7,978 approved · 119 refused · 267 withdrawn. Received dates in our records: 2 Apr 2003 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2022/150/PN

    Erect general purpose agricultural shed

    Hillhead A Burravoe Yell Shetland ZE2 9BA

    Received 27 May 2022
  2. Unknown2022/151/PNT

    Installation of new 6m mast to support transmission dish

    Fitful Head Dunrossness Shetland ZE2 9JD

    Received 30 May 2022
  3. Decided2022/152/PPF

    Erect dwellinghouse with air source heat pump

    Plot At Whitefield Symbister Whalsay Shetland ZE2 9AO

    Received 31 May 2022
  4. Unknown2022/017/MPN

    Application for Prior Notification under Class 21B of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): To replace an existing feed barge with a feed barge of a different size, colour and design at the same location within the existing site area

    Belmont Unst Shetland

    Received 31 May 2022
  5. Decided2022/153/PPF

    single storey rear and front extension with associated internal alterations

    5 Sletts Park Lerwick Shetland ZE1 0LN

    Received 3 Jun 2022
  6. Decided2022/154/PPF

    Extension to existing dwellinghouse

    5 Sandwall Lerwick Shetland ZE1 0SH

    Received 6 Jun 2022
  7. Decided2022/156/PPF

    Extensions to north and south elevations and timber decking

    Hallstatt Muness Unst Shetland ZE2 9DL

    Received 7 Jun 2022
  8. Decided2022/157/PPF

    Proposed External refurbishment - Re-roof with natural slate, apply new Sarnafil membrane to east elevation, replace existing windows with hardwood top hung fully reversible double glazed windows

    Brevik Cottages, Burgh Road, Lerwick, Shetland.

    Received 7 Jun 2022
  9. Decided2022/159/LBC

    Section of boundary stone wall to be set back approximately 4m from main road to improve visibility for vehicle users.

    Bankfield Lower Sound Lerwick Shetland ZE1 0RN

    Received 7 Jun 2022
  10. Decided2022/160/LBC

    6No. flag poles installed across the North and West boundary walls of the site (retrospective application)

    Shetland Islands Council Town Hall Hillhead Lerwick Shetland ZE1 0HB

    Received 7 Jun 2022
  11. Decided2022/161/PPF

    6No. flag poles installed across the North and West boundary walls (retrospective application)

    Shetland Islands Council Town Hall Hillhead Lerwick Shetland ZE1 0HB

    Received 7 Jun 2022
  12. Unknown2022/162/PN

    Prior Notification for Demolition of buildings.

    1-10 Garages Midlea Firth Mossbank Shetland

    Received 8 Jun 2022
  13. Decided2022/163/PPF

    Change use to non-residential building (Class 10) - place for public worship and recreational activities plus repair and refurbishment works to building

    Lochside Stores North Lochside Lerwick Shetland ZE1 0PJ

    Received 9 Jun 2022
  14. Decided2022/164/PPF

    To amend existing permission (2018/269/PPF) to remove consent for sea outfall for foul drainage to be redirected to the Millburn

    Catfirth, South Nesting, Shetland ZE2 9PP

    Received 10 Jun 2022
  15. Decided2022/165/PPF

    Erect domestic garage

    Vaelensi Bridge End Burra Shetland ZE2 9LD

    Received 13 Jun 2022
  16. Decided2021/005/DCON1

    Application for consent agreement or approval required by planning Conditions 4 (appointment of PMO); 5 (appointment of ECoW); 6 (appointment of ACoW); 8 (provision of a Peat Management Plan); 17 (provision of an Otter Protection Plan) and 16 (Breeding Birds Protection Plan)

    Land At Lamba Ness, Unst, Shetland

    Received 10 Jun 2022
  17. Decided2021/353/DCON1

    Application to discharge condition 9 (Archaeology) of application ref 2021/353/PPF

    Lower Blackhill Industrial Estate Port Business Park Lerwick Shetland

    Received 16 Jun 2022
  18. Decided2022/166/VCON

    Application to vary condition 14 of S36c consent 2018/335/ECUCON Borrow Pits - Use of Materials

    Viking Energy Wind Farm Central Mainland Shetland

    Received 16 Jun 2022
  19. Decided2022/167/PPF

    To change use of unused retail/storage space to form 2 residential units by removing and replacing internal connecting stairwell to upper levels; replace existing external access doors; replace existing window apertures on east and west elevations with rendered blockwork and to install new window openings; refurbish interior upper floors; install 3 velux windows on eastern roofscape of rear extension and to infill existing rooflight on east elevation

    97 Commercial Street Lerwick Shetland ZE1 0BD

    Received 17 Jun 2022
  20. Decided2022/168/LBC

    To change use of unused retail/storage space to form 2 residential units by removing and replacing internal connecting stairwell to upper levels; replace existing external access doors; replace existing window apertures on east and west elevations with rendered blockwork and to install new window openings; refurbish interior upper floors; install 3 velux windows on eastern roofscape of rear extension and to infill existing rooflight on east elevation

    97 Commercial Street Lerwick Shetland ZE1 0BD

    Received 17 Jun 2022
  21. Decided2022/169/PPF

    Demolish existing byre & existing entrance porch; erect single-storey extension including sun porch and separate garage; install ASHP.

    Grutquoy Stennestwatt Walls Shetland ZE2 9PH

    Received 20 Jun 2022
  22. Decided2022/170/PPF

    Erect dwellinghouse with attached garage and air source heat pump

    Plot West Of Lynnside Wethersta Brae Shetland ZE2 9QL

    Received 21 Jun 2022
  23. Decided2022/171/TCA

    Two trees - Remove

    7 Charlotte Street Lerwick Shetland ZE1 0JL

    Received 22 Jun 2022
  24. Decided2021/303/DCON1

    Application to discharge condition 3 of planning application ref. 2021/303/PPF

    Scalloway Castle Castle Street Scalloway Shetland

    Received 16 Jun 2022

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage